Loading...
HomeMy WebLinkAbout507'' LAS E - OF SHREDDED HARDWOOD BARK: MULCH - CAP PLANTING PIT W/ON )ITE CLAY TOPSOIL �IOR TO MULCHING (2-3") - -- F_ AF i H SAUCER F i rk G' ADE --� I� I II - __ 6 MIN. EXISTING; SOIL OR �i.l �i COMF'A_ ED BACKFILL 6'• MAX. - PLACE SOIL BALL SLIGHTLY HIGHER THAN FIN. GRADE, MOUND SOIL OVER BALL, RHODODENDRONS & OTHER ERICACEOUS PANTS, PLACE AND MOUND PEATMOSS OVER BALL &. MULCH HEAVILY. - INSTALL FERTILIZER TABLETS OR SPIKES IM,�M�It,at�tll�-- IN. --I ll 1 - -WEED BLOCK i I I FILTER FABRIC. SOIL BACKFILL TO BE 75% TCI _- _ PS & 25oyo PEATMOSS TAMPED O PREVENT _>ETTLEMENT. SHRUB PLANTING DETAIL STABILIZATION JAN FEB. MAR. APR. MAY JUNE JULY AUG SEPT. OCT. NOV DEC. PRACTICE PERMANENT A��•////I////•�,�I�I/� SEEDING DOR"All T SEEDING TEMPORARYD SEEDING C� �-• ///�////"�_� SODDING F * * �•� •/////1/////`.� MULCHING G A . KENTUCKY BLUEGRASS 40 LBS/ACRE: CREEPING RED FESCUE 40 LBS/ACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 20 UBS/ACRE B KENTUCPLUS 2KTONSUSTTRRAWS60 MULCHB/ACRE,E; CREEPING RED FESGUE 60 LBARIE. OR ADD ANNUAL RYEGRASS 30SB5%ACRE C - SPRING OATS 3 BVSHEL/ACRE D - MEAT OR RYE 2 BUSHEL/ACRE E - ANNUAL RYEGRASS 40 LBS/ACRE F Q SOO G Q STRAW MULCH 2 TONS/ACRE .Al- IRRIGATION NEEDED DURING JUNE, JULY, AND/OR SEPTEMBER ,• IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING 500 SEASONAL SOIL PROTECTION -CHART *NO TF• RIGHT -OF- WA Y SHALL BE ,SEEDED OR SODDED, AND SHALL ONLY BE MIXTURE "A" OR IBI, DEPENDING ON TIME OF YEAR FINAL SEEDING RECOMMENDATION SEED BLEND: 6076 TURF TYPE TALL FESCUE (2-3 VARIETIES) 25% PERENNIAL RYE 10% BLUEGRASS 5R ANNUAL RYE APPLY FERTILIZER AT A RATE ADEQUATE TO PROVIDE 1 LB. OF ACTUAL NITROGEN PER 1,000 S.F. OF COMPOSITION 5-10-5. ADD LIME TO TOPSOIL TO OBTAIN A pH RANGE OF 6.0 TO 7.0. MULCH SHALL BE APPLIED TO SLOPED AREAS AT THE RATE OF 2 TONS PER ACRE. STAPLE PATTERN "D_ 3-' staples per sq.yd. using 6 -inch. 11 gouge wire "U` staples. F- nch and longer staples may be used for loose sails 9 gauge staples may be necessory in hard or roc♦ y stills Erodon nettbg shall be r*WkW to the side bottom. Use North Arlw1oan Groan Blanket Na S-150 or 9Wivdent. 6.5' EROSION NE M4G/SLaPE STAB[UZAPON EROSION NETTING (NO SCALE) DOUBL-� �TRANf A WIRE TWISHED ii`� k"l iL �? HOSE 6" FROM -T r` STAKES ISSUE DATE SUITABLE CORD -- I BANDING REQUIRED FOR HIS POR IiO N A WOkF BURLAP OR 11 CREPE TREE WkA} 3� tAYEP of SHREDDED HARDM)OD BARK MULCH MATERIAL DOMESTIC OR IMPORThi MATFRIAL, (_. i0(C)LATE PLACE SOIL BALL -0 SLIGHTLY HIGH[ -R THArl EXISTING GRADE, MOUND SOIL OVER BA I I_ -- ----- -�, TO BE MILDLY ACIDIC IN r:H,APACTER ANU SHALL IAFS FINAL GRADE - BE OBTAINED FROM SAWMILL OR LUMBERING OPERAT!ON 1 �F - - WEED BLOC MIf1. FILTER FABRIC L_ SOIL BACKFILL_ TC) BE 75a77 TOPSOIL & 25 AlPC_ (TAMPED) -- --- --- -- -- -J 1 REMOVE BINDIII G ---------- -� TREE PLANTING DETAIL NTS EROSION CONTROL NO TES L NO LAND ' Z EAR/N6, OR GRADING SHALL BEC/N (.,N TIL f ROSIOv CUN _ ROI ME ASURt 5 HA VE HE -FN /N'S 7.4,_t EL' IN ACC'ORDANCF WITH THE PHA /NG' Sf 'c ENC G SHOWN /N THESE Pt ANS. 1 AL4RfA5 SHALL BE SEEDED AS SPCC If IEl7 W 7ti,, ..30 DAYS OF FINAL GRADINr; 7/0N STOP FOR LONGER THAN 1 ti DA r 7HE S/'rl- SHALL BE Sf FDED A SPEi:7F1Fn MArvrA,k t JSIC?N CONTROI ME-ASURES Af TER E4,H RAIN AbrA' LEAST ONCE .4 4ff-A" TH'S PL AN SHAL( NOT 8E CONSIDERtO ALL !VC1119I i .4S /HE CONTRACTOR _SHAL[ TAKE ALL NECES SIR," PRECAL: 'IONS TO PREVENT SEDIMENT FROhI LEAVINE THE SI Tc 6 CONTNACTOR SHAL[ COMPLY WJrH 4 L L STATE AND L 0( AL Ohi/1N4NCE5 THAT A,0PL I: 4DDIrlONAL FRO' CV AND SEDIMENT CONTROL MEA SURE :S WL, f1F INS TAL LED IF L.f EMEO ,Vi-CFF SSAR Y B Y O.N S✓ TF INSP£C TION l5 R _ L 4ND _ , !N': 4 . 7, V. , SHA NOT D U 8 � C ES _ L[ U COMMENCE UNriL 4PPRO1,AL rC DO SO H4S r 1 BY R A � 6 N NFC i V V NlN , E� E F� B c,� � L � c t 9 IF IN57AILA71„01 =,F STORM ORAIN46E- 5,Y570 SHOUIO RE iNTRH(IPTED BY WEATHER OR NIGH 7x AI L, HE PIPE ENDS SHALL BE C0IEHF0 WITH FILTER r 4NRr,: 4LI Ex757/N( rR'. TORE S. EENC/NG; TR££5, 4ND f.TC, l .0(vSTROCTION AREA SH41t ,:I . f REM V L 4N' l P F 1T' �� c n s vs£c o s ANY BURN41v6 UN SITE SHAL BE U8JEC7 LOCAL ORD/441vCE, AND LOWES SPF,-IFICATlIbVS 7' CONTRACTOR S'NAL I. BE RE5PONSlFi, t` TO 'AKE WHAT LES' MEANS NErt51,4R1 TO ESTABLLSH PERM4,NCIV7 SOIL S,'41WZ 12A TION. £DIMEN T SHAa HE REM64fZl FROM THE `.E DlMEN 7 d.4 SIN BE FURt � 5G % F( c '.f 0IMENr 64 SIN TLET STR /, k,11 -F & L:41<: L rO INC Z 1/DE t MERGE NC Y SPIL L WA Y f ,7R "I Y'F 5 TORI EROSION CON TR OL SUMMA R Y i _,:goo _. l NL E k) / �-� ),N E GRACIE �._ _ FhAP A� T E F FL)F) -_C) IN_ _�� �/l>�'I IR r `�f ��iti��N T SP _--. _6 A. ABCti'E 1 I_/yY ER ")F SHR i� sad Y St �.1 E 1/ i� d o/` 1 1 t J il R-SION T0_1? 4' I GRGUND COVER PLANTING SOIL TO FF 1 MAIN IPL_. 5 PARTS TOPSOIL AND 4 PARTS PF_ATM05�1, CiEPTH J A FULL I APER (MILD. COMPLETED DEP1-W) OF 11HRELIC-._i FIBROUS PEATMOSS MA( BE CISFD 11"] L LEU "JI I- PLAN' ,'I �! MIX. !N('[ --UDE FERTILIZER AT APPROVED RS. GROUND COVER OR FLOWER BED DETAIL EROSION CONTROL MAINTENANCE NTS EROSION CONTROL BLANKET See Ian for width 6•'-##<' SSC,,'i[ COMPACTED GRANULAR SUBGRADE GRA VEL CONS TRUC TION EN TRA NCE PLANTING PRE-BID SE NOTES 1 INCASE OF P,SCREPANCIES BETWEEN THE PLAN - A , -T r` � ISSUE DATE PAY FOR ALL PERMITS AND FOE, THAI MAY Bi I DESCRIPTION REQUIRED FOR HIS POR IiO N A WOkF ALL SHRUB PLANTING AREAS TO BE COVERED W/ 11 PEATMOSS TO BE USED GN FR(jI'_CI `-;HALL BE 3� tAYEP of SHREDDED HARDM)OD BARK MULCH DOMESTIC OR IMPORThi MATFRIAL, (_. i0(C)LATE ALL GROUND COVER BEDS SHALL BE COVERED W/ -0 BROWN IN COLOR ANG l_:'YPO `.ED OF PARTIAL 1" SHREDDED HARDWOOD BARK MULCH MULCH DECOMPOSED VEGETAN E MATERIAL PERI MC%�'� SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHAL_ a ar TO BE MILDLY ACIDIC IN r:H,APACTER ANU SHALL IAFS BE APPROVED BY LANDSCAPE ARCHITECT BE OBTAINED FROM SAWMILL OR LUMBERING OPERAT!ON i 0) NO UTILIT'r MULCH OR PROCESSED TREE 0 L_ TRIMMINGS WILL BE ALLOWED 1" LANDSCAPE CONTRACTOR '".HA',_L N,LFY LASNDS,APE MIN:, �}} ARCHITECT IN WRITING PR!'JR lu BID DATE OF AN f AN APPROVED PRE -EMERGENT HERBICIDE SHALL N C. , L_ - I-_�_ / NOTED ON PLANS. SPECIFIED BY MANUFACTURER FOR EACH PLANT z0 �• _ I �r- � ,r �r I r -t -,1, I MAX.. - - 4 FINAL PLACEMENT OF PLANT MATERIALS, ECT _ , SHALL BE APPROVED BY LANDSCAPE ARCHITECT BEFORE BY LANDSCAPE ARCHITECT SEED MIX SHALL CUNSI�1 OF PLANTING OPERATIONS ARE TO PROCEED. ALL 34 POUNDS WABA,;H uP' BARC'N KEN TI_k K Y TREE LOCATIONS SHALL BE MARKED WITH A WOOD TREE PLANTING DETAIL NTS EROSION CONTROL NO TES L NO LAND ' Z EAR/N6, OR GRADING SHALL BEC/N (.,N TIL f ROSIOv CUN _ ROI ME ASURt 5 HA VE HE -FN /N'S 7.4,_t EL' IN ACC'ORDANCF WITH THE PHA /NG' Sf 'c ENC G SHOWN /N THESE Pt ANS. 1 AL4RfA5 SHALL BE SEEDED AS SPCC If IEl7 W 7ti,, ..30 DAYS OF FINAL GRADINr; 7/0N STOP FOR LONGER THAN 1 ti DA r 7HE S/'rl- SHALL BE Sf FDED A SPEi:7F1Fn MArvrA,k t JSIC?N CONTROI ME-ASURES Af TER E4,H RAIN AbrA' LEAST ONCE .4 4ff-A" TH'S PL AN SHAL( NOT 8E CONSIDERtO ALL !VC1119I i .4S /HE CONTRACTOR _SHAL[ TAKE ALL NECES SIR," PRECAL: 'IONS TO PREVENT SEDIMENT FROhI LEAVINE THE SI Tc 6 CONTNACTOR SHAL[ COMPLY WJrH 4 L L STATE AND L 0( AL Ohi/1N4NCE5 THAT A,0PL I: 4DDIrlONAL FRO' CV AND SEDIMENT CONTROL MEA SURE :S WL, f1F INS TAL LED IF L.f EMEO ,Vi-CFF SSAR Y B Y O.N S✓ TF INSP£C TION l5 R _ L 4ND _ , !N': 4 . 7, V. , SHA NOT D U 8 � C ES _ L[ U COMMENCE UNriL 4PPRO1,AL rC DO SO H4S r 1 BY R A � 6 N NFC i V V NlN , E� E F� B c,� � L � c t 9 IF IN57AILA71„01 =,F STORM ORAIN46E- 5,Y570 SHOUIO RE iNTRH(IPTED BY WEATHER OR NIGH 7x AI L, HE PIPE ENDS SHALL BE C0IEHF0 WITH FILTER r 4NRr,: 4LI Ex757/N( rR'. TORE S. EENC/NG; TR££5, 4ND f.TC, l .0(vSTROCTION AREA SH41t ,:I . f REM V L 4N' l P F 1T' �� c n s vs£c o s ANY BURN41v6 UN SITE SHAL BE U8JEC7 LOCAL ORD/441vCE, AND LOWES SPF,-IFICATlIbVS 7' CONTRACTOR S'NAL I. BE RE5PONSlFi, t` TO 'AKE WHAT LES' MEANS NErt51,4R1 TO ESTABLLSH PERM4,NCIV7 SOIL S,'41WZ 12A TION. £DIMEN T SHAa HE REM64fZl FROM THE `.E DlMEN 7 d.4 SIN BE FURt � 5G % F( c '.f 0IMENr 64 SIN TLET STR /, k,11 -F & L:41<: L rO INC Z 1/DE t MERGE NC Y SPIL L WA Y f ,7R "I Y'F 5 TORI EROSION CON TR OL SUMMA R Y i _,:goo _. l NL E k) / �-� ),N E GRACIE �._ _ FhAP A� T E F FL)F) -_C) IN_ _�� �/l>�'I IR r `�f ��iti��N T SP _--. _6 A. ABCti'E 1 I_/yY ER ")F SHR i� sad Y St �.1 E 1/ i� d o/` 1 1 t J il R-SION T0_1? 4' I GRGUND COVER PLANTING SOIL TO FF 1 MAIN IPL_. 5 PARTS TOPSOIL AND 4 PARTS PF_ATM05�1, CiEPTH J A FULL I APER (MILD. COMPLETED DEP1-W) OF 11HRELIC-._i FIBROUS PEATMOSS MA( BE CISFD 11"] L LEU "JI I- PLAN' ,'I �! MIX. !N('[ --UDE FERTILIZER AT APPROVED RS. GROUND COVER OR FLOWER BED DETAIL EROSION CONTROL MAINTENANCE NTS EROSION CONTROL BLANKET See Ian for width 6•'-##<' SSC,,'i[ COMPACTED GRANULAR SUBGRADE GRA VEL CONS TRUC TION EN TRA NCE PLANTING PRE-BID SE NOTES 1 INCASE OF P,SCREPANCIES BETWEEN THE PLAN 10 THE LANDSCAPE CONTRA(..,,)R SHALT_ OBTAIN AND ANl1 THE PLANT UST, THE PLAN SHALL DICTATE ISSUE DATE PAY FOR ALL PERMITS AND FOE, THAI MAY Bi I DESCRIPTION REQUIRED FOR HIS POR IiO N A WOkF ALL SHRUB PLANTING AREAS TO BE COVERED W/ 11 PEATMOSS TO BE USED GN FR(jI'_CI `-;HALL BE 3� tAYEP of SHREDDED HARDM)OD BARK MULCH DOMESTIC OR IMPORThi MATFRIAL, (_. i0(C)LATE ALL GROUND COVER BEDS SHALL BE COVERED W/ -0 BROWN IN COLOR ANG l_:'YPO `.ED OF PARTIAL 1" SHREDDED HARDWOOD BARK MULCH MULCH DECOMPOSED VEGETAN E MATERIAL PERI MC%�'� SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHAL_ a ar TO BE MILDLY ACIDIC IN r:H,APACTER ANU SHALL BE UNIFORM IN TEXTURE AND COLOR AND SHALL BE APPROVED BY LANDSCAPE ARCHITECT BE OBTAINED FROM SAWMILL OR LUMBERING OPERAT!ON c o 0) NO UTILIT'r MULCH OR PROCESSED TREE 0 L_ TRIMMINGS WILL BE ALLOWED 1" LANDSCAPE CONTRACTOR '".HA',_L N,LFY LASNDS,APE v U �}} ARCHITECT IN WRITING PR!'JR lu BID DATE OF AN f AN APPROVED PRE -EMERGENT HERBICIDE SHALL � PLANTS HE/SHE FEEL`, MAT ^4(i SURVIVE !N L), N ,l BE APPLIED IN ALL PLANTING BEDS A? A RATE NOTED ON PLANS. SPECIFIED BY MANUFACTURER FOR EACH PLANT z0 VARIETY 13- ALL DISTURBED LAWN AREAS `HALL BE SEEDED OR SODDED AS NOTED PERMANENT SFEDFD LAWN; 4 FINAL PLACEMENT OF PLANT MATERIALS, ECT AND SODDED LAWNS SHALL RE >EED MIX .AS APPG(iVIL; SHALL BE APPROVED BY LANDSCAPE ARCHITECT BEFORE BY LANDSCAPE ARCHITECT SEED MIX SHALL CUNSI�1 OF PLANTING OPERATIONS ARE TO PROCEED. ALL 34 POUNDS WABA,;H uP' BARC'N KEN TI_k K Y TREE LOCATIONS SHALL BE MARKED WITH A WOOD W BLUEGRASS, 20 PniJtJCr, PARIY r FN Tt jc F' , STAKE INDICATING VARIETY AND SIZE OF TREE BLUEGRASS, 10 F'ENN A4N F E CUE ALL GROUND COVER AND PLANTING BED LINES Cn AND 26 POUNDS I ERlIFIEL FINE HLADE_C ` c1Y PERENNIAL RYEGF.A�:S SHALL BE MARKED W/ HIGHLY VISIBLE PAINT LINES W/ OCCASIONAL WOOD STAKES FOR REFER- HE El ENCE ALL STAKES SHALL BE REMOVED FOLLOWING C-605 PLANTING OPERATIONS. LANDSCAPE ARCHITECT RESERVES 14 ALL LAWNS SHALL BET ILL EI -ti 10 HA'JE A FULi THE RIGHT TO ADJUST PLANT LOCATIONS ON THE SITE UNIFORM STAND OF ACCEPTABLE GRASS AT THE OF THE ONE YEAR GUARA'V'EC PERIOD WITH NO 5 NC SUBSTITUTIONS OF PLANT MATERIALS WILL BE BARE SPOTS COMPRISIN6 M� RE THAN 2°T uF ANY ALL')WED IF PLANTS ARE NOT AVAILABLE, THE LAWN AREA ANY AREA ,0 NC IED WILL BE 5,EF.DtIl C)F CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT SODDED UNTIL AN ACCFF ABLF STAND OF PRIOR TO BID IN WRITING ALL PLANTS SHALL BE ESTABLISHED. INSPECTED AND TAGGED WITH PROJECT I D AT NI_F'SERY OR CONTRACTORS OPERATIONS PRIOR 15 ALL LANDSCAPE PLANTINI � To BE MAINTAINED Fr TG MOVING TO JOB SITE. PLANTS MAY BE CONTRACTOR FOR 60 LA t0ii JWlNC I'll IN'>r c_T!,`N T% INSPECTED AND APPROVED OR REJECTED ON THE: � r LANDSCAPE ARCHITEC:1 AIL 5E1.?ED LAWN' Sh.A,, -F MAlN JOB SITE BY LANDSCAPE ARCHITECT TAINED FOR 60 DAYS AND `,OLi.7ED LAWN` 30 CA, FOLLOWING FINAL INSPFrl10N Eir LAND:tCAPE AEihh IEl' ALI PLANTS SHALL MFF_i UR EXCEED AMERICAN AFTER WRITTEN REQUE`,T FROM THE LANDSCAPE STANDARDS FOR NUk;ERY `;TUCK 1986 EDITION, CONTRACTOR MAINTENANCE G INCLUDE WATERING, AS SET I`)RTH BY AMERICAN ASSOCiAT10N OF WEEDING, CULTIVATING, MUL ;RING, MOWING, AN, NURSERYMEN ALL OTHER NECESSARY OPERATIONS RECJUIRED Ft)F' PROPER ESTABUSHMEN tJ LAWNS AND PLANT!NC`," PLANTS AN'J ALL OTHER MATERIALS TO BE STOREL' ON SITE WILL BE PLACED WHERE THEY WILL NOT 15 CONTRACTOR 10 SUBMIT UNIT NRL(.ES ON EVERT CONFLICT W11uflSTRUCTICNN OPERATIONS AND AS 1`PE OF WORK AS REOI,Pfj' _ANCSIAPE- AR H+'t DIRECTED BY LANDSCAPE ARCHITECT 16- ALL LAWN AREAS WITHIN LAWN LIMIT [!NE) TG 3 ALL LANDSCAPE PLANTINGS SHALL BE GUAR- RECEIVE 4"-6" APPROVE[ IUPS01l PRIOR' ANTEED FOR A PERIOD OF ONE YEAR FOLLOWING SEEDING OPERATIONS. FINAL INSPECTION BY LANDSCAPE ARCHITECT AT THE ENG OF TWS PERIOD, PLANT MATERIAL TERMED LEAD 17 BACKFILL FOR TREE PLANING SHALL OR IJNSATISFA;TORY BY LANDSCAPE ARCHITECT SHA' BE APPROVED TOPSOIL AN; AP'IPGAD PFA' M,).; REPi.Ai;ED AT NO ADDITIONAL CHARGE BY THE TOP LAYER OF BACKFIN ';HALL BE 1001 FXI71iNU LANDSCAPE CONTRACTOR TOPSOIL A 5 -IU 5 ANAL ;; �G 'W RELEASE FERTILiZER SHALL BE INO)",PURATED INTO B.A:_o 9 LAWNS SHALL BE SEEi)ED I OLLOWING SCARIF PING. FILL AT APPROVED RATE`, IINAI GRADING, FERTILIZING, AND RAKING. iAWN >HALL HE FERTILIZED W/ 12-12-12 ANALYSIS 18 ALL EXISTING TREE I_' Hf HE FLF'T AT A RATE OF 101bS /,0005 f AND LIME DIRECT TRAMSPLAI ' P E.� T A Mf I_HAPJIC AL lRr E APPOED A`; DIC'ATED B'Y SOLS TEST PRIOR TO SPADE IN A PROPF f, )1!E AS DE TEPMINED BY S[tDIN(_ LAWNS 10 BE SEEDED W/ MECHANICAL AMERICAN ASSO( 1.4 N1JRS,EGrMEN _�TANL;AI. SPPi ALE P AT A RA IF OF 51r, /10005 f APPLY FOR PLANT MATEF,: AL ALL IRANSPLAN r 5,;, "''F SEI L 1 LONE UIRFCIION AND 1/2 PERPENDICULAR TREES SHALL BE I 14f DUFr"�', THI F'POER 1_ A'_,Or, TC) ht IRS1 LIGHT', r RAKE ROLL W/ 2001bs. FOR EACH SPECIE` Ik'EE HALL BF PEI(,)( ATF - P.OIEEk.AND APP! r HYDROMUL:H (NII STRAW MliLi:H; DIRECTLY T(TC,'„T H NEW I iUN �_J, Tu , I INC- AkI A a,F'ER SEF-uWC' FOR LATER TkAN`,PL-a,r;t LCtL;'�'JvI'I', '._i)h, _TRI-! TI(iN FINAL LOCATION ATvE. !/E Ar lw •d")TE�- ,)r. I ANS 1. DURING VEGETATIVE ESTABUSHMENT, INSPECT AFTER STORM EVENT'S FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA. AND RE-LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABUSHMENT, CHECK THE TREATED AREA PERIODICALLY. PERMANENT SEEDING 1. INSPECT PERIODICALLY, ESPECIALLY AFTER STORM EVENTS, UNTIL THE STAND IS SUCCESSFULLY ESTABLISHED. 2. PLAN TO ADD FERTILIZER THE FOLLOWING GROWING SEASON ACCORDING TO SOIL TEST RECOMMENDATIONS. 3, REPAIR DAMAGED, BARE, OR SPARSE AREAS BY FIWNG ANY GUWES, RE -FERTILIZING, OVER- OR RE -SEEDING, AND MULCHING. SILT FENCE 1. INSPECT THE SILT FENCE/EROSION BERM PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. EROSION BERM/SEDIMENT TRAPS & BASINS 1. INSPECT THE EROSION BERM AND SEDIMENT TRAPS PERIODICALLY AND AFTER EACH STORM EVENT. 2. RE -GRADE AND RE-ESTABLISH AS REQUIRED. 3. REMOVE DEPOSITED SEDIMENT BUIL) UP ROUTINELY TO INSURE PROPER WORKING ORDER. 4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE BERM, TRAPS AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. 1'__-�y�Y_ Y_,Y--Y- .Y Y 1 -.,.i ( -Y ­f�' SEOUENQE Of CONSMUC77 M OIPERA 77AMS - ER057AM P ffiVTIav ; f 1. INSTALL TEMPORARY RISER ON EXISTING 24` RCP OUTFLOW PIPE AT THE SOUTHEAST CORNER OF EXISTING POND 2. CONSTRUCT TEMPORARY DIVERSION DITCH AT SOUTH END OF SITE. - 3. INSTALL SILT FENCE, EROSION BERMS AND TEMPORARY SEDIMENT TRAPS PRIOR TO ANY EARTHMOVING ACTIVITY. I. 4. CLEAR AND GRUB SITE 5. STRIP AND STOCKPILE TOPSOIL (IN DESIGNATED AREA) -f 6. ROUGH GRADE PHASE ? AND PHASE ?? AREA 7. SEED PHASE ?? AREA (� 8. BEGIN EXCAVATION OF RETENTION POND #3 LEAVING BERM BETWEEN EXISTING POND 9. REPLACE REQUIRED FILL FROM POND TO PAD AREA, BRING PHASE I TO PLAN. ;Y 1Q CONSTRUCT TEMPORARY ACCESS DRIVE AND LAYDOWN AREA. 11. COMMENCE DE -WATERING AND FILLING WEST 1/2 OF EXISTING POND. - ( 12. CONSTRUCT RELOCATED INDIANA WATERWAY AND WETLAND AREA FROM DOWNSTREAM END AND_ r INSTALL CHECK DAMS. 13. CONSTRUCT PODS fl AND #2, USING POND X42 AS A TEMPORARY SEDIMENT BASIN I AND INSTALL TEMPORARY INLET PROTECTION AROUND STRUCTURE IN POND #2. r 14. SHAPE PARKING LOT, BUILDING PAD AND CONSTRUCT DRAINAGE INFRASTRUCTURE. / 15. SEED ROUGH GRADED AREAS THAT WILL NOT BE PAVED. r 16ANSTALL INLET PROTECTION WHEN EACH STRUCTURE IS INSTALLED. i 17. REPLACE TOPSOIL UPON COMPLETION OF ROUGH GRADING. FINE GRADE TO PLAN ELEVATIONS, 18. FINAL SEEDING SHOULD BE INSTALLED AS SOON AS POSSIBLE AFTER FINAL GRADING, IT IS RECOMMENDED THAT NO MORE THAN SEVEN DAYS PASS BEFORE FINAL SEEDING HAS �} BEGUN. 19. REMOVAL OF TEMPORARY EROSION CONTROL DEVICES SHALL FOLLOW THE GUIDELINES - OUTLINED IN EROSION CONTROL MAINTENANCE" PROCEDURES HEREON, w, . t �' i No �.c�`�,�1 ATS t f � ..�.• z Y � _ !Y•Af•00 PRE-BID SE I.._ ISSUF GATE POST Bl` SET Q ISSUE DATE DATEI I DESCRIPTION 12 / 1` ii ADD G N.;'REV SEQ. w, . t �' i No �.c�`�,�1 ATS t f � ..�.• z Y � _ !Y•Af•00 I.._ Q t v N a D ' a o i F. a, r E O Q -0 -71 a ar 1 c o I W v O Q -0 1 0) J 0 L_ � UQ v U �}} >LIJ � W � LLI-'-' z0 Cfl con Q r I- L.J cn Q Y L j � W Q cr W Cv Ll Cn z 0 c1Y HE El C-605 CSI PROD. #00-113