HomeMy WebLinkAbouta002E3
A-3
E3
A-3
E4
A-3
E4
A-3
E2
A-3
E2
A-3
E1
A-4
E1
A-4
E5
A-4
E5
A-4
13/16"33" 18"13/16" 12" 13/16" 18" 33"13/16"
40 1/8" 37" 40 1/8"1 3/16"31 5/8"1 3/16"
117 1/4" 34"
CL
23 5/16"
CL
70 5/8" 23 5/16"
CL
17" 17"6 1/4"42"6 1/4"24"7 1/2"35" 3 1/2"35"5 1/8"41 1/2"41 1/2" 41 1/2" 41 1/2" 42"89 5/8" 42" 12"
16" 12"
28"
18"6"
24"8"
S1
A-5
S1
A-5
CABINET PLAN
4'-3 1/2"2"7'-1 1/2"7'-3 1/2"EXG SLOPED CEILING
CH = +/- 10'-0" (MATCHES
BEDROOM)
CH = 8'-0"
EXG SLOPED CEILING
SOFFIT & CEILING PLAN
CABINET NOTES
1) CABINETRY SHOULD BE PRICED AS PENNVILLE CUSTOM CABINETRY OR EQUIV.
2) DOORS AND DRAWER FRONTS SHALL BE "SHAKER TOWN" FULL OVERLAY.
3) CABINETRY IN MASTER BEDROOM SHALL BE INSET.
4) CABINETRY IN MASTER BATH SHALL BE FULL OVERLAY.
5) DOORS SHALL HAVE SOFT CLOSE HINGES.
6) DRAWERS SHALL HAVE FULL EXTENSION GLIDES, SHALL SOFT CLOSE, AND SHALL BE ADJUSTABLE IN 4 DIRECTIONS.
7) PULLOUTS SHALL BE FULL EXTENSION AND SHALL SOFT CLOSE
8) TOE KICKS SHALL BE 4" U.N.O.
9) CABINET INTERIORS SHALL BE CLEAR COATED.
10) CABINET BOX MATERIALS SHALL BE CONSTRUCTED FROM FORMALDEHYDE-FREE, AMERICAN-MADE PLYWOOD AND
SHALL NOT OFF-GAS.
11) FINISHES SHALL BE VOC FREE AND SHALL NOT OFF-GAS.
A-2
Adam Gibson and Adam Gibson
Design, LLC does not represent or
imply itself to be or employ licensed
architects or engineers. Adam
Gibson and Adam Gibson Design, LLC
assume no responsibility for structural
or dimensional errors or omissions.
Owner is responsible to verify and
check all notes, details, elevations,
sections and floor plans for any errors
or omissions prior to start of
construction. No warranties are
expressed or implied including
compliance of this plan with
applicable building codes. Owner is
responsible to assure that the building
meets or exceeds local codes and
regulations. It is the responsibility of
Owner to obtain any and all structural
analysis, engineering and
specifications that may be required in
the municipality in which it is to be
built. The selection and application of
correct structural materials is the
responsibility of Owner. It is suggested
that owner hire a general contractor
to monitor and comply with the
responsibilities listed within this
paragraph. In no event shall Adam
Gibson or Adam Gibson Design, LLC
be responsible for project budgeting
or bidding of third parties based on
Designers plans. In the event that any
liability is imposed on Adam Gibson or
Adam Gibson Design, LLC, Adam
Gibsons or Adam Gibson Design,
LLCs liability to Owner or any third
party shall not exceed the price paid
for the construction drawings.
½" = 1'
U.N.O.
SHEET:
SCALE:DESIGNED FOR:M ARY JO AND STEVE W EDDING
5033 ST CHARLES PLACE
CARM EL, IN 46033ADAM G IBSO N DESIG N, LLC200 S. RANG ELIN E RD. SUITE 223CARM EL, IN 46032317.255.5001ADAM @ADAM G IBSO N.CO MDESIGNED BY:Wedding Master 13-X10
DATE:
11/10/2017
09/21/18
Mike Sheeks