Loading...
HomeMy WebLinkAbout330139 09/19/18 `+°0 ""' CITY OF CARMEL, INDIANA VENDOR: 366795 ONE CIVIC SQUARE H W C ENGINEERING CHECK AMOUNT: $*****8,191.80* r. ?� CARMEL, INDIANA 46032 601 SOUTH 3RD ST CHECK NUMBER: 330139 9M�ioN�` TERRE HAUTE IN 47807 CHECK DATE: 09/19/18 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 250 4350900 101740 201816150002 8,191.80 HOME PLACE STRUCTURE VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201 (Rev.1995) Vendor# 366795 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER H W C ENGINEERING IN SUM OF$ CITY OF CARMEL 601 SOUTH 3RD ST An invoice or bill to be properly itemized must show:kind of service,where performed,dates service rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc. TERRE HAUTE, IN 47807 Payee $8,191.80 Purchase Order# ON ACCOUNT OF APPROPRIATION FOR Engineering Terms Date Due PO# ACCT# DATE INVOICE# DESCRIPTION DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT 101740 2018-161-S- 43-509.00 $8,191.80 I hereby certify that the attached invoice(s),or 9/1/18 2018-161-S- ASA 1-Small Structure and Storm Sewer $8,191.80 0000002 0000002 Inventory:Home Place 2200 250 bill(s)is(are)true and correct and that the 2200 250 materials or services itemized thereon for which charge is made were ordered and received except Wednesday, September 12, 2018 Jeremy Kashman Director I hereby certify that the attached invoice(s),or bill(s), is(are)true and correct and I have audited same in accordance with IC 5-11-10-1.6 20 Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer Confidence in the built environment. 601 South 3rd Street ENGINEERING: Terre Haute,Indiana 47807 vr�:tv.hv;er;nglnaerEng.eom Carmel City of Attn: Kate Lustig One Civic Square Carmel, IN 46032 P. O. i01-AH-O September 1,2018 2Sr0 -'-F3 5 09 O C:) Invoice No: 2018-161-S-0000002 Project 2018-161-S Carmel-ASA 1:Home Place PO#101740 -Professional-Services-from July-30.-2018-to August 26.-2018 — -- - - -- - - - — - -- - - -- - - - - - - - - --- - -- - - - - - - - -- - -- - -- --- - - - - -- -- -- -- - - Phase 10 PO#101740 Professional Personnel Hours Rate Amount Sr Project Manager 4.00 196.00 784.00 Designer/Technican 11.50 100.00 1,150.00 Survey Lead 61.50 100.00 6,150.00 Totals 77.00 8,084.00 Total Labor 8,084.00 Reimbursable Expenses Travel&Lodging 8/19/2018 HWC Engineering Mileage AN 081518 28.16 8/19/2018 HWC Engineering Mileage AN 081618 26.40 8/19/2018 HWC Engineering Mileage AN 081718 29.04 8/19/2018 HWC Engineering Mileage AN 081818 24.20 Total Reimbursables 1.0 times 107.80 107.80 Billing Limits Current Prior To-Date Total Billings 8,191.80 8,527.25 16,719.05 Limit 44,000.00 Remaining 27,280.95 Total this Phase $8,191.80 Total this Invoice $8,191.80 Billings to Date Current Prior Total Labor 8,084.00 8,527.25 16,611.25 Expense 107.80 . 0.00 107.80 Totals 8,191.80 8,527.25 16,719.05 Indianapolis I Terre Haute j Lafayette I Scottsburg www.hwcenginecting.com