HomeMy WebLinkAboutInspection InformationT N S P E C T= ON T N F ORM AZ'= ON = A MINIMUM OF 24-HOUR NOTICE IS REQUIRED IN SCHEDULING ANY INSPECTION. DURING HEAVY WORK PERIODS, AN INSPECTION MAY TAKE UP TO 5 DAYS TO BE PERFORMED. If a specific time of day is needed for an inspection, you must schedule this directly with the building inspector by calling 844-6433 before 8:30 a.m. THE FOLLOWING INSPECTIONS ARE REQUIRED WITH YOUR BUILDING PERMIT: 1. FOOTINGS: Inspection is to be made before you pour. Note the 24-hour notice minimum and plan your concrete scheduling accordingly. TEMPORARY SAW POLE FOR ELECTRICAL: Indianapolis Power & Light Company requires G.F.I., Public Service requires breakers. 3. BASEMENT PLUMBING: Underground plumbing must be inspected before the basement floor is poured. 4. ROUGH -IN: Framing, Electrical, Plumbing and Furnace or Heating must be installed Please Note: A Do Not Occupy sticker will be posted at the time of the rough -in inspection. This must not be removed until a Certificate of Occupanev has been issued from the Department of Communitv Development. Carmel, IN. This notice does not indicate a problem with the construction, only that a C/O has not yet been issued, therefore, it cannot be occupied. Also, meter base inspections are not automatically included in the rough -in inspection. Please indicate when scheduling the rough -in inspection if the permanent meter base inspection is also needed at the same time. 5. INSPECTION FOR UNDERGROUND AND METER ON HOUSE: (See note above on rough -in). 6. FINAL: All work to be completed including final grading. Final electrical will also be made at this time. Sump pump discharge facilities will also be inspected. After a final inspection is performed, an additional 24 hours is required before a Certificate of Occupancv will be issued. THIS, PLUS THE POSSIBILITY OF AN INSPECTION TAKING UP TO 5 DAYS TO BE PERFORMED SHOULD BE KEPT IN MIND WHEN SCHEDULING ANY MORTGAGE CLOSINGS. A FEE WILL BE CHARGED FOR ANY INSPECTION THAT REQUIRES MORE THAN ONE TRIP FROM THE BUILDING INSPECTOR. THIS CHARGE WILL BE $25.00 FOR RESIDENTIAL AND $50.00 FOR COMMERCIAL CONSTRUCTION AND MUST BE PAID BEFORE ANY FURTHER INSPECTIONS WILL BE SCHEDULED AND PERFORMED. N OT IE C E The Carmel Zoning Ordinance provides for a penalty if any construction is continued without having any one of the above inspections scheduled, performed and approved. This penalty will be $100.00 and a notarized affidavit will also be required. This penalty also applies to any construction that is found to be occupied before a Certificate of Occupancy is issued. �t�tsti��ttc�t��t�ttft�kfcit��Ytc�t3crttt�tR�t4c�t�t�k�Citstfc�tft*�tt�t*r'ctcic�t�t�t�4xtstfi�k*�t�t�tstst4cit�t�tfcitst�F��t*�t�t�t�tit�/4itft�t*strut CARMEL ZONING ORDINANCE, SECTION 29.4.3(1): No land shall be occupied or used and no building hereafter erected, reconstructed or structurally altered shall be occupied or used, in whole or in part, for any purpose whatsoever, until a Certificate of Occupancy shall have been issued by the Building Commissioner (Dept. of Community Development Director) stating that the building and use comply with all of the provisions of this Ordinance applicable to the building, premises or the use in the district in which it is to be located. ��txst�'t%s4*fc�C�ctit�C�tit�t�t�t�t�tfe�t*tc�Y��tfs��C�t>t�ic�k�tit*���tfcit�t�ttc�t��tut�ft�Y�ft�Ctsit*ttikit��it��Aoticfr�*�tieftfiir�tftiriYst