Loading...
HomeMy WebLinkAbout09 62 20 Luxury Vinyl Plank FlooringTHE KENT 09 62 20 - THE KENT Issue Date 05.09.18 LUXURY VINYL PLANK FLOORING THE KENT SECTION 09 62 20 – LUXURY VINYL PLANK FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Luxury vinyl plank floor covering and accessories. B. Related Sections: 1. Division 3 Concrete. 2. Division 6 Wood and Plastics. 3. Division 7 Thermal and Moisture. 1.3 ACTION SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: For each type of floor covering. Include floor covering layouts, locations of edges, columns, doorways, enclosing partitions, built-in furniture, cabinets, and cutouts. 1. Show details of special patterns. 2. Show seaming plan and coving details. C. Samples for Initial Selection: For each type of floor covering indicated. D. Samples for Verification: In manufacturer's standard size, of each different color and pattern of floor covering required. E. Product Schedule: 1. Refer to Finish Legend on Drawings. 1.4 INFORMATIONAL SUBMITTALS A. Qualification Data: For qualified Installer. 1.5 CLOSEOUT SUBMITTALS A. Maintenance Data: For each type of floor covering to include in maintenance manuals. THE KENT 09 62 20 - THE KENT Issue Date 05.09.18 LUXURY VINYL PLANK FLOORING THE KENT 1.6 MAINTENANCE MATERIAL SUBMITTALS A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Floor Covering: Furnish quantity not less than 10 linear feet for every 500 linear feet or fraction thereof, in plank form and in full plank width for each color, pattern, and type of plank floor covering installed. 1.7 QUALITY ASSURANCE A. Installer Qualifications: A qualified installer who employs workers for this Project who are competent in techniques required by manufacturer for floor covering installation indicated. 1. Engage an installer who employs workers for this Project who are trained or certified by floor covering manufacturer for installation techniques required. 2. Refer to Specification Section 01 40 00 “Quality Requirements” for additional requirements. B. Manufacturer Qualifications: 1. A minimum of 10 years experience, meeting industry standards in production of the product. 2. Refer to Specification Section 01 40 00 “Quality Requirements” for additional requirements. C. Fire-Test-Response Characteristics: As determined by testing identical products according to ASTM E 648 or NFPA 253 and ASTM E 662 or NFPA 258 by a qualified testing agency. 1. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm. 2. Smoke Generation: Maximum specific optical density of 450 or less. D. Mockups: Build mockups, if requested by Architect, to verify selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution. 1. Build mockups for floor coverings including accessories. a. Size: To be determined by Architect. E. All materials to be supplied from a single source. F. Pre-Installation Meeting: Conduct pre-installation meeting on site. 1.8 DELIVERY, STORAGE, AND HANDLING A. Deliver materials in good condition to the jobsite in manufacturer’s original, unopened, undamaged containers that bear the name and brand of the manufacturer, project identification and shipping and handling instructions. B. Store materials in a clean, dry enclosed space off the ground, protected from harmful weather conditions and at temperature and humidity conditions recommended by the manufacturer. Store flooring and accessories in the spaces where they will be installed for at least 48 hours before starting installations. C. Store materials in a horizontal fashion, flat and off the floor. THE KENT 09 62 20 - THE KENT Issue Date 05.09.18 LUXURY VINYL PLANK FLOORING THE KENT 1.9 PROJECT CONDITIONS A. Maintain ambient temperatures within range recommended by manufacturer, but not less than 70 deg F or more than 85 deg F, in spaces to receive floor coverings during the following time periods: 1. 48 hours before installation. 2. During installation. 3. 48 hours after installation. B. Until Substantial Completion, maintain ambient temperatures within range recommended by manufacturer, but not less than 55 deg F or more than 95 deg F. C. Close spaces to traffic during floor covering installation. D. Close spaces to traffic for 48 hours after floor covering installation. E. Install floor coverings after other finishing operations, including painting, have been completed. 1. Do not install flooring over concrete slabs until they are sufficiently dry to achieve a bond with adhesive, in accordance with the manufacturer’s recommended bond, moisture tests and pH test. 1.10 WARRANTY A. Provide manufacturer’s standard warranty. 1.11 MAINTENANCE A. Extra Materials: Deliver extra materials to Owner. Furnish extra materials from same production run as product installed. Package with protective covering for storage and identified with proper labels. 1. Quantity: Furnish quantity of flooring units equal to 5% of amount installed. 2. Delivery, Storage and Protection: Comply with Owner’s requirements for delivery, storage and protection of extra material. PART 2 - PRODUCTS 2.1 PERFORMANCE REQUIREMENTS A. Low-Emitting Materials: Flooring system shall comply with the testing and product requirements of the California Department of Health Services' "Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers." B. Performance Standards: Meet requirements for NALFA/ANSI LF 01 2011. 2.2 LUXURY VINYL PLANK FLOOR COVERING A. Products: Subject to compliance with the following requirements (ASTM F 1700 Class III, Type B), provide products by one of the following: 1. Armstrong THE KENT 09 62 20 - THE KENT Issue Date 05.09.18 LUXURY VINYL PLANK FLOORING THE KENT 2. Shaw. 3. Patcraft. 4. Mohawk. 5. Refer to Finish Legend on Drawings for additional information. B. Luxury Vinyl Plank Floor Covering Floating Floor System with Backing system consist of the following: 1. Urethane coated wear layer. 2. Dent resistant 100% waterproof core. 3. Cushioned sound absorbing underlayment. 4. Vapor barrier: a. 6 mil. C. Wearing Surface: Embossed. D. Plank Width: 6 inches and 7 inches as standard with manufacturer. E. Plank Length: 48 inches. F. Colors and Patterns: As selected by Architect from full range of manufacturer’s colors and patterns. G. Trim: Manufacturer’s standard. 1. Expansion molding. 2. Transition molding. 3. Metal edge strips. 2.3 INSTALLATION MATERIALS A. Trowelable Leveling and Patching Compounds: Latex-modified, portland cement based or blended hydraulic-cement-based formulation provided or approved by manufacturer for applications indicated. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work. B. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of floor coverings. C. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Prepare substrates according to manufacturer's written instructions. THE KENT 09 62 20 - THE KENT Issue Date 05.09.18 LUXURY VINYL PLANK FLOORING THE KENT B. Concrete Substrates: Prepare according to ASTM F 710. 1. Verify that substrates are dry and free of curing compounds, sealers, and hardeners. 2. Remove substrate coatings and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, using mechanical methods recommended by manufacturer. Do not use solvents. 3. Alkalinity and Adhesion Testing: Perform tests recommended by manufacturer. Proceed with installation only after substrates pass testing. 4. Moisture Testing: Perform tests recommended by manufacturer and as follows. Proceed with installation only after substrates pass testing. a. Perform anhydrous calcium chloride test, ASTM F 1869. Proceed with installation only after substrates have maximum moisture-vapor-emission rate of 3 lb of water/1000 sq. ft. in 24 hours. b. Perform relative humidity test using in situ probes, ASTM F 2170. Proceed with installation only after substrates have a maximum 75 percent relative humidity level measurement. C. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound and remove bumps and ridges to produce a uniform and smooth substrate. D. Do not install floor coverings until they are same temperature as space where they are to be installed. 1. Move floor coverings and installation materials into spaces where they will be installed at least 48 hours in advance of installation. E. Sweep and vacuum clean substrates to be covered by floor coverings immediately before installation. 3.3 FLOOR COVERING INSTALLATION A. Comply with manufacturer's written instructions for installing flooring. B. Install vapor barrier according to manufacturer’s instructions. C. Install underlayment according to manufacturer’s instructions. D. Install flooring planks according to manufacturer’s instructions. E. Lay out floor coverings as follows: 1. Maintain uniformity of floor covering direction. 2. Stagger end joints a minimum of 12 inches. F. Scribe and cut flooring to butt neatly and tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, and door frames. 1. Drill pipe holes ½ inch larger in diameter. G. Extend flooring into toe spaces, door reveals, closets, and similar openings. H. Maintain reference markers, holes, or openings that are in place or marked for future cutting by repeating on floor coverings as marked on substrates. Use chalk or other nonpermanent marking devices. THE KENT 09 62 20 - THE KENT Issue Date 05.09.18 LUXURY VINYL PLANK FLOORING THE KENT I. Install divider strips where flooring terminates at centerline of doors and adjacent to other materials or unfinished floor areas. J. Provide expansion space at walls and other vertical interruptions and terminations of flooring of not less than ¼ inch, unless otherwise indicated on drawings. K. Door Frames: 1. Undercut wood door frames and allow for ¼ inch minimum expansion clearance. 2. Do not undercut metal door frames; cut floor planks to fit around frames. 3. Provide transitions at interior metal door applications. L. Molding and Trim: 1. Install molding and trim in accordance with manufacturer’s instructions. 3.4 CLEANING AND PROTECTION A. Comply with manufacturer's written instructions for cleaning and protection of floor coverings. B. Protect floor coverings from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period. C. Cover floor coverings until Substantial Completion. END OF SECTION 09 62 20