Loading...
HomeMy WebLinkAbout37UFrame Member Schedule iz N U N U a ... EGCll . . I Part Width Thick. Webthk Depthl Depth2 Approx. Lgth CX007 5" .2500 .1875 1'-0" 3'-6" 29'-0 9/16" RBX011 5" .2500 .1875 3'-6" 3'-6" 28'-3 9/16" 5" .2500 .1875 3'-6" 1'-5" O 19 RBX012 5" .2500 .1644 1'-5" 2'-10" 20'-1 7/8" 5" .2500 .1644 2'-10" 1'-5" TATE RBX013 5" .2500 .1875 1'-5" 3'-6" 32'-4" �.��,S•h'DIAN.•��``' 5" .2500 .1875 3'-6" 3'-6" SlONA\. CX008 5" .2500 .1875 1'-0" 3'-6" 23'-10 9/16" ICX003 8 1/2" .2500 .1644 1'-0" 1'-0" 25'-4 1/4" OA325 Bolt Connection & Plate Schedule Id Qty Bolt Bolt Plate Rows Rows Tension Washes Dia. Length Thick. Out In Bolt A 16 3/4" 2" 3/8" 4 4 B 8 3/4" 2" 3/8" 2 2 C 14 3/4" 2" 3/8" 4 3 D 4 1/2" 1 1/2" 3/8" 1 1 —'-851-0 1/4" 0.250:1 15 @ 5'-0" Frame Clearances Horiz. Clearance between members 1(CX007) and 8(CX008): 76'-7" Vert. Clearance at member 1(CX007): 24'-9 11/16" Vert. Clearance at member 8(CX008): 23'-2 9/16" Vert. Clearance at member 9(ICX003): 24'-8 1/4" Finished Floor Elevation = 100'-0" (Unless Noted Otherwise) 0 0 0 a iz N U N U a ... EGCll . . I A I (2)FB4090 � RE e O I I Ln \STER +•• G 7 3 7/16" \ ri I I m 6 r N O 19 FB3044 5 O * -fl OF I r OA325 Bolt Connection & Plate Schedule Id Qty Bolt Bolt Plate Rows Rows Tension Washes Dia. Length Thick. Out In Bolt A 16 3/4" 2" 3/8" 4 4 B 8 3/4" 2" 3/8" 2 2 C 14 3/4" 2" 3/8" 4 3 D 4 1/2" 1 1/2" 3/8" 1 1 —'-851-0 1/4" 0.250:1 15 @ 5'-0" Frame Clearances Horiz. Clearance between members 1(CX007) and 8(CX008): 76'-7" Vert. Clearance at member 1(CX007): 24'-9 11/16" Vert. Clearance at member 8(CX008): 23'-2 9/16" Vert. Clearance at member 9(ICX003): 24'-8 1/4" Finished Floor Elevation = 100'-0" (Unless Noted Otherwise) 0 0 0 0 N Ln 0 a U h _7 i, Ln (2)FB4104 C O I In a) N C' I r N FB3050 u� r (N O U c' 01 P7 O m a ... 10 M W !t iI 0 0 0 0 N Ln 0 a U h _7 i, Ln (2)FB4104 C O I In a) N C' I r N FB3050 u� r VVA \STER +•• G 7 3 7/16" 6. 6 2 @ 4'-4 5/16" 19 5 1'-0 3/16"I * -fl OF TATE �.��,S•h'DIAN.•��``' 3 l'-7 9/16" SlONA\. 2 4'-3 3/4" 1 8 1/2" ❑ Dimension' Key VP Ref: Shape Name = Capitol Wall 4, Frame 4 1. USE 1/2 DIA. A325 BOLTS FOR PURLIN TO FRAME, GIRT TO FRAME, THE VP ENGINEER'S SEAL APPLIES Building Code: 97UBC THIS DRAWING, INCLUDING THE INFORMATION NEREON, REMAINS THE PROPERTY OF VP BUILDINGS. VP Buildings, Inc. AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. ONLY TO THE WORK PRODUCT OF Live Load: (Not Reducible) 20.00 sf p IT IS PROVIDED SOLELY FOR ERECTING THE BU WING FRAME CROSS SECTION AT FRAME LINE S 5 SEE JOB DETAILS FOR BOLT LENGTHS. VP AND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. Coll. Load:Gravity 5.00, Uplift 0.00 psf DESCRIBED INTHEIFIED, EPRODRCHASEOR,DFO SHALLNOTBEMODIFIED, CED OR FO 3200PIayersClubCircie Memphis TN 38125 2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME THE VP ENGINEER'S SEAL DOES Wind Speed: 71.00 mph TED WITHOUT PRIOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTENNBUILDER JOBs SIDE OF THE WEB AS THE HILLSIDE WASHER. NOT APPLY TO THE PERFORMANCE Wind Exposure: B APPROVAL OF VP BUILDINGS. REV DATE BY DESCRIPTION Systems Builders, Inc. OH0111248-01 OR DESIGN OF ANY OTHER PRODUCT Ground Snow: 20.00 , Roof Snow: 20.00 psf CUSTOMER Capitol Construction THE GENERAL LELY DATE OR COMPONENT FURNISHED BY VP Snow Exposure Category: 3 p 4 Y: FCONTRACTOR ATE, GOODQUALIOYISS RESPONSIBLE FOR ACCURATE, GOOD QUALITY WORKMANSHI LOCATION 10/2/2001 EXCEPT TO ANY DESIGN OR PER- Seismic: Zone 1 IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS Indianapolis, Indiana DRAWNICHECK FORMANCE REQUIREMENTS SPECIFIED BY VP. Building Use:Standard occupancies DRAWING, DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP ERECTION GUIDES, PROJECT P BUILDINGS AND INDUSTRY STANDARDS PERTAINING TO PROPER OH01112 48-OlOElDWGS VARCO-PRUDEN GJS GJS VPC VERSION: 2 6 PS -6 ERECTION, INCLUDING THE CORRECT USE OF 1EMP RARY BUILDERS PO# BRACING. NTS 10/17/2001 12:49:12 FILENAME.OH0111248-OlOE1DWGS.vpc