Loading...
HomeMy WebLinkAbout 0778.01 Sewer/Water Permit/sSEWER PERMIT / RECEIPT RECEIPT No: S0302.01 CITY OF CARMEL Issue Date : Jul 06, 2001 Received from: CENTEX HOMES Permit No.: 2001.0302.SW Permit Issue Date: JUI 06, 2001 The SUM of : Two Thousand One Hundred Five On Account of: Lot : 223 Subdivision : STONE HAVEN AT HAVERSTICK Street address . 5849 STONE PINE TRL APPLICATION IS HEREBY MADE FOR PERMISSION TO CONNECT THE BUILDING AT ADDRESS LISTED ABOVE: Sewer Notes Excavator : ALTERNATIVE TRENCHING PO Box: Street Address : 210 E SUMNER AVE City, State, Zip : INDIANAPOLIS, IN 46227 Bond Expirey : Jul 08, 2001 �7 A t oorize Signature 4ee�,�y: SNL Water Connection #609 $ 1,310.00 Water Availability #610 Sewer Inspection #651 $ 20.00 Sewer Connection #659 $ 775.00 Sewer Availability #660 Total $ ;� c, l uo.vu Total Paid $ $ 2,105.00 Payment Type: Check # 53984 The building sewer shall be pvc sewer pipe meeting ASTM specifications 3034 SDR 35 of latest revision; or vitrified clay pipe, meeting ASTM specifications C-700 for extra strength clay pipe of latest revision unless other materials are hereby permitted in writing. The sewer shall be installed in accordance with ASTM C-12 for extra strength clay pipe and ASTM 2321 for pvc pipe and the Uniform Plumbing Code for the State of Indiana. All installations shall be in strict compliance with pertinent City of Carmel ordinances. All building sewers shall be 6" diameter. All installations shall be "open trench" inspected and approved by the Carmel Sewer Department before any backfilling is done. Non-compliance may result In digging up the sewer installation and/or denial of future sewer permits and/or denial of water connections. No footing or foundation drains or other sources of ground water or storm water shall be permitted to enter the public sewer. Sewer inspections should be requested at (317) 571-2648 one to four hours in advance. No inspections or installations will be made on Saturday or Sunday or holidays unless arrangements are made at least 24 hours in advance. All plumbers or contractors installing sewer (or water) lines shall have a plumbers bond posted with the CITY ENGINEER'S OFFICE. If any street must be cut, a separate street cut permit shall be obtained. I have read the conditions to which I mllst adhere, and agree to accept the responsibility for all work done under this permit. aajo Signed: