HomeMy WebLinkAbouta0019'-1" 8'-1"
8'-1"
T/ MAIN LEVEL DBL TOP ⅊
T/ UPPER LEVEL SUBFLOOR
T/ MAIN LEVEL SUBFLOOR
T/ UPPER LEVEL DBL TOP ⅊
T/ GARAGE/REC RM DBL TOP ⅊
T/ OWNER'S RETREAT SUBFLOOR
T/ OWNER'S RETREAT DBL TOP ⅊
8'-0" FOUNDATION
7'-10
5
8"
T/ FND.
01
A1.1
03
A1.1
42
1
2"
5
1
2"
4" 5'-0
1
2"
42
1
2"
8
1
2"
7
1
2"
7
1
2"
8
1
2"
8'-2
5
2'-2 8"
3
4"
FROM
FRAME
8'-6"
3'-11
3
4"
1'-4"
TYP.
DRYWALL
WINDOW
3'-11
3
4"
FIBERGLASS / ASPHALT SHINGLES
1x6 TRIM GABLE BRACKET
- HOLD OUT TO BACK SIDE
OF RAKE BOARD
1x6 DOOR THRESHOLD
- DTL. 03/D1.1
1x4 TRIM ON BOTH SIDES OF DOOR
- TRIM TO FIT
3 5/8"h. x 6 5/8"d. CAST STONE SILL
- PROJECT BOTTOM 1"
CAST STONE ARCHED ENTRY
HEAD, Q-5C08
- SEE DTL. 05/A1.1
1x6 WINDOW TRIM
- DTL. 05/D1.3
SET CENTERLINE OF FIRST RAFTER
5" FROM FACE OF STONE VENEER
ROUGH SAWN CEDAR PERGOLA
- SEE DTL. 02/A1.1
2 1/4"h. x 4"d. CAST STONE SILL
- PROJECT BOTTOM 1"
72"h. J4-A FOUR BOARD
ARCHTOP BOARD-n-BATTEN SHUTTERS
1/2" x 9 1/2" HARDBOARD FRIEZE
- w/ BRICK LADDER
- w/ BARGE MOULD
- TRIM TO T/ WINDOWS
1x8 GUTTER BOARD
- w/ ALUM. GUTTER & DOWNSPOUTS
1x8 ARCHED WINDOW TRIM
- w/ METAL FLASHING
- RADIUS = 36 3/8"
CAST STONE ARCHED WDW HEAD,
Q-5W14
- SEE DTL. 06/A1.1
1x6 GABLE FRIEZE
- w/ BRICK LADDER
- w/ BARGE MOULD
1x6 RAKE BRD w/ PVC BARGE MLD
- EXTEND ROOF SHT'G. AN ADDITIONAL
1 1/2" ± TO COVER TRIM
1x8 RAKE BOARD
- EXTEND 18" FROM SHT'G.
1x8 GABLE FRIEZE
- PAD OUT 2" FOR STONE
- w/ BARGE MOULD
14
12
12
14
'FYPON' DECORATIVE LOUVER #LV12x30
BRICK TRUSS
- DTL 18/D1.0
9'-1
3
4"
FROM T/ FDN. TO ARCH
'FYPON' BRACKET
- #BKT12x18x6S
47"h. J4 FOUR BOARD
BOARD-n-BATTEN SHUTTER
30
3
4"
8'-2
1
2"
12
14
BRICK ROWLOCK ARCH
- PULL 1" FROM FACE OF VENEER
- w/ 1x4 ARCHED TRIM w/ FLSH'G.
- T/ TRIM RADIUS = 10"
BRICK SILL COURSE
- SLOPE 1"
- PROJECT BOTTOM 1"
1x8 GABLE FRIEZE
- BRICK LADDER
- w/ BARGE MOULD
GABLE FRIEZE RETURN
- SEE DTL. 09/A1.1
CAST STONE WINDOW HEAD,
Q-J110
- DTL. 10/A1.1
8
1
2"
8
1
2"
ROOF CRICKET
- DTL. 12/D1.0
CAST STONE ARCHED WDW HEAD,
Q-5W14
- SEE DTL. 06/A1.1
11
3
4
7
5
9
8
8
10
16
10
6
16
10
6
6
1
2
24"
12
8
12 1
8
2
12
6
16
21
10
6
16/17
WS-B3
10
16
Note: All square footage calculations are taken to face of
veneer.
Gross square footage: Includes square footage that
takes into account floor space in a two-story volume.
Net square footage: Gross square footage minus the
floor space in a two-story volume. Net square footage
should be used for determining appraisal value.
SQUARE FOOTAGE
GROSS AREA NET AREA
BASEMENT (UNFINISHED)
FIRST FLOOR
GARAGE
OWNER'S SUITE LEVEL
PATIO
REC ROOM
SECOND FLOOR
1699 Sq. Ft.
1632 Sq. Ft.
772 Sq. Ft.
894 Sq. Ft.
192 Sq. Ft.
465 Sq. Ft.
1568 Sq. Ft.
1699 Sq. Ft.
1619 Sq. Ft.
772 Sq. Ft.
894 Sq. Ft.
192 Sq. Ft.
453 Sq. Ft.
1127 Sq. Ft.
ALL SIDES: HORIZONTAL OR SHAKE SIDING
TO BE FIBER CEMENT BOARD
SIDING MATERIAL:
W
I
L
L
I
A
M
L
.
K
A
U
F
H
O
L
Z
A
R
C
H
I
T
E
C
T
TALLYNS RIDGE
REASON FOR PLOT: PLOT DATE:
Job No.
Sheet No.
HOMESITE NO. IN OFFICE REVIEW:
MASTER BY:
DATE:
C
DATE:
3940 OLYMPIC BLVDERLANGER, KY 41018
PH: (859) 341-4709
FIELD SPEC HOTLINE: (859) 341-4709
COPYRIGHT
ALL RIGHTS RESERVED
FISCHER HOMES, Inc.
JOB INFO:
DATE:
PERMIT:
SIGN-OFF:
CONSTRUCTION:
REVISION:
REVISION:
REVISION:
REVISION:
HOME TYPE:
PLAN:
# 9/28/2018 2:28 PM
TLR010140000
GOPI VINOD AVVARI
1 4344 TRAHAN DRIVE
PAXTON
57-500-PAXTON ENGLISH ELEGANCE WITH BRICK & STONE
CARMEL, IN
1 4
05/201 7
JMP/TJE
----
----
----
----
----
----
----
----
----
----
----
----
fieldspecchange@fischerhomes.com
KAVYA AVVARI REVISED BY:---- SAPPHIRE TRADE SUPPORT
sapphiretradepartners@fischerhomes.com
Fischer Homes Indianapolis II, LLC f/k/a
Fischer Homes Indianapolis II, L.P.
A1.0
MATERIAL LEGEND
1
3
1x8 RAKE BOARD
4
1x8 GUTTER BOARD
- w/ ALUM. GUTTER & DOWNSPOUTS
1
2" x 9
1
2" HARDBOARD FRIEZE
- TRIM TO T/ WINDOWS
5
FIBERGLASS / ASPHALT SHINGLES
6
PREFINISHED CORNER TRIM
- TYPICAL w/ VINYL SIDING
<OR>
1x4 CORNER TRIM
- TYPICAL w/ FIBER CEMENT PLANK SIDING / PANELS
7
1x6 WINDOW JAMB TRIM
8
9
1x8 WINDOW JAMB TRIM
1x10 WINDOW JAMB TRIM
12
1x12 KICK PLATE
- TRIM TO FIT
13
(2) 1x8 KICK PLATE
- BUTTED TOGETHER
10
2
1
4"h. x 4"d. CAST STONE SILL
- PROJECT BOTTOM 1"±
HORIZONTAL SIDING
- REFER TO BOX NOTE
BELOW FOR MATERIAL
- SEE DTL SHEETS WS-V OR WS-F
SHAKE SIDING
- REFER TO BOX NOTE
BELOW FOR MATERIAL
- SEE DTL SHEETS WS-V OR WS-F
FIBER CEMENT BOARD PANEL
- STUCCO FINISH
- SEE DTL SHEET WS-F
ALL MATERIALS ARE 'TYPICAL' UNLESS OTHERWISE NOTED
FIBER CEMENT BOARD PANEL
- SMOOTH FINISH
- SEE DTL SHEET WS-F
CULTURED STONE VENEER
- REFER TO SELECTIONS
- SEE DTL SHEETS WS-C
BRICK VENEER
- SEE DTL SHEETS WS-B
WAVEY-EDGE CEDAR SIDING
- SEE DTL SHEETS WS-V OR WS-F
11
BRICK SILL COURSE
- SLOPE 1"
- PROJECT BOTTOM 1"
2
1x8 GABLE FRIEZE
NOTE:
REFER TO A7.0 FOR THE ROOF PLAN,
RIDGE VENT LOCATIONS, AND
GUTTER AND DOWNSPOUT LOCATIONS.
14
2
1
4"h. x 2
3
4"d. CAST STONE SILL
- PROJECT BOTTOM
3
4"±
15
1
2" x 9
1
2" HARDBOARD FRIEZE, LAPPED
- TRIM TO T/ WINDOWS
16
1x8 BAND BOARD
17
1x6 CORNER TRIM
18
1x12 TRIM
19
1x8 TRIM
20
3
5
8 "h. x 6
5
8"d. CAST STONE SILL
- PROJECT BOTTOM 1"±
FIBER CEMENT BOARD PANEL
- VERTICAL SIDING
- SEE DTL SHEET WS-F
21
1x4 TRIM
22
1x10 TRIM
23
1x6 TRIM
24
BLOCKING @ TRUSS CANTILEVER
NOTE:
DASHED LINES BELOW T/
FOUNDATION DEPICT INSTALLED
WINDOWS OR DOORS
- LOCATED PER A2.0
SCALE = 1'-0"
FRONT ELEVATION
01 1/4"
SCALE = 1'-0"
LEFT SIDE ELEVATION
02 1/8" SCALE = 1'-0"
REAR ELEVATION
03 1/8" SCALE = 1'-0"
RIGHT SIDE ELEVATION
04 1/8"
10/08/18
William Hohlt