Loading...
HomeMy WebLinkAboutS002 - 297JGW2 ID1 3 ID1 5 ID1 EXERCISE BEDROOM #6 W.I.C. UNFINISHED STORAGE BATH #6 THEATER / MEDIA UNFINISHED STORAGE/ MECHANICAL RECREATION WET BAR BILLIARDS WINE HALF BATH 2/8 2/82/6 2/8 3/0‐8/0 2/83/0 2/62/8 CW14 (2/5-4/0) CW14 (2/5-4/0) CW14 (2/5-4/0) CXW14 (3/0-4/0)CXW14 (3/0-4/0)CXW14 (3/0-4/0) CXW14 (3/0-4/0)2‐2/0‐8/02/6 CN14 (1/9-4/0)CN14 (1/9-4/0) 2/8 MECHANICAL BULKHEAD DROPPED STEEL BEAM /W STEEL COL. EACH END DROPPED STEEL BEAM w/3 1/2" ADJUSTABLE STEEL COLUMNS EACH END DROPPED WOOD BEAM W/ SOLID BEARING EACH END DROPPED WOOD BEAM W/ SOLID BEARING EACH END ZERO THRESHOLD SHOWER ABOVE CENTERLINE OF TOILET CENTERLINEOF TOILETRAISED WOOD PLATFORMS 6" EACH. 14" D. BULKHEAD 14" D. BULKHEAD14" D. BULKHEAD±9'-9 1/2"H. CLG. ±9'-9 1/2"H. CLG. ±9'-9 1/2"H. CLG.4" 3' - 7"5 1/2"14' - 2" 5 1/2" 14' - 8" 4"4" 12' - 8" 4"6' - 8"5 1/2" 5' - 10" 3' - 0" 3 1/2" 4' - 4" 5 1/2"2' - 0"5 1/2"4' - 2" 8' - 0"6' - 8" 5 1/2" 5' - 10" 3 1/2" 8' - 0 1/2" 5 1/2" 6' - 3" 4" 11' - 5 1/2" 3 1/2" 4' - 11 1/2" 11" 5' - 7 1/2" 7' - 4" 5' - 7" 4"4"18' - 6 1/2" 11" 4' - 2" 5 1/2" 7' - 9" 4" 12' - 0" 3 1/2" 3' - 10" 3 1/2" 5' - 0" 3 1/2" 4' - 0" 3 1/2" 1' - 1 1/2" 18' - 1" 11" 2' - 0" 11" 5' - 11 1/2" 8 1/2" 12' - 2" 3 1/2" 3' - 4" 6"11" 15' - 0 1/2" 11"1' - 10 1/2"1' - 0"4" 12' - 10" 10"18' - 2"4" 11"10' - 8" 3 1/2" 4' - 0 1/2" 4" 4" 25' - 8 1/2" 3 1/2" 1' - 10" 3 1/2" 20' - 0" 11" 18' - 10" 3 1/2" 18' - 6"6" 5' - 4" 1' - 0" 3' - 0" 1' - 0" 8' - 2"5' - 8" 12' - 6"3' - 0"1' - 4 1/2"3 1/2"10' - 0 1/2" 4" 4"10' - 0 1/2" 3 1/2" 4" 7' - 8 1/2" 3 1/2" 8' - 1 1/2" 3 1/2" 5' - 0" 3 1/2" 6' - 0" 3 1/2" 5' - 4 1/2" 3 1/2" 3' - 8" 3 1/2" 18' - 1" 3 1/2" 5' - 6" 6"UP 18 R 16 TR@ 10" R.C.40 1/2"H. WALL4' - 0"OPEN TO ABOVELOAD-BEARING WALL 1' - 11 1/2"LOAD-BEARING WALL LOAD-BEARING WALL LOAD-BEARING WALL LOAD-BEARING WALL 3' - 10 1/4" 3' - 10 1/4"2' - 2" 2' - 2"FULL-LITE GLASS13' - 0 1/2" 3 1/2"2' - 1 1/2"20' - 0" 1' - 6" 4' - 1 1/2" 16' - 1 1/2"9' - 1 1/2"4' - 4" 5 1/2"6' - 7 1/2" LOAD-BEARING WALL 2 A5 2' - 5"0"3 1/2"6' - 6" 3 1/2" 6' - 3" 11 1/2"4' - 2"5 1/2" 1' - 6" 3' - 0"2x6 STUD WALL 42" FIRPLACE SET ON 5 1/2" H. PLATFORM R.O. 49"W x 41 1/2"H X 23"D 14" D. BULKHEAD MECHANICAL BULKHEAD DUCT TRUNK LINE FLUSH WOOD BEAM LOCATED BENEATH STONE FACE ABOVE 3' - 4"2x6 STUD WALL 2x6 STUD WALL OPEN RAIL UP THREE RISERS LANDING STRAIGHT ACROSS 6"6"6"6"2' - 0"1' - 0"CUSTOMER:PROJECT NAME: LOCATION:DRAWING TITLE: DRAWN BY: Wedgewood Building Co., LLC 317.669.6300 32 First Street NE Carmel, IN 46032 www.wedgewoodbc.com Copyright c 2015 Wedgewood Building Co. LLC. 9/6/2018 1:14:33 PM A5 The Brown Residence 297JGWV Lot #297 Westvale @ Jackson's Grant BASEMENT FRAMING SBSROUGH FRAMING NOTES: 1. DOORS ARE TO BE 4.5" OFF OF WALL INTERSECTIONS OR CENTERED IN THE WALL U.N.O. 2. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL. 3. 8'-0"H. TYPICAL INTERIOR DOOR HEIGHT AT LOWER LEVEL Rev.No. Date Description 1/4" = 1'-0"1 BASEMENT ROUGH FRAME PLAN 1/4" = 1'-0"2 MEDIA PLATFORM SECTION Approved For Construction Owner Signature: ____________________ Date: _________ Owner Signature: ____________________ Date: _________ Architect Signature: ____________________ Date: _________ Wedgewood Building Co. ,LLC 09/12/18 William Hohlt