CARMEL ZONING ORDINANCE Z-160, SECTION 29.4.2(3): THE BUILDING COMMISSIONER (DIRECTOR, .
DEPT. OF COMMUNITY DEVELOPMENT OR STAFF) SHALL APPROVE OR DENY THE I14PROVL4ENT LOCATION
PERMIT (BUILDINC PERMIT) WITHIN FIVE (5) WORKING DAYS OF THE RECEIPT OF THE WRITTEN
APPLICATION FORM AND ACCOMPANYING MATERIALS. THE IMPROVEMENT LOCATION PERMIT (BUILDING
PERMIT) SHALL BE ISSUED WHEN THE PROPOSED STRUCTURE, IMPROVEMENT OR USE AND ITS LOCATION
CONFORM IN ALL RESPECTS TO THIS ORDINANCE.
The following must be received by the Department of Communitv Develooment before anv
ink; or remodeling permit can be reviewed or :
1.
2.
3.
A completed Improvement Location Permit application.
Two (2) complete sets of construction plans. In compliance with the State Engr
Code, must list R -values on•walls, ceilings, etc. If a commercial construction,
plans must be stamped approved by the Indiana State Department of Fire, ;,(
Prevention and Building Safety. i
A copy of sewer permit (from City of Carmel Engineering Dept. or Hamilton)
Western Utilities, whichever applies) or septic permit (Hamilton County Health
Department).
4. Three (3) copies of a site or plot plan showing the following REQUIRED
information (can be obtained from the landowner or land developer):
✓ - Lot drawn to scale
= All dimensions
Scale and North arrow
- All roads, alleys, right-of-ways, etc.
- All other utilities and drainage right-of-ways aqd„easements
- Any applicable flood plain area i
✓ - Building pad elevation and lot corner elevations
- All accessory buildings -- existing or proposed
All sidewalks and driveways
'Sewer and water lines, septic system and well location i
Drainage flow arrows
- All drainage swales and subsurface facilities (retention/detention areas,
- Dimensional cross sections of all drainage swales i
- Sump pump* (swap pump pits) showing discharge locations
- Ceothermal heat pump discharge locations
Drainage Swales: All required drainage swales must be shown on the plot plan
and cons(ructed in all subdivisions prior to the Department of Community i•
Development -performing a final inspection of any structure per plans on file•
or per the•.following: Constructed swales shall be a minimum of 116” deep
with.side slopes of not less than 4 to 1. i
If this information is not submitted, it will extend the time it takes to get an,approved
building permit..
I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY AND ACCURATELY.
ON THE ATTACHED PLOT OR SITE PLAN AS SUBMITTED WITH A BUILDINC PERMIT APPLICATION TO THE
CARMEL/CLAY DEPARTMENT OF COMMUNITY DEVELOPMENT.
SIGNATU-� v, PHONE s
RE. • „
ADDRESS: /o � '�C,
NAME OF.PLUMBING CONTRACTOR:
VALID STATE PLUMBING LTCENSE NUMBER:
c-,.3_2_�
cable)