HomeMy WebLinkAboutA200.59'-0"
2'-9"
1'-8 3/4"
2'-8"
1'-4" CL
3'-11" CL
7'-0" CL
2'-3"
3'-0"
F 1" 2'-6" VTB30
5'-2 1/2"
3"
7'-2 1/2"
3X8 LONG
BULLNOSE EDGE
3X8 SUBWAY TILE;
HORIZONTAL BRICK
LAY
FRAME MIRROR WITH
MIRROR MOLDING TO
MATCH CABINETRY
CENTER PLUMBING ON
TUB; INSTALL NEW TUB
FILLER, SHOWERHEAD,
AND DIVERTER
11 1/4" 5'-0"
9'-0"
3'-6" 1'-6"
2'-0"
1'-8 3/4" 7'-2 5/8"
FRAME NICHE AND RUN
SUBWAY TILE THROUGH;
USE BULLNOSE FOR EDGES
AND RETURN; INSTALL
GRANITE CAP
2'-8" TUB
1'-8 3/4"
9'-0"
7'-2 1/2"
7'-10 11/16"
3X8 LONG SIDE
BULLNOSE EDGE
3X8 SUBWAY TILE;
HORIZONTAL BRICK LAY
CONFIRM INSTALL
HEIGHT OF 24" TOWEL
BAR WITH H.O. #1
of
17
Date:
7.30.18
Sheet:
Revision:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601( f)
These drawings have been
prepared by Case Design &
Remodeling solely for its use and
should not be reproduced or relied
upon by any other parties.
Dimensions shown or scaled are
subject to change per actual job
condition and must be verified.
Materials are to be supplied as
specified as equal or standard
when not uniquely specified.
Installed materials may vary in
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.
Kirkpatrick
Residence
Bath/Laundry Remodel
Rob Kirkpatrick
2421 Glebe St.
Carmel, Indiana 46032
Approved By:
Date:
10
FINAL
#2 8.27.18
Maggie Smith
Designer
msmith@caseindy.com
Sydney Spurgeon
Lead Designer
sspurgeon@caseindy.com
PROPOSED ELEVATIONS
SCALE: 1/2" = 1'
AA PLUMBING ELEVATION BB NICHE WALL ELEVATION
10/10/18 CC BACK OF TUB WALL ELEVATION
Adam Schriner