HomeMy WebLinkAbout330202 09/19/18 y "p CITY OF CARMEL, INDIANA VENDOR: 00350023
j; �1• ONE CIVIC SQUARE RQAW CORPORATION CHECK AMOUNT: $****41,567.50*
CARMEL, INDIANA 46032 8770 NORTH STREET CHECK NUMBER: 330202
SUITE 110 CHECK DATE: 09/19/18
FISHERS IN 46038
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
202 4340100 101671 6186151 41,567.50 INDOT LPA CONSULT CTR
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201 (Rev.1995)
Vendor# 00350023 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
RQAW CORPORATION IN SUM OF$ CITY OF CARMEL
4755 KI NGSWAY DR#400 An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
INDIANAPOLIS, IN 46205-1547
Payee
$41,567.50
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
Engineering
Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
101671 6186151 43-401.00 $41,567.50 1 hereby certify that the attached invoice(s),or 8/31/18 6186151 Carmel Drive and Old Meridian-Cl $41,567.50
2200 202 2200 202
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Wednesday, September 12, 2018
Jeremy Kashman
Director
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
, 20—
Cost
20Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
RGAW
8770 North St.,Ste.110
Fishers,IN 46038
317.588.1798
INTENTIONAL INNOVATION
City of Carmel Invoice number 6186151
One Civic Square Date 08/31/2018
Carmel,IN 46032
Kate Lustig Project 216-041.2 Carmel Drive/Old Meridian
P d tot 4�l Street Roundabout Construction
Inspection
Billing Period August 1-August 31,2018 Z 02 — L4 4 01 O O
klustig@carmel.in.gov,Mail Hard Copies in Duplicate
Invoice Summary
Contract Prior Total Current
Description Amount Billed Remaining Billed Billed
CONSTRUCTION INSPECTION-RQAW 155,847.18 43,397.84 70,881.84 84,965.34 41,567.50
CONSTRUCTION INSPECTION-SHREWSBERRY 4,820.02 0.00 4,820.02 0.00 0.00
Total 160,667.20 43,397.84 75,701.86 84,965.34 41,567.50
Professional Fees
Billed
Hours Rate Amount
RPR
Andrew J.Flower
Billable Time 187.50 120.82 22,653.75
Subtotal 187.50 22,653.75
Christopher N.Jobe
Billable Time 14.00 120.82 1,691.48
Subtotal 14.00 1,691.48
Subtotal 201.50 24,345.23
RPR-OT
Andrew J.Flower
Billable Time 62.50 140.90 8,806.25
Subtotal 62.50 8,806.25
Subtotal 62.50 8,806.25
Construction Inspector
Jason M.Willy
Billable Time 83.00 95.40 7,918.20
Subtotal 83.00 7,918.20
Subtotal 83.00 7,918.20
Construction Inspector-OT
Jason M.Willy
Billable Time 4.00 111.25 445.00
Subtotal 4.00 445.00
Subtotal 4.00 445.00
City of Carmel Invoice number 6186151 Invoice date 08!31/2018
Page 1 of 8
City of Carmel Invoice number 6186151
Project 216-041.2 Carmel Drive/Old Meridian Street Roundabout Construction Inspection Date 08/31/2018
Reimbursables
Billed
Units Rate Amount
Miles 139.00 0.38 52.82
Subtotal 52.82
Invoice total 41,567.50
City of Carmel Invoice number 6186151 Invoice date 0813112018
Page 2 of 8
City of Carmel Invoice number 6186151
Project 216-041.2 Carmel Drive/Old Meridian Street Roundabout Construction Inspection Date 08/31/2018
Invoice Supporting Detail
216-041.2 Carmel Drive/Old Meridian Street Roundabout Construction Inspection
Construction Inspection-RQAW Phase Status:Active
Billing Cutoff:08/31/2018
Date Units Rate Amount
Labor WIP Status:Billable
RPR
Andrew J.Flower
Billable Time 08/01/2018 11.00 120.82 1,329.02
Billable Time 08/02/2018 9.00 120.82 1,087.38
Billable Time 08/03/2018 7.50 120.82 906.15
Billable Time 08/06/2018 10.00 120.82 1,208.20
Construction Administration
Billable Time 08/07/2018 10.00 120.82 1,208.20
Construction Administration
Billable Time 08/08/2018 10.00 120.82 1,208.20
Construction Administration
Billable Time 08/09/2018 10.00 120.82 1,208.20
Billable Time 08/13/2018 11.50 120.82 1,389.43
Billable Time 08/14/2018 11.00 120.82 1,329.02
Billable Time 08/15/2018 9.00 120.82 1,087.38
Billable Time 08/16/2018 8.00 120.82 966.56
Billable Time 08/17/2018 0.50 120.82 60.41
Billable Time 08/18/2018 8.00 120.82 966.56
Billable Time 08/20/2018 10.00 120.82 1,208.20
Billable Time 08/21/2018 10.50 120.82 1,268.61
Billable Time 08/22/2018 11.50 120.82 1,389.43
Billable Time 08/25/2018 9.00 120.82 1,087.38
Billable Time 08/27/2018 11.50 120.82 1,389.43
Billable Time 08/28/2018 11.50 120.82 1,389.43
Billable Time 08/29/2018 8.00 120.82 966.56
Subtotal 187.50 22,653.75
Christopher N.Jobe
Billable Time 08/08/2018 4.00 120.82 483.28
Billable Time 08/15/2018 4.00 120.82 483.28
Billable Time 08/22/2018 2.00 120.82 241.64
Billable Time 08/29/2018 4.00 120.82 483.28
Subtotal 14.00 1,691.48
RPR-OT
Andrew J.Flower
Billable Time 08/03/2018 1.50 140.90 211.35
Contract administration
Billable Time 08/09/2018 1.00 140.90 140.90
Contract administration
Billable Time 08/10/2018 9.50 140.90 1,338.55
Contract administration
Billable Time 08/17/2018 7.50 140.90 1,056.75
Contract administration
City of Cannel Invoice number 6186151 Invoice date 08131/2018
Page 3 of 8
City of Carmel Invoice number 6186151
Project 216.041.2 Carmel Drive/Old Meridian Street Roundabout Construction Inspection Date 08/31/2018
Invoice Supporting Detail
216-041.2 Carmel Drive/Old Meridian Street Roundabout Construction Inspection
Construction Inspection-RQAW Phase Status:Active
Billing Cutoff:08131/2018
Date Units Rate Amount
Labor WIP Status:Billable
RPR-OT
Andrew J.Flower
Billable Time 08/22/2018 0.50 140.90 70.45
Contract administration
Billable Time 08/23/2018 11.00 140.90 1,549.90
Contract administration
Billable Time 08/24/2018 11.00 140.90 1,549.90
Contract administration
Billable Time 08/29/2018 1.00 140.90 140.90
Contract administration
Billable Time 08/30/2018 11.50 140.90 1,620.35
Contract administration
Billable Time 08/31/2018 8.00 140.90 1,127.20
Contract administration
Subtotal 62.50 8,806.25
Construction Inspector
Jason M.Willy
Billable Time 08/02/2018 4.00 95.40 381.60
Soit Stabilization
Billable Time 08/03/2018 6.00 95.40 572.40
Soil Stabilization
Billable Time 08/06/2018 8.00 95.40 763.20
Billable Time 08/07/2018 7.00 95.40 667.80
Billable Time 08/08/2018 8.00 95.40 763.20
Billable Time 08/17/2018 8.00 95.40 763.20
Project inspection
Billable Time 08/24/2018 2.00 95.40 190.80
Project inspection
Billable Time 08/27/2018 9.00 95.40 858.60
Billable Time 08/28/2018 11.00 95.40 1,049.40
Billable Time 08/29/2018 4.00 95.40 381.60
Billable Time 08/30/2018 12.00 95.40 1,144.80
Billable Time 08/31/2018 4.00 95.40 381.60
Subtotal 83.00 7,918.20
Construction Inspector-OT
Jason M.Willy
Billable Time 08/31/2018 4.00 111.25 445.00
Project inspection
Subtotal 4.00 445.00
Labor total 351.00 41,514.68
gxpense WIP Status:Billable
In-house Expense
City of Carmel Invoice number 6186151 Invoice date 08/3112018
Page 4 of 8
City of Carmel Invoice number 6186151
Project 216.041.2 Carmel Drive101d Meridian Street Roundabout Construction Inspection Date 08/31/2018
Invoice Supporting Detail
216-041.2 Carmel Drive/Old Meridian Street Roundabout Construction Inspection
Construction Inspection-RQAW Phase Status:Active
Billing Cutoff:08/31/2018
Date Units Rate Amount
Expense WIP Status:Billable
In-house Expense
General Mileage 08/31/2018 139,00 0.38 52.82
Subtotal 139.00 52,82
Expense total 139.00 52.82
Phase Summary
Contract Billed % Remaining %
Labor 155,847.18 84,785.60 54 71,061.58 46
Expense 179.74 -179.74
Total 155,847.18 84,965.34 55 70,881.84 45
Construction Inspection-Shrewsberry Phase Status:Active
Billing Cutoff:08/31/2018
Date Units Rate Amount
WIP Status:
Subtotal 0.00
total 0.00
Phase Summary
Contract Billed % Remaining
Consultant 4,820.02 4,820.02 100
Total: 4,820,02 4,820.02 100
Invoice Summary
Contract Billed % Remaining
Labor 155,847,18 84,785.60 54 71,061.58 46
Expense 179.74 -179.74
Consultant 4,820.02 4,820.02 100
Total 160,667.20 84,965.34 53 75,701.86 47
City of Carmel Invoice number 6186151 Invoice date 08/31/2018
Page 5 of 8
City of Carmel Invoice number 6186151
Project 216-041.2 Carmel Drive/Old Meridian Street Roundabout Construction Inspection Date 08/31/2018
Andrew J.Flower
Timesheet Date:0 8131120 1 8
Project Phase Activity Employee Type Sal-25 Sun-26 Mon-27 Tue-28 Wed-29 Thu-30 Fri-31 Total
Carmel Drive101d Meridian Street COnslruction Inspection-RQAW Billable Time RPR-OT 1,00 11.50 8.00 20.60
Roundabout Construction
Inspection
Cartel Drivel0ld Meridian Street Construction Inspection-RQAW Billable Time RPR 9.00 11,50 11.50 8.00 40.00
Roundabout Construction
Inspection
Regulartotal 9.00 0.00 11.50 11.50 8.00 0.00 0.0040AD
Overtimatotal EOO 0.00 0.00 0.00 1.00 11.50 8.00 20,5D
Tlmeshoettotal 0.00 11.50 11.50 9.00 11.50 8.00 60,50
Timesheet Date:08124/2018
Project Phase Activity Employee Type Sat-18 Sun-19 Mon-20 Tuo-21 Wad-22 Thu-23 Fri-24 Total
Carmel Drive/Old Meridian Street Construction Inspeclien-RQAW Billable Time RPR-OT 0.50 11.00 11.00 27-50
RoundaboutConsWction
Inspection
Cartel Drivo101d Meridian Street Construction Inspection-RQAW Billable Time RPR 8.00 10.0D 10.50 11.50 40.00
Roundabout Construction
Inspection
Regularlotal 8,00 0.00 10.00 10.50 11.50 0.00 0.00 40,00
Overtime total 0.00 0100 O.OD 0.00 0.50 11.00 11.00 22.50
Timosheettotal 8.00 0.00 10.00 10.50 12.00 11.00 11.00 62.50
Timesheet Date:0811712018
Project Phase Activity Employee Type Sat-11 Sun-12 Man-13 Tuo-14 Wec145 Thu-16 Fri-17 Total
Carmel Drive/QldMeridianStrael ConsWctionInspection-RQAW Billable Time RPR 11.50 11.00 9.00 8,00 0.50 40.00
Roundabout Construction
Inspection
Carmel Drive/Old Meridian Street Construction Inspection-RQAW Billable Time RPR-OT 7.50 7.60
Roundabout Construction
Inspection
Regularletal 0.00 0.00 11.50 11.00 9.00 8.00 0,50 40.00
Overtime total 0.09 0.00 0.0D 0.00 0.00 0.00 7.50 7.60
Tlmoshool total 0.00 0.00 11.50 11.00 9.00 8.00 8.00 47.50
Timesheet Date:08110/2018
Project Phase Activity Employee Type Sat-04 Sun-05 Mon-05 Tue-07 Wed-08 Thu-09 Fri-10 Total
Cannel Drive101d Meridian Street CDns"icn Inspection-ROAW BillablaTime RPR 10,00 10.00 10.00 10.00 40.00
Roundabout Construction
Inspection
Carmel Drive/Old Meridian Street Construction Inspection-RQAW Billable Time RPR-OT 1.D0 9.50 10.50
Roundabout Construction
Inspection
Regulartotal 0.00 0.00 10.00 10.00 10.00 10.00 0.00 40.00
Overtime total 0.00 0.00 0.00 0.00 0.00 1.00 9,50 10.50
Tlmoshoot total 0.00 D.DO 10.00 10.00 10.00 11.00 9.50 50.50
Timesheet Date:0810312018
Project Phase Activity Employee Type Sat-28 Sun-29 Mon-30 Tue-31 Wed-01 Thu-02 Fri-03 Total
Carmel Drive/0ldMeridian Street ConstuctionInspection-RQAW Billable Time RPR 11.00 9.00 7.50 27.50
Roundabout Construction
Inspection
Carmel Drivel0ld Meridian Street Construction Inspection-RQAW Billable Time RPR-OT 1.50 1.50
Roundabout Construction
Inspection
Regular total 0.00 D.00 0.00 0.00 11.00 9.00 7.50 27.50
Overtime total 0.00 0.00 0.00 0.00 0.01) 0.00 1.50 1.50
Timesheettotal 0.00 0.00 0.00 0.00 11.00 9.00 9.00 29.00
City of Carmel Invoice number 6186151 Invoice date 08/31/2018
Page 8 of 8
City of Carmel Invoice number 6186151
Project 216-041.2 Carmel Drive/Old Meridian Street Roundabout Construction Inspection Date 0813112018
Andrew J.Flower
Christopher N.Jobe
Timesheet Date:08/31/2018
Project Phase Activity Employoo Typo Sat-25 Sun-26 I Mon-27 Tuo-28 Wad-29 Thu-30 Fri-31 Total
Carmel Drive/Old Meridian Street Construction Inspection-ROAW 113illablerime RPR 4.00 4.00
Roundabout Construction
Inspection
Regulartotal 0.00 0.00 0.00 O.OD 4.00 0.00 0.00 4.00
Timashoottotal 0.00 0.00 0.001 0.00 4.001 0.00 0.00 4.00
Timesheet Date:08/24/2018
Project Phase Activity Employee Type Sat-18 Sun49 Mon-20 Tuo-21 Wed-22 Thu-23 Fri-24 Total
Carmel Drive/Old Meridian Street Constructionlnspe4lon-ROAW Billable Time RPR 2.00 2.00
Roundabout Construction
Inspection
Regulartotal 0.00 0,00 0.00 0.00 2.00 0.00 0.00 2,00
Timeshoottotal 0.00 0100 0.001 0.001 2.01 0.001 0.001 2,00
Timesheet Date:08117/2018
Project Phase Acllvlty Employee Type Sat-11 Sun-12 Mon-13 Tue-14 Wed-15 Thu-16 Fri-17 Total
Cannel Driva/Old Meridian Street Construction Inspection-RQAW �Blllable`rime RPR 4.00 4.00
Roundabout Construction
Inspection
Regular total D.Do 0.00 0.00 0.00 4.00 0.00 0.00 4.00
Timeshoottotal 0.001 0.00 0.00 0.001 4.001 0.001 0.001 4.00
Timesheet Date:08/1012018
Project Phase Activity I Employee Typo Sat-04 Sun-05 Mon-06 Tuo-07 Wed-09 Thu-09 Frl-10 Total
Carmel Drive101d Meridien Street Construction inspection-RQAW Billable Time RPR 4.00 4.00
Roundabout Construction
Inspection
Regular total 0.00 0.00 0.00 0.00 4.00 D.00 0.00 4.00
Timeshoottotal 0.001 0.001 0.001 0.001 4.00 0.00 0.00 4.00
Jason M.Willy
Timesheet Date:0 813 112 01 8
Project Phase Activity Employee Type Sat-2S Sun-26 Mon-27 Tuo-28 I Wed-29 Thu-30 Fri-31 Total
Cannel Drive/Old Meridian Street Constructionlnspection-RQAW Billable Time Construction 9.00 11.00 4.00 1200 4.00 40.00
Roundabout Construction Inspector
Inspection
CannelOrtve/Old Meridian Street Construction Inspection-ROAW Billable Time Construction 4.00 4.00
Roundabout Construction Inspector-OT
Inspection
Regular total 0.00 0.00 9.00 11.00 4.00 1200 q,00J44.00
Overtime total 0.00 0.00 0.00 0.00 0.00 0.00 4,00
Tlmashoottotal 0.00 0.00 9.00 11.00 4.00 12.00 8,00
Timesheet Date:0812412018
Project I Phase Activity Employoo Typo Sat-18 Sun49 Mon-20 Tuo-21 Wed-22 Thu-23 Fri-24 Total
Carmel Drive/Old Meridian Street I Construction Inspection-RQAW Billable Time Construction 2.00 2.00
Roundabout Construction Inspector
Inspection
Overtime total O.OD 0.00 D.00 0.00 0.00 0.00 2.00 200
Timoshoettotal 1 0.00 0.00 D.00 0.00 0.00 0.001 2.001 200
City of Carmel Invoice number 6186151 Invoice date 08/31/2018
Page 7 of 8
City of Carmel Invoice number 6186151
Project 216-041.2 Carmel Drive/Old Meridian Street Roundabout Construction Inspection Date 08/31/2018
Jason M.Willy
Timesheet Date:08/17/2018
Project Phase Activity EmployaeType Sat-111 Sun-12 Mon-13 Tue-14 Wed-15 Thu-16 Fri-17 Total
Carmel Drive/Old Meridian Street Constructioninspection-RQAW BillableTima Canstructicn 8.00 8.00
Roundabout Construction Inspector
Inspection
Overtime total 0.00 0.00 0.o0 0.00 0.00 0.00 8.00 8.00
Tlmesheattotal 1 0.00 0-001 0.001 0.001 0.001 0.001 8.001 8.01)
Timesheet Date:0811012018
Project Phase Activity Employee Type Sat-04 Sun-05 Mori-00 Tuo-07 Wed-08 Thu-09 Fri-10 Total
Carmel Drive/Old Meridian Street Construction Inspection-ROAW Billable Time Construction 6.00 7.00 8.00 23.(10
Roundabout Construction Inspector
Inspection
Regularlotai 0.00 0.00 8.00 7.00 8.00 0.00 0.00 23.0D
Tlmoshoottotal 0.00 0.00 8.001 7.001 8.001 0.00 0.001 23.01)
Timesheet Date:08103/2018
Project Phase Activity Employee Type Sat-28 Sun-29 Man-30 Tua-31 Wad-01 Thu-02 Fri-03 Total
Carmal Drive/Old Meridian Street Construction inspection RC1 Billable Time Construction 4.00 6.00 10.00
Roundabout Construction Inspector
Inspection
Regular total O.OD 0.00 0.00 0.00 0.00 4.00 0.110 4.00
Overtimetotal 1 0.001 0.001 0.001 0.00 0.00 0.00 6.00 6.00
Timeshoettotal 1 0.00 0.00 0.00 0.D0 0.00 4.00 8.00 10.00
City of Carmel Invoice number 6186151 Invoice date 08131/2018
Page 8 of 8
Mileage Log
nPRQAW
Employee Name Andrew Flower
Vehicle 2015 Colorado
Period Aug-18
Starting I � ,Ocicmeter Odometer,
D- • - -
8/1/2018 216-041.2 Home Field Office in Carmel Construction Inspection 68966 69034 40 26
8/2/2018 216-041.2 Home Field Office in Carmel Construction Inspection 69034 69065 5 26
8/3/2018 216-041.2 Home Field Office in Carmel Construction Inspection 69055 69162 71 26
8/6/2018 216-041.2 Home Field Office in Carmel Construction Inspection 69162 69202 14 26
8/7/2018 216-041.2 Home Field Office in Carmel Construction Inspection 69202 69228 0 26
8/8/2018 216-041.2 Home Field Office In Carmel Construction Inspection 69228 69254 0 26
8/9/2018 216-041.2 Home Field Office In Carmel Construction Inspection 692541 69281 1 26
6/10/2018 216-041.2 Home Field Office in Carmel Construction Inspection 69281 69307 0 26
8/13/2018 216-041.2 Home Field Office in Carmel Construction Inspection 69307 69333 0 26
8/14/2018 216-041.2 Home Field Office in Carmel Construction Inspection-Trip to Arcadia for equipment pickup 69333 69412 3 76
8/15/2018 216-041.2 Home Field Office in Carmel Construction Inspection 69412 69441 3 26
8/16/2018 216-041.2 Home Field Office in Carmel Construction Inspection 69441 69467 0 26
8/17/2018 216-041.2 Home Field Office in Carmel Construction Inspection 69467 69493 0 26
8/18/2018 216-041.2 Home Field Office In Carmel Construction Inspection 69493 69520 1 26
8/20/2018 216-041.2 Home Field Office.intairmel. Construction Inspection 69520 69547 1 26
8/21/2018 216-041.2 . Home Field Office in Carmel Construction Inspection-2 Trips to Lizton for drone photos 69547 69713 6 160
8/22/2018 216-041.2 Home Field Office in'Carmel Construction Inspection-1 trip to Lizton for drone photos 69713 69811 2 96
8/23/2018 216-041.2 Home Field Office In Carmel Construction Inspection 69811 69839 2 26
8/24/2018 216-041.2 Home Field Office in Carmel Construction Inspection 69839 69867 2 26
8/25/2018 216-041.2 Home Field Office In Carmel Construction Inspection 69867 69929 6 56
8/26/2018 216-041.2 Home Field Office in Carmel Construction Inspection 69929 69959 4 26
8/27/2018 216-041.2 Home Field Office in Carmel Construction Inspection-Arcadia for equipment pickup/delivery 69959 70031 6 66
8/28/2018 216-041.2 Home Field Office in Carmel. Construction Inspection 70031. 70059 2 26
8/29/2018 216-041.2 Home Field Office in Carmel Construction Inspection 70059 700871 2 26
8/30/2018 216-041.2. Home.. . Field Office In Carmel Construction.Inspection 70087 70114 1 26
139 440