HomeMy WebLinkAboutA010 - 231JGBCUSTOMER:PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:WedgewoodBuilding Co., LLC317.669.6300
32 First Street NECarmel, IN 46032www.wedgewoodbc.comCopyright c 2018 Wedgewood Building Co. LLC.10/15/2018
10:28:16 AM
A0WEDGEWOOD BUILDING CO.JEYAKUMAR RESIDENCELOT 231 BRIDGEMONT @ JACKSON'S GRANTCOVER WBCJEYAKUMAR RESIDENCE
LOT 231 BRIDGEMONT @ JACKSON'S GRANT
SPANISH TRANSLATIONS
COMMON ELEVATION NOTES = LAS NOTAS DE LAS ELEVACIONES
COMUNES
SADDLE ROOF TO EXTEND THE MEASUREMENT = EL TECHO A DOS
AGUAS PARA AMPLIAR
RAKE BOARD = EN EL TECHO, ES EL BORDE QUE TIENE EL
INCLINACIÓN EN LA ÚLTIMA PARED DE LA CASA
EXPOSED AREA AT BOTTOM = LA ZONA DESPROTEGIDA EN EL FINAL
METAL FLASHING CAP = UNA PIEZA DE METAL QUE CUBRE EL BORDE
MÁS ALTO DEL BASE
APPLIED TRIM PILASTERS TYPICALLY AT FRONT ELEVATION CORNERS
= LA PILASTRA QUE ESTÁ TÍPICAMENTE EN LA ESQUINA DEL FRENTE
DE LA ELEVACIÓN
PANEL SIDING = PONER PANELES
SLOPED BRICK ROWLOCK SILL = UN LADRILLO EXTENDIDO EN EL
BORDE
TOP BEVELED EDGE AT PILASTER BASES = AL BASE DE LA PILASTRA
TIENE UN TECHO BISELADO
BRICK VENEER = EL REVESTIMIENTO DEL LADRILLO
BOX BEAM = LA VIGA TUBULAR
HORIZONTAL SIDING = EL REVESTIMIENTO HORIZONTAL
CORNER BOARDS = LOS TABLONES EN LAS ESQUINAS
BRICK SILL = LA REPISA DEL LADRILLO
TRIANGULAR LOUVER = EL LISTÓN TRIANGULAR
FIXED WINDOW = LA VENTANA INAMOVIBLE
EXPOSED AREA AT BOTTOM = LA ZONA DESPROTEGIDA EN EL FINAL
FRONT ELEVATION = LA ELEVACIÓN EN EL FRENTE
PANELED SHUTTERS = LOS POSTIGOS CON PANELES
SHINGLED ROOF RETURN = EL TECHO DE VARIAS TEJAS PARA
VOLVER
PORCH SWING = EL COLUMPIO EN EL PORCHE
GARAGE DOOR SIDE TRIM = LA PUERTA AL LADO EN EL GARAJE PARA
CORTAR
GARAGE DOOR HEAD = EL FRENTE DE LA PUERTA EN EL GARAJE
TO TOP OF GUTTER = A LA PARTE MÁS ALTA DE LA CANALETA
TO TOP OF HEADER = A LA PARTE MÁS ALTA DE LA VIGA
HEADER HEIGHT = LA ALTURA DE LA VIGA
TO TOP OF LANDING = A LA PARTE MÁS ALTA DEL DESCANSILLO
BEARING HEIGHT = EL APOYO PARA LA VIGA
ALIGN MEASUREMENT FOR TRIM BOARDS = NIVELA LOS TABLONES
QUE FORTALECEN EL BASE
GARAGE CEILING HEIGHT = LA ALTURA DEL TECHO DENTRO DEL
GARAJE
FINISH MAIN LEVEL = TERMINA LA NIVEL PRINCIPAL
TO TOP OF FOUNDATION = A LA PARTE MÁS ALTA DE LOS CIMIENTOS
TO TOP OF PLATE (MAIN) = A LA PARTE MÁS ALTA DE LA HOJA
PRINCIPAL
FINISHED UPPER LEVEL = LA NIVEL MÁS ALTA TERMINADA
TO TOP OF PLATE (UPPER) = A LA PARTE MÁS ALTA DE LA HOJA MÁS
ALTA
FINISHED BASEMENT LEVEL = LA NIVEL TERMINADA DEL SÓTANO
RIGHT, LEFT, FRONT, REAR ELEVATION = LA ELEVACIÓN A LA
DERECHA, A LA IZQUIERDA, A LA FRENTE, Y DE ATRÁS
COMMON FRAMING NOTES = LAS NOTAS COMUNES DE
BORDEAR
DROP TO TOP OF WALL = BAJA A LA PARTE MÁS ALTA DE LA
PARED
SLOPE (MEASUREMENT) TO DOOR = NECESITA MEDIR LA
INCLINACIÓN A LA PUERTA
(MEASUREMENT) CONCRETE SLAB OVER (MEASUREMENT)
MINIMUM GRANDULAR FILL = NECESITA MEDIR EL BLOQUE DE
CONCRETO POR ENCIMA DE LA MATERIAL DE PIEDRA ROTA
FOUNDATION PLAN (#) CAR GARAGE OPTION = EL PLAN DE LOS
CIMIENTOS DEL GARAJE PARA LOS COCHES
DROPPED WOOD BEAM = LA VIGA BAJADA
FLUSH WOOD BEAM = LA VIGA NIVELADA
POINT LOAD FROM ABOVE = SEÑALA LA CARGA ARRIBA
SOLID BEARING = EL ÁNGULO SÓLIDO
SLOPED CEILING = EL TECHO BAJADO
SOLID BEARING UNDER POINT LOAD ABOVE = EL ÁNGULO
SÓLIDO DEBAJO DE LA CARGA ARRIBA
BULKHEAD = EL MAMPARO
STUD WALL = LA PARTE VERTICAL DE LA PARED QUE BORDEA
WALL WITH WOOD TOP = LA PARED CON LA CIMA DE MADERA
RETURN AIR = VUELVA EL AIRE
TOP OF BOX BEAM = LA PARTE MÁS ALTA DE LA VIGA TUBULAR
BOX BEAM = LA VIGA TUBULAR
DUCT CHASE = EL CONDUCTO
WOOD BEAM = LA VIGA DE MADERA
ACCENT TILE WALL = EL AZULEJO ESPECIAL PARA LA PARED
VERIFY HEIGHT FOR DUCT CHASE ABOVE WALL IN ATTIC =
VERIFICA LA ALTURA PARA EL CONDUCTO ARRIBA DE LA
PARED EN EL ÁTICO
COORDINATE WALL WITH CABINET LAYOUT = COORDINA LA
PARED CON EL GABINETE
EQUAL FRAME = LA ESTRUCTURA IGUAL
EQUAL FRAME TO OTHER WALL RETURN = LA ESTRUCTURA
IGUAL A OTRA PARED
BEAM FOR SWING = LA VIGA PARA APOYAR EL COLUMPIO
PORCH SWING = EL COLUMPIO PARA EL PORCHE
COMMON ROOF PLAN NOTES = EL PLAN DE REVISAR LAS NOTAS
PARA EL TECHO COMÚN
SADDLE ROOF TO EXTEND 3” BEYOND BRICK = A TECHO A DOS
AGUAS PARA EXTENDER HASTA UN PUNTO DEL LADRILLO
COMMON FINISH PLAN NOTES = LAS NOTAS COMUNES PARA
TERMINAR EL PLAN
RECESSED SLAB = EL BLOQUE RECOVECO
COOKTOP = LA VITROCERÁMICA
OPEN SHELVES BELOW TO LOOK LIKE FURNITURE PIECE = ABRE
LOS ESTANTES DEBAJO DEL ARMARIO PARA PARECERSE COMO
LA PIEZA DE LOS MUEBLES
VOID = EL ESPACIO
TEXTURE WALL = LA PARED DE LA TEXTURA
ZERO THRESHOLD = EL UMBRAL
COMMON DETAIL NOTES = LAS NOTAS DE LOS DETALLES
COMUNES
DRYWALL = EL PANEL DE YESO
TV MOUNTING HEIGHT = LA ALTURA PARA MONTAR LA
TELEVISIÓN
TILE JOINT TO BE CENTERED ON FIREPLACE = CENTRA LA JUNTA
DEL AZULEJO EN LA CHIMENEA
TV REFERENCE = LA REFERENCIA PARA LA TELEVISIÓN
TAPER SHOWER BASE TO DRAIN ON CENTER = DISMINUE EL
BASE DE LA DUCHA AL DESAGÜE EN EL CENTRO
SLIDING DOORS = LAS PUERTAS QUE PUEDEN DESLIZAR
GUTTER BOARD = EL TABLÓN PARA EL CANALÓN
TRIM BOARD TO COVER BOTTOM OF BOX BEAM = CORTA EL
TABLÓN PARA CUBRIR EL FINAL DE LA VIGA TUBULAR
HORIZONTAL SLIDING = DE DESLIZAR HORIZONTALMENTE
PANELLED SHUTTERS = LOS POSTIGOS CON PANELES
ALIGN FACES OF TRIM TO PLASTER = NIVELA LOS EXTERIORS
DEL ESPACIO AL REVOQUE
CORBEL = LA MÉNSULA
OVER = POR ENCIMA DE
TOP = LO MÁS ALTO/LA PARTE MÁS ALTA
ALIGN = NIVELA
WIDTH = EL ANCHO
SPACED BETWEEN = PARA CREAR EL ESPACIO ENTRE
THICK = ABUNDANTE
TO TOP OF PLATE (WALL) = A LA PARTE MÁS ALTA DE LA PARED
BEARING HEIGHT = DE SOPORTAR LA ALTURA
CEILING = EL TECHO/ EL CIELO RASO
DRAWING INDEX-TRANSITIONAL
Sheet
No. Sheet Name
Current
Revision Revision Date Current Revision Description
A0 COVER
A1 EXTERIOR ELEVATIONS
A2 EXTERIOR ELEVATIONS
A3 EXTERIOR ELEVATIONS
A4 EXTERIOR ELEVATIONS
S1 FOUNDATION PLAN (SHINGLE)
A5 BASEMENT FRAMING
A6 1ST FLOOR ROUGH FRAMING
A8 ROOF PLAN (TRANSITIONAL)
A9 BASEMENT FLOOR INTERIOR FINISH
A10 1ST FLOOR INTERIOR FINISH
ID1 INTERIOR ELEVATIONS AND DETAILS
E1 BASEMENT ELEC. PLAN
E2 1ST FLOOR ELEC. PLAN Rev.No. Date DescriptionWedgewood Wall Material...
Comments Material: Area
Brick 1325 SF
Lap Siding 3678 SF
Hardie Panel
Siding
80 SF
*THESE QUANTITIES ARE APPROXIMATE AND ARE TO BE USED
FOR VERIFICATION OF TAKE-OFF QUANTITIES ONLY.
10/18/18
Mike Sheeks