Loading...
HomeMy WebLinkAboutA200.59'-0" 2'-9" 1'-8 3/4" 2'-8" 1'-4" CL 3'-11" CL 7'-0" CL 2'-3" 3'-0" F 1" 2'-6" VTB30 5'-2 1/2" 3" 7'-2 1/2" 3X8 LONG BULLNOSE EDGE 3X8 SUBWAY TILE; HORIZONTAL BRICK LAY FRAME MIRROR WITH MIRROR MOLDING TO MATCH CABINETRY CENTER PLUMBING ON TUB; INSTALL NEW TUB FILLER, SHOWERHEAD, AND DIVERTER 11 1/4" 5'-0" 9'-0" 3'-6" 1'-6" 2'-0" 1'-8 3/4" 7'-2 5/8" FRAME NICHE AND RUN SUBWAY TILE THROUGH; USE BULLNOSE FOR EDGES AND RETURN; INSTALL GRANITE CAP 2'-8" TUB 1'-8 3/4" 9'-0" 7'-2 1/2" 7'-10 11/16" 3X8 LONG SIDE BULLNOSE EDGE 3X8 SUBWAY TILE; HORIZONTAL BRICK LAY CONFIRM INSTALL HEIGHT OF 24" TOWEL BAR WITH H.O. #1 of 17 Date: 7.30.18 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601( f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications. Kirkpatrick Residence Bath/Laundry Remodel Rob Kirkpatrick 2421 Glebe St. Carmel, Indiana 46032 Approved By: Date: 10 FINAL #2 8.27.18 Maggie Smith Designer msmith@caseindy.com Sydney Spurgeon Lead Designer sspurgeon@caseindy.com PROPOSED ELEVATIONS SCALE: 1/2" = 1' AA PLUMBING ELEVATION BB NICHE WALL ELEVATION 10/10/18 CC BACK OF TUB WALL ELEVATION Adam Schriner