r All required drainage swales must be shown on the plot plan and
constructed in all subdivisions prior to the Department of
Coll"nity Davelopment performing a final inspection Of any structure
CAIiIviF�'/CZAY DEPARITVLEr OF OONIM[JNNITY''DEVELOhh4IIVT per plans on,(ile or per the following:
Constructed swalesshall be a mininwm of 1'6" deep with side, slopes
BUILDING PERMIT of not less than 4 to 1.
RETQUIRED PLOT PLAN INFnRMATION
The below listed information must be included on all site or plot, plans which are to be
submitted to the Carmel/Clay Department of Conriunity Development as a part of the
Building Permit review process.
If limited, pertinent information is desired from the Department of Corrrnunity Development,
a five (5) day waiting period MAY be required in order to search files for the
desired information.
The below REQUIRED information can be secured from the landowner or land developer:
Lot drawn to.scale
All dimensions
Scale and North arrow
All roads, alleys, etc., right-of-way
All other utility and drainage right-of-way and easements
Any applicable flood plain area
Building pad elevation and lot corner elevations
All accessory buildings existing or proposed
All sidewalks and driveways
Sewer and water lines, septic system and well location
Drainage flow arrows
All drainage swales and facilities (retention/detention areas etc.)
Dimensional cross sections of all drainage swales
All subsurface drainage facilities
I certify that all of the above listed information is shown completely and accurately
on the attadhed plot or site plan as submitted with a building permit application