HomeMy WebLinkAboutMemo Explaining Changes_10-19-18
Onyx+East
Memorandum
To: City of Carmel
From: Brandon Bart
Date: 10/11/2018
Re: PZ18100002 SP – Uptown Townhomes Replat
Onyx + East is seeking approval for a Replat of Uptown at Village of West Clay to allow future flexibility with unit size of
the buildings within the existing site plan. Currently, the PUD is platted for 52 lots. Of these 52 lots, only 9 units within 2
buildings have been constructed. These 2 buildings/9 units will remain the same and will not be considered as part of
the replat request. The replat request will change the remaining 43 lots into 9 platted blocks. The site plan and building
orientation will remain the same.
Once Onyx+East is ready to build the next future buildings within Uptown, O+E will return to the City of Carmel for a
secondary plat of the desired lots within the platted blocks. At this time, the city will also be able to review any potential
changes in the building and unit sizes.