HomeMy WebLinkAboutS300.010-01-02 TOP
10-01-02 TOP
12-01-02 TOP
10-01-02 TOP
10-01-02 TOP
Framer to pad down ceiling as needed
Stick frame per print
Stick frame per print
Stick frame per print
Stick frame per printHTU26HTU26
HTU26 HTU26 HTU26 HTU26 HTU26 HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HGUS26-2
MUS26
MUS26
MUS26
Stick frame per print
Stick frame per printHTU26 HTU26HTU26HTU26HTU26HTU26HTU26HTU26 HTU26HTU26HTU26 HTU26HTU26 2X4ledger
2X4ledger
TG01TG02T02T03T04T05GE01
T07
TG03
TG04
T10 MG01
J01
TG06
CG01J02
J03
TG07
T14
T14
TG07
J04
J05
CG02CG02
J06 J07 J07 J09CG03
CG03J11J12J13 J14
T15
T15
T16
T16
J15 J16T17
J17
J15 T18T19T20 J18J19J20J21
V01
V02
V03
V04
V05
V06
V07
V08
V09
V10
V11
V12V13
V14
V15
V16
V17
V18
V19
V20
V21
V22
V23
V24
V25
V26
V27 PB02 PB03PB04PB05PB07PB05PB08 PB07PB09PB10T01(3)
T06(4)T08(5)T09(5)
T11(2)TG05(2) T12(2)
T12(4)T13(11)M01(4)M02(3)J08(2)
J08(2)
J10(10)
PB01(13)
PB06(11)17-00-00 2-00-002-00-00 11-08-00 13-04-00 24-00-00 8-00-00 7-04-0020-00-00 18-04-00 24-08-00 20-07-00
21-08-006-08-00
1-04-00 1-04-001-04-001-04-00 1-04-00 1-04-00 1-04-00 1-04-00 1-04-00 1-04-00 1-04-001-04-001-04-001-04-001-04-001-04-001-04-00 1-04-001-04-001-04-001-04-001-04-001-04-009-002-00-00 1-02-081-04-001-04-001-04-001-04-001-04-001-04-001-04-001-04-001-04-001-04-001-04-001-04-001-03-081-04-001-04-001-04-001-04-00
1-04-00
1-04-00
1-04-00
1-04-00
1-04-006-01-04 1-04-00
1-04-00
1-04-00
1-04-005-05-04 5-05-041-04-00
1-04-00
1-04-00
1-04-00
1-04-00
1-04-00
10-10
10-10
10-10 IRC2003TPI2002 30TLL- 10TDL- 10BDLHomesbyMcKenzie
WilsonResidence 57CrookedStick 1/4"=1'October18,2018
PH B18802369CUSTOMER:LOCATION:MODEL:JOB#:
DATE:DESIGNER: DESIGNINFORMATION: SCALE:9028OldSR67South
Mooresville,IN46158
(317)834-5380Truss Placement Guide
1) This layout is intended for the purpose of truss location
and placement only. Refer to the building plans for actual
building construction.
2) All dimensions shown 00-00-00 are in feet-inches-sixteenths.
3) Trusses are spaced 16" on center unless otherwise noted.
4) Do not cut or modify trusses.
5) Refer to the individual truss design drawings for the location
of member bracing, uplift and truss end reactions.
6) Installation of all temporary and permanent bracing is
essential. See truss drawings, BCSI-B2 Summary Sheet
and building designer requirements.
7) Non-bearing walls may not be shown on layout.
Left end of truss, as shown on engineering
drawing, is indicated by the triangle symbol
10/30/18
Mike Sheeks