Loading...
HomeMy WebLinkAboutS300.010-01-02 TOP 10-01-02 TOP 12-01-02 TOP 10-01-02 TOP 10-01-02 TOP Framer to pad down ceiling as needed Stick frame per print Stick frame per print Stick frame per print Stick frame per printHTU26HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HGUS26-2 MUS26 MUS26 MUS26 Stick frame per print Stick frame per printHTU26 HTU26HTU26HTU26HTU26HTU26HTU26HTU26 HTU26HTU26HTU26 HTU26HTU26 2X4ledger 2X4ledger TG01TG02T02T03T04T05GE01 T07 TG03 TG04 T10 MG01 J01 TG06 CG01J02 J03 TG07 T14 T14 TG07 J04 J05 CG02CG02 J06 J07 J07 J09CG03 CG03J11J12J13 J14 T15 T15 T16 T16 J15 J16T17 J17 J15 T18T19T20 J18J19J20J21 V01 V02 V03 V04 V05 V06 V07 V08 V09 V10 V11 V12V13 V14 V15 V16 V17 V18 V19 V20 V21 V22 V23 V24 V25 V26 V27 PB02 PB03PB04PB05PB07PB05PB08 PB07PB09PB10T01(3) T06(4)T08(5)T09(5) T11(2)TG05(2) T12(2) T12(4)T13(11)M01(4)M02(3)J08(2) J08(2) J10(10) PB01(13) PB06(11)17-00-00 2-00-002-00-00 11-08-00 13-04-00 24-00-00 8-00-00 7-04-0020-00-00 18-04-00 24-08-00 20-07-00 21-08-006-08-00 1-04-00 1-04-001-04-001-04-00 1-04-00 1-04-00 1-04-00 1-04-00 1-04-00 1-04-00 1-04-001-04-001-04-001-04-001-04-001-04-001-04-00 1-04-001-04-001-04-001-04-001-04-001-04-009-002-00-00 1-02-081-04-001-04-001-04-001-04-001-04-001-04-001-04-001-04-001-04-001-04-001-04-001-04-001-03-081-04-001-04-001-04-001-04-00 1-04-00 1-04-00 1-04-00 1-04-00 1-04-006-01-04 1-04-00 1-04-00 1-04-00 1-04-005-05-04 5-05-041-04-00 1-04-00 1-04-00 1-04-00 1-04-00 1-04-00 10-10 10-10 10-10 IRC2003TPI2002 30TLL- 10TDL- 10BDLHomesbyMcKenzie WilsonResidence 57CrookedStick 1/4"=1'October18,2018 PH B18802369CUSTOMER:LOCATION:MODEL:JOB#: DATE:DESIGNER: DESIGNINFORMATION: SCALE:9028OldSR67South Mooresville,IN46158 (317)834-5380Truss Placement Guide 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 16" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. 7) Non-bearing walls may not be shown on layout. Left end of truss, as shown on engineering drawing, is indicated by the triangle symbol 10/30/18 Mike Sheeks