Loading...
HomeMy WebLinkAboutBuilding Permit InformationCARMrRT_ / CLAY TOWNSITYP n1GPARTMTi:NT OF COMMUNYTY 5EVRi.0PM7EN1r �u:i.1.cL:i.nc:t Pc3'rini�-infornna�ion CARMEL ZONING ORDINANCE Z-160, SECTION 29.4.2(3): THE BUILDING COMMISSIONER (DIRECTOR, DEPT. OF COMMUNITY DEVELOPMENT OR STAFF) SHALL APPROVE OR DENY THE IMPROVEMENT LOCATION PERMIT (BUILDDING PERMIT) WITHIN FIVE (5) WORKING DAYS OF THE RECEIPT OF THE WRITTEN APPLICATION FORM AND ACCOMPANYING MATERIALS. THE IMPROVEMENT LOCATION PERMIT (BUILDING PERMIT) SHALL BE ISSUED WHEN THE PROPOSED STRUCTURE, IMPROVEMENT OR USE AND ITS LOCATION CONFORM IN ALL RESPECTS TO THIS ORDINANCE. The following must be received by the Department of Community Development before any building or remodeling permit can be reviewed or issued by the staff: 1. A completed Improvement Location Permit application. 2. Two (2) complete sets of construction plans. In compliance with the State Energy Code, must list R-valuus on walls, ceilings, etc. If a commercial construction, plans must be stamped approved by the Indiana State Department of Fire .Prevention and Building Safety. 3. A copy of sewer permit (from City of Carmel Engineering Dept. or Hamilton Western Utilities, whichever applies) or septic permit (Hamilton County Health Department) - 4. Three (3) copies of a situ or plot plan showing the following REQUIRED information (can be obtained from the landowner or land developer): Lot drawn to scale All dimunsions Scale and North arrow All roads, alleys, right-of-ways, etc. All uthur utilities and drainage right -of -ways•and„easements Any applicable flood plain area Building pad uluvation and lot corner elevations All accussory bu,.u.L„K, -- existing or proposed All sidewalks and driveways Sewer and water lines, septic system and well location Drainago flow arrows - All drainage swales and subsurface facilities (retention/detention' areas, Dimensivial cross sections of all drainage swales Swop pump (swop pwnp pits) showing discharge locations Ceothurmal heat pump discharge locations Drainage Swales: All required drainage swales must be shown on the plot plan and constructud in all subdivisions prior to the Department of Community Development•purforming a final inspection of any structure per plans on file. or per the following: Constructed swales shall be a minimum of 116” deep with side slopes of not less than 4 to 1. If this information is not submitted, it will extend the time it takes to get an.approved building permit. I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY AND ACCURATELY ON THE ATTACHED PLOP Olt SITE PLAN AS SUBMITTED WITH A BUILDING PERMIT APPLICATION TO THE CARMEL/CLAY DEPARTMENT OF COMMUNITY DEVELOPMENT. SIGNATURE:_ PHONE: �7 G - Zl.� G ADDRESS: NAME OF PLUMBING CONTRACTOR: (If Applicable) ZL6 VALID STATE PLUMBTNG LICENSE NUMBER:_ k /I