SECTION 09 65 19 - RESILIENT TILE FLOORING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Rubber floor tile.
2. Vinyl composition floor tile.
3. Luxury Vinyl Tile
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: For each type of floor tile. Include floor tile layouts, edges, columns, doorways,
enclosing partitions, built-in furniture, cabinets, and cutouts.
1. Show details of special patterns.
C. Samples: Full-size units of each color and pattern of floor tile required.
D. Samples for Initial Selection: For each type of floor tile indicated.
E. Samples for Verification: Full-size units of each color and pattern of floor tile required.
F. Product Schedule: For floor tile: Refer to Finish Legend on Drawings.
1.4 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.
1.5 CLOSEOUT SUBMITTALS
A. Maintenance Data: For each type of floor tile to include in maintenance manuals.
1.6 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective
covering for storage and identified with labels describing contents.
THE KENT
09 65 19-
THE KENT Issue Date 05.09.18 RESILIENT TILE FLOORING
THE KENT
1. Floor Tile: Furnish one box for every 50 boxes or fraction thereof, of each type, color, and
pattern of floor tile installed.
1.7 QUALITY ASSURANCE
A. Installer Qualifications: A qualified installer who employs workers for this Project who are
competent in techniques required by manufacturer for floor tile installation and seaming method
indicated.
1. Engage an installer who employs workers for this Project who are trained or certified by
floor tile manufacturer for installation techniques required.
2. Refer also to Specification Section 01 40 00 “Quality Requirements” for additional
requirements.
B. Mockups: Build mockups, if requested in writing by Architect, to verify selections made under
Sample submittals and to demonstrate aesthetic effects and set quality standards for materials
and execution.
1. Build mockups for floor tile including resilient base and accessories.
a. Size: Minimum 100 sq. ft. for each type, color, and pattern in locations directed by
Architect.
2. Approval of mockups does not constitute approval of deviations from the Contract
Documents contained in mockups unless Architect specifically approves such deviations
in writing.
3. Subject to compliance with requirements, approved mockups may become part of the
completed Work if undisturbed at time of Substantial Completion.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Store floor tile and installation materials in dry spaces protected from the weather, with ambient
temperatures maintained within range recommended by manufacturer, but not less than 50
deg F or more than 90 deg F. Store floor tiles on flat surfaces.
1.9 FIELD CONDITIONS
A. Maintain ambient temperatures within range recommended by manufacturer, but not less than
70 deg F or more than 95 deg F, in spaces to receive floor tile during the following time periods:
1. 48 hours before installation.
2. During installation.
3. 48 hours after installation.
B. After installation and until Substantial Completion, maintain ambient temperatures within range
recommended by manufacturer, but not less than 55 deg F or more than 95 deg F.
C. Close spaces to traffic during floor tile installation.
D. Close spaces to traffic for 48 hours after floor tile installation.
E. Install floor tile after other finishing operations, including painting, have been completed.
THE KENT
09 65 19-
THE KENT Issue Date 05.09.18 RESILIENT TILE FLOORING
THE KENT
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Fire-Test-Response Characteristics: For resilient tile flooring, as determined by testing identical
products according to ASTM E 648 or NFPA 253 by a qualified testing agency.
1. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm.
2.2 RUBBER FLOOR TILE RF2
A. Products: Subject to requirements, provide products by the following:
1. Johnsonite; A Tarkett Company.
B. Tile Standard: ASTM F 1344, Class I-A, homogeneous rubber tile, solid color.
C. Hardness: Not less than 85 as required by ASTM F 1344, measured using Shore, Type A
durometer per ASTM D 2240.
D. Wearing Surface: Molded pattern.
1. Molded-Pattern Figure: Hammered.
E. Thickness: 0.125 inch.
F. Size: 24 by 24 inches.
G. Colors and Patterns: Refer to Finish Legend on Drawings.
2.3 VINYL COMPOSITION FLOOR TILE VCT 1
A. Products: Subject to requirements, provide products by the following:
1. Armstrong Industries.
B. Tile Standard: ASTM F 1066, Class 1, solid-color tile.
C. Wearing Surface: Smooth.
D. Thickness: 0.125 inch.
E. Size: 12 by 12 inches.
F. Colors and Patterns: Refer to Finish Legend on Drawings.
2.4 LUXURY VINYL FLOOR TILE
A. Products: Subject to compliance with requirements, provide the following:
1. Shaw; Array 0079V.
B. Tile Standard: ASTM F 1066, Class 1, solid-color tile.
THE KENT
09 65 19-
THE KENT Issue Date 05.09.18 RESILIENT TILE FLOORING
THE KENT
C. Wearing Surface: Smooth.
D. Thickness: 0.125 inch.
E. Size: 16 by 16 inches.
F. Colors and Patterns: Refer to Finish Legend on Drawings.
2.5 INSTALLATION MATERIALS
A. Trowelable Leveling and Patching Compounds: Latex-modified, portland cement based or
blended hydraulic-cement-based formulation provided or approved by floor tile manufacturer for
applications indicated.
B. Adhesives: Water-resistant type recommended by floor tile and adhesive manufacturers to suit
floor tile and substrate conditions indicated.
1. Adhesives shall have a VOC content of 50 g/L or less.
2. Adhesive shall comply with the testing and product requirements of the California
Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile
Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."
C. Floor Polish: Provide protective, liquid floor-polish products recommended by floor tile
manufacturer.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, with Installer present, for compliance with requirements for maximum
moisture content and other conditions affecting performance of the Work.
1. Verify that finishes of substrates comply with tolerances and other requirements specified
in other Sections and that substrates are free of cracks, ridges, depressions, scale, and
foreign deposits that might interfere with adhesion of floor tile.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Prepare substrates according to floor tile manufacturer's written instructions to ensure adhesion
of resilient products.
B. Concrete Substrates: Prepare according to ASTM F 710.
1. Verify that substrates are dry and free of curing compounds, sealers, and hardeners.
2. Remove substrate coatings and other substances that are incompatible with adhesives
and that contain soap, wax, oil, or silicone, using mechanical methods recommended by
floor tile manufacturer. Do not use solvents.
3. Alkalinity and Adhesion Testing: Perform tests recommended by floor tile manufacturer.
Proceed with installation only after substrate alkalinity falls within range on pH scale
recommended by manufacturer in writing, but not less than 5 or more than 9 pH.
THE KENT
09 65 19-
THE KENT Issue Date 05.09.18 RESILIENT TILE FLOORING
THE KENT
4. Moisture Testing: Proceed with installation only after substrates pass testing according to
floor tile manufacturer's written recommendations, but not less stringent than the
following:
a. Perform anhydrous calcium chloride test according to ASTM F 1869. Proceed with
installation only after substrates have maximum moisture-vapor-emission rate of 3
lb of water/1000 sq. ft. in 24 hours.
b. Perform relative humidity test using in situ probes according to ASTM F 2170.
Proceed with installation only after substrates have a maximum 75 percent relative
humidity level.
C. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching
compound; remove bumps and ridges to produce a uniform and smooth substrate.
D. Do not install floor tiles until they are the same temperature as the space where they are to be
installed.
1. At least 48 hours in advance of installation, move resilient floor tile and installation
materials into spaces where they will be installed.
E. Immediately before installation, sweep and vacuum clean substrates to be covered by resilient
floor tile.
3.3 FLOOR TILE INSTALLATION
A. Comply with manufacturer's written instructions for installing floor tile.
B. Lay out floor tiles from center marks established with principal walls, discounting minor offsets,
so tiles at opposite edges of room are of equal width. Adjust as necessary to avoid using cut
widths that equal less than one-half tile at perimeter.
1. Lay tiles square with room axis.
C. Match floor tiles for color and pattern by selecting tiles from cartons in the same sequence as
manufactured and packaged, if so numbered. Discard broken, cracked, chipped, or deformed
tiles.
1. Lay tiles with grain running in one direction.
D. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures
including built-in furniture, cabinets, pipes, outlets, and door frames.
E. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles
to center of door openings.
F. Maintain reference markers, holes, and openings that are in place or marked for future cutting
by repeating on floor tiles as marked on substrates. Use chalk or other nonpermanent marking
device.
G. Install floor tiles on covers for telephone and electrical ducts, building expansion-joint covers,
and similar items in finished floor areas. Maintain overall continuity of color and pattern between
pieces of tile installed on covers and adjoining tiles. Tightly adhere tile edges to substrates that
abut covers and to cover perimeters.
THE KENT
09 65 19-
THE KENT Issue Date 05.09.18 RESILIENT TILE FLOORING
THE KENT
H. Adhere floor tiles to flooring substrates using a full spread of adhesive applied to substrate to
produce a completed installation without open cracks, voids, raising and puckering at joints,
telegraphing of adhesive spreader marks, and other surface imperfections.
3.4 CLEANING AND PROTECTION
A. Comply with manufacturer's written instructions for cleaning and protecting floor tile.
B. Perform the following operations immediately after completing floor tile installation:
1. Remove adhesive and other blemishes from exposed surfaces.
2. Sweep and vacuum surfaces thoroughly.
3. Damp-mop surfaces to remove marks and soil.
C. Protect floor tile from mars, marks, indentations, and other damage from construction
operations and placement of equipment and fixtures during remainder of construction period.
D. Floor Polish: Remove soil, adhesive, and blemishes from floor tile surfaces before applying
liquid floor polish.
1. Apply number of coats recommended by tile manufacturer.
E. Cover floor tile until Substantial Completion.
END OF SECTION 09 65 19