HomeMy WebLinkAboutS002 - 231JGBBEDROOM #3
CLOSET
BATH #4
14'-8" X13'-6"
GAMETHEATER
16'-4" X 17'-4" 19'-8" X 27'-4"SLAB RECESSED 4"EJECT.
SUMP
WATER
HEATER
WATER
SOFTENER
R.I.
FURN
4040GL 4040GL
2/82/4 2/6MECHANICAL/
STORAGE
DRYWALL THIS
SIDE OF WALL
TYP
32" X 60"
SHOWER
PREFAB UNIT
39" FRIDGE SPACE
DROP CEILING IN
THIS AREA FOR
MECH BULKHEAD
ROUGH IN ONLY
WET BAR
4040GL2/63/0
2/6 2/6
2/6
2/8
3/0
2/82/85020FXTIMBER RETAINING WALL
OFFICE BATH #5
BEDROOM #4
UNFINISHED 3/014'-4" X 16'-4"
7'-0" X 14'-0"
DROP CEILING
FOR MECH.
BKHD
DROP CEILING
FOR MECH. BKHD
DROP CEILING
FOR MECH. BKHD
32" X 60"
SHOWER
PREFAB UNIT
CUSTOMER:PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:WedgewoodBuilding Co., LLC317.669.6300
32 First Street NECarmel, IN 46032www.wedgewoodbc.comCopyright c 2018 Wedgewood Building Co. LLC.10/15/2018
10:28:32 AM
A9WEDGEWOOD BUILDING CO.JEYAKUMAR RESIDENCE
LOT 231 BRIDGEMONT @ JACKSON'S GRANTBASEMENT FLOOR INTERIOR FINISHWBC
1/4" = 1'-0"1 BASEMENT INTERIOR FINISH PLAN Rev.No. Date Description10/18/18
Mike Sheeks