HomeMy WebLinkAbout 0774.01 Sewer/Water Permit/sSEWER PERMIT / RECEIPT
RECEIPT No: S0301.01
Issue Date: Jul 05, 2001
Received from:
The SUM of :
On Account of:
Sewer Notes
CITY OF CARMEL
WEBB & COMPANY BUILDERS, INC.
Permit No.: 2001.0301.SW
Permit Issue Date: JUI 05, 2001
Two Thousand One Hundred Five
Lot .
55 Subdivision . BROOKS LANDING AT PRAIRIE VIEW
Street address : 13104 BROOKS LANDING PL
............ _._..... _.. ............. ....
APPLICATION 1S HEREBY MADE FOR PERMISSION TO CONNECT THE
BUILDING AT ADDRESS LISTED ABOVE:
Water Connection
#609
$ 1,310.00
Excavator :
CULLISON EXCAVATING
.........
Water Availability
#610
PO Box:
Street Address :
1097 HELEN DR
Sewer Inspection
#651
$ 20.00
City, State, Zip :
INDIANIAPOLI11 S, IN 46240
Sewer Connection
#659
$ 775.00
Bond Expirey :
Dec 20, 2001
Sewer Availability
#660
................................................. ..............----.......
`
Total $
$2,105.00
6uthorized
_. _..._.�..__.._ �
Total Paid $
$ 2,105.00
Signature
a eipt Issued By: SNL
Payment
Type •
Check # 21438
The building sewer shall be pvc sewer pipe meeting ASTM specifications 3034 SDR 35 of latest revision; or vitrified
clay pipe, meeting ASTM specifications C-700 for extra strength clay pipe of latest revision unless other materials are
hereby permitted in writing. The sewer shall be installed in accordance with ASTM C-12 for extra strength clay pipe
and ASTM 2321 for pvc pipe and the Uniform Plumbing Code for the State of Indiana. All installations shall be in strict
compliance with pertinent City of Carmel ordinances. All building sewers shall be 6" diameter.
All installations shall be "open trench" inspected and approved by the Carmel Sewer Department before any backfilling
is done. Non-compliance may result In digging up the sewer installation an or denial of future sewer permits and/or
denial of water connections.
No footing or foundation drains or other sources of ground water or storm water shall be permitted to enter the public
sewer.
Sewer inspections should be requested at (317) 571-2648 one to four hours in advance.
No inspections or installations will be made on Saturday or Sunday or holidays unless arrangements are made at least 24 hours in
advance. All plumbers or contractors installing sewer (or water) lines shall have a plumbers bond posted with the CITY ENGINEER'S
OFFICE. If any street must be cut, a separate street cut permit shall be obtained.
I have read the conditions to which I must adhere, and agree to accept the responsibility for all work done under this permit.
Signed: