HomeMy WebLinkAbout44Covering Schedule
Id Qty Start Panel Qty Stagger/Last Panel
#409 31 S40013242GTD 31 S35013242GTD
#410 31 845022242GTD 31 S50022242GTD
Insulation Schedule (Install in same direction as Covering)
Id Qty Start Run Last Run
BLK1 1 IB08800600602S
BLK2 20 IB088007206OPS IB088007206OPS
FASCIA RETAINER
(RFR10) FIELD BEND 1" UP
ON SSR PANEL
START PANEL DIMENSION
101/2-
CUT
0i 2'CUT PANEL DIMENSION SSR CUP
TOP OF ie
PURI
ROOF PANEL
TAPER TO 0' ---------- ---
AT RIDGE AND ROOF HEIGHT CHANGE PANEL
SAVE SUPPORT (RHS-)
PARAPET WALL
SSR AT MASONRY RF. HT. CHANGE IRCX001
BLANKET INSULATION ON PURLINS
"mora 4/m/M
0
N
(Field Repair Fastener)
(1 bags) #55308 #17-14x1" S.S. Roof Fastener
Attention: Refer to detail RCX001 on this page.
1 1'-6" Starter Panel (Cut Dim. = 10 1/2")
Dimension Key
1. PRE -DRILLING 1/8 DIAMETER HOLES FOR ROOF STRUCTURAL FASTENERS
MAY BE REQUIRED AT 11 GAGE PURLINS, NESTED PURLINS, PURLIN LAP
LOCATIONS, AND/OR SECONDARY STRUCTURAL BEAMS
2. ROOF SHEETS ARE AN INTEGRAL, PART OF THE STRUCTURAL SYSTEM,
REMOVAL OR.ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED.
3. SEE JOB DETAILS FOR SHEETING AND TRIM FASTENER SPECIFICATION.
4. FOR PR PANEL, PRE -DRILLING OF SIDELAP FASTENERS REQUIRED DUE TO
THE ABSENCE OF A PURLIN BEARING EDGE. SEE SED RC03B1.
HIGHSIDE
-123'-0"-
ROOF COVERING PLAN
VP Buildings, Inc.
3200 Players Club Circle Memphis TN 38125
REV DATE BY DESCRIPTION
it
NTS
10/16/2001 17:59:17
0
ROOF COVERING PLAN
BUILDER
Systems Builders, Inc.
CUSTOMER
Capitol Construction
LOCATION
Indianapolis, Indiana
PROJECT
OH0111248-01EP2 Drawings
FILENAME
OH0111248-01EP2 Drawings.vpc
k(s. �4 �16-- -
9 �.�STATE OF
��`�. '•: v� I ANP •' 1024,
ss�pNA�•���\
OH0111248-01
DATE
10/17/2001
P BUILDINGS D—NfiCHECK
VARCO-PRUDEN TGW/ TGW
PAGE
VPC VERSION: 2 . 6 C'
VP Ref: Shape Name = Capitol
THE VP ENGINEER'S SEAL APPLIES
Building Code: 97UBC
THIS DRAWING, INCLUDING THE INFORMATION HER
ON,
ONLY TO THE WORK PRODUCT OF
Live Load: (Not Reducible) 20.00 psf
REMAINS THE PROPERTY OF VP BUILDINGS.
VP AND DESIGN AND PERFORMANCE
IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING
REQUIREMENTS SPECIFIED By VP.
Coll. Load:Gravity 5.00, Uplift 0.00 psf
DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND
THE VP ENGINEER'S SEAL DOES
Wind Speed: 71.00 m
nPeePh
SHALL NOT BE MODIFIED, REPRODUCED OR USED FOR
ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN
NOT APPLY TO THE PERFORMANCE
Wind Exposure: B
APPROVAL OF VP BUILDINGS,
OR DESIGN OF ANY OTHER PRODUCT
Ground Snow: 20.00 , Roof Snow: 20.00 psf
OR COMPONENT FURNISHED BY VP
Snow Exposure Category: 3
THE GENERAL CONTRACTOR AND/ORERECTORIS
OLE
EXCEPT TO ANY DESIGN OR PER-
Seismic: Zone 1
RESPONSIBLE FORCONTRACTOR
GOOD QUALITY WO
IN ERECTING THIS BUILDING IN CONFORMANCE WIT
KMI
I TI-
FORMANCE REQUIREMENTS
SPECIFIED BY VP,
Building Use: Standard occupancies
g P
DRAWING, DETAILS REFERENCED IN THIS DRAWING,
ALL APPLICABLE VP ERECTION GUIDES,
AND INDUSTRY STANDARDS PERTAINING TO PROPE�2
ERECTION, INCLUDING THE CORRECT USE OF TEMPpRA
BRACING.
VP Buildings, Inc.
3200 Players Club Circle Memphis TN 38125
REV DATE BY DESCRIPTION
it
NTS
10/16/2001 17:59:17
0
ROOF COVERING PLAN
BUILDER
Systems Builders, Inc.
CUSTOMER
Capitol Construction
LOCATION
Indianapolis, Indiana
PROJECT
OH0111248-01EP2 Drawings
FILENAME
OH0111248-01EP2 Drawings.vpc
k(s. �4 �16-- -
9 �.�STATE OF
��`�. '•: v� I ANP •' 1024,
ss�pNA�•���\
OH0111248-01
DATE
10/17/2001
P BUILDINGS D—NfiCHECK
VARCO-PRUDEN TGW/ TGW
PAGE
VPC VERSION: 2 . 6 C'