Loading...
HomeMy WebLinkAboutS101 - 231JGB1ST FLOOR ROUGH FRAMING NOTES: 1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL 2. JAMBS TO BE 4.5"W UNLESS NOTED OTHERWISE DBL 11 7/8" JST 9 1/2" JOIST TAPER SHOWER BASE TO DRAIN ON CENTER. HANGER PER PLAN 224DH2040244DH3060 5060P 244DH3060 244DH2860 244DH2860 244DH2860 244DH28605060P 244DH2860 2-2068 2/6 (2)2/4 2/8 2/6 2/8 2/6(2)2/42/8 2/6 2/82/8 2-20685/0 X 8/0 CO2/8 X 6/8 CO9'-0" O.H.CEILING42" F.P.9'-0" O.H. CEILING FLEX PANTRY PWDR. BEDROOM #2 BATH #2 LAUNDRY MASTER BATH W.I.C. MASTER BEDROOM OWNER'S ENTRY 2 CAR GARAGE 1 CAR GARAGE LANAI FOYER COVERED PORCH DINING KITCHEN GREAT ROOM 9'-1 1/8" H. 10'-1 1/8" H.9'-6"H. CEILING2X6 WALL DOWN 16R 15T @ 10" R.C. 8'-0" H. WALL ABOVE MAIN LEVEL FF 8'-0" H. WALL ABOVE MAIN LEVEL FF 16'-4' X 12'-8" TOILET CENTERLINE TOILET CENTERLINEISPD3180ISPD3180HB 1X2 BATTENS AT BEAD BD. SEAMS. EQUALLY SPACED 1X2 BATTENS AT BEAD BD. SEAMS. EQUALLY SPACED 244DH2850244DH2850 244DH3060 244DH2860 244DH2860 8'-0" H. WALL ABOVE MAIN LEVEL FF R.O. 48" W x 39 3/4" H ON 5 1/2" TALL PLATFORM 10" WIDE BOX BEAM 20' - 11" 15' - 9" 15' - 11" 3' - 7 3/4"10' - 3 3/4" 6' - 11 1/2" 7' - 10 1/2" 7' - 10 1/2" 7' - 11 1/2" 7' - 11 1/2" 53' - 11" 4 1/2"4 1/2" 3' - 7 1/2" 2' - 4 1/2"6' - 0"3' - 7 1/2" 2' - 4 1/2" 6' - 11 1/2"2' - 0" 23' - 0" 50' - 3"10' - 3 1/2" 12' - 8 1/2" 29' - 0" 5' - 4" 6' - 10" 3' - 4" 3' - 4" 2' - 5"75' - 3"1' - 4"12' - 11 1/2" 10"10"14' - 11 1/2"10" 6' - 8 1/2"3 1/2"2' - 0"9' - 4" 2' - 0" 3 1/2" 16' - 0 1/2" 15' - 4" 3 1/2"12' - 3"3 1/2"5' - 0" 10 1/2"3 1/2"3' - 2" 3' - 6" 11' - 1" 3 1/2" 3 1/2"3' - 7" 3 1/2"2' - 0"5 1/2"6' - 9" 2' - 1"3 1/2"3' - 9" 3 1/2"2' - 0" 15' - 0" 2' - 0"6' - 8 1/2"3 1/2"3' - 1" 3 1/2" 5' - 1 1/2" 3 1/2" 3' - 10" 3' - 0"16' - 7"9 1/2"6' - 3 1/4" 5' - 8 3/4" 17' - 0"4' - 0" 21' - 0"3' - 4" 5' - 8" 0" 3' - 6 1/2" 3 1/2"3' - 7" 7' - 3" 8' - 1"3 1/2"5' - 4" 14' - 0"3 1/2"8 1/2"3' - 8 1/2" 4' - 4 1/2" 7' - 3 1/2" 6' - 0" 3 1/2"3' - 4 1/2" 5' - 1 1/2" 3 1/2" 3' - 11" 2' - 11" 9' - 11 1/2"1" 9 1/2" 5' - 9"6" 9 1/2" 4' - 0" 9 1/2" 17' - 5 1/4" 5' - 5 1/4"2' - 1" 3 1/2" 4' - 4" 13' - 4" 3 1/2" 4' - 4 1/2" 3 1/2" 5' - 7 1/2" 3 1/2"2' - 7" 22' - 10 1/2"13' - 5 3/4"9' - 1"3 1/2" 10' - 3 1/2" 3 1/2" 12' - 8" 3 1/2" 6' - 9" 3 1/2" 12' - 0" 1' - 0"11' - 10" 1' - 0"4' - 9" 1' - 0" 29' - 4 1/2" 12' - 4"7' - 1 1/2" 6' - 1 1/2" 1' - 6 1/2" 13' - 0"3 1/2"6' - 5" 8' - 4 1/2" 13' - 4"19' - 0"3' - 2" 1' - 3"5' - 5 1/2" 8' - 10"8' - 6" 2' - 11"6' - 6" 6' - 1" 9'-0" O.H. CEILING 36" H WALL OPEN RAIL 18" H. WALL RECESSED NICHE SILL AT 3'-6". HEADER AT 7'-0" ABOVE F.F.E. ZERO THRESHOLD SHOWER PROVIDE BLOCKING FOR GRAB BARS 10'-1 1/8" CEILING11'-1 1/8" CEILING3' - 8 1/2"3' - 0" 2' - 0"4' - 8 1/2" 2020FX2020FX 2020FX 1640FX EQEQ 1' - 6" 15' - 11"5' - 8"32' - 4" 6' - 3 1/2" 6' - 8 1/2" 6' - 9"4' - 8 1/2" 3' - 2" 4' - 8 1/2" 6" 2' - 0" 6' - 9"5' - 3 1/2" 3 1/2"5' - 0" 25' - 5 1/2"4' - 0 1/2" 3 1/2" 2' - 1" 3 1/2" 5' - 7" 4' - 2" 1' - 11 1/2" DUCT CHASE TOILET CENTERLINE 1' - 6"4' - 8" 4' - 3 1/2"7' - 4" 4' - 3 1/2" 53' - 11"11' - 11 1/2" 11' - 11 1/2" 8' - 2" 22' - 9" 20' - 5"5812FX2/02' - 7 1/2"2' - 0"7"51' - 4"23' - 11" 1' - 4" 9'-0" H. WALL ABOVE MAIN LEVEL FF 36" H. WALL HIGH LIFT TRACKS THIS DOOR 9/0-7/0 O.H.D.16/0-7/0 O.H.D.14' - 0"10"1' - 0" 7' - 4"6' - 8" 10" (2)2/8X8/0 9'-0" O.H. CEILING 12" WIDE BOX BEAM 10" SQUARE COLUMN 3 7/8" 3 7/8"6' - 9" 75' - 3"1' - 5" 5"7' - 4 1/2" 1640FX 5"5"244DH2850CUSTOMER:PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:WedgewoodBuilding Co., LLC317.669.6300 32 First Street NECarmel, IN 46032www.wedgewoodbc.comCopyright c 2018 Wedgewood Building Co. LLC.10/15/2018 10:28:31 AM A6WEDGEWOOD BUILDING CO.JEYAKUMAR RESIDENCELOT 231 BRIDGEMONT @ JACKSON'S GRANT1ST FLOOR ROUGH FRAMING WBC1" = 1'-0"6 DROPPED SHOWER FLOOR Rev.No. Date Description1/4" = 1'-0"1 1ST FLOOR ROUGH FRAME PLAN (TRANSITIONAL) 10/18/18 Mike Sheeks