Loading...
HomeMy WebLinkAbout44Covering Schedule Id Qty Start Panel Qty Stagger/Last Panel #409 31 S40013242GTD 31 S35013242GTD #410 31 845022242GTD 31 S50022242GTD Insulation Schedule (Install in same direction as Covering) Id Qty Start Run Last Run BLK1 1 IB08800600602S BLK2 20 IB088007206OPS IB088007206OPS FASCIA RETAINER (RFR10) FIELD BEND 1" UP ON SSR PANEL START PANEL DIMENSION 101/2- CUT 0i 2'CUT PANEL DIMENSION SSR CUP TOP OF ie PURI ROOF PANEL TAPER TO 0' ---------- --- AT RIDGE AND ROOF HEIGHT CHANGE PANEL SAVE SUPPORT (RHS-) PARAPET WALL SSR AT MASONRY RF. HT. CHANGE IRCX001 BLANKET INSULATION ON PURLINS "mora 4/m/M 0 N (Field Repair Fastener) (1 bags) #55308 #17-14x1" S.S. Roof Fastener Attention: Refer to detail RCX001 on this page. 1 1'-6" Starter Panel (Cut Dim. = 10 1/2") Dimension Key 1. PRE -DRILLING 1/8 DIAMETER HOLES FOR ROOF STRUCTURAL FASTENERS MAY BE REQUIRED AT 11 GAGE PURLINS, NESTED PURLINS, PURLIN LAP LOCATIONS, AND/OR SECONDARY STRUCTURAL BEAMS 2. ROOF SHEETS ARE AN INTEGRAL, PART OF THE STRUCTURAL SYSTEM, REMOVAL OR.ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. 3. SEE JOB DETAILS FOR SHEETING AND TRIM FASTENER SPECIFICATION. 4. FOR PR PANEL, PRE -DRILLING OF SIDELAP FASTENERS REQUIRED DUE TO THE ABSENCE OF A PURLIN BEARING EDGE. SEE SED RC03B1. HIGHSIDE -123'-0"- ROOF COVERING PLAN VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 REV DATE BY DESCRIPTION it NTS 10/16/2001 17:59:17 0 ROOF COVERING PLAN BUILDER Systems Builders, Inc. CUSTOMER Capitol Construction LOCATION Indianapolis, Indiana PROJECT OH0111248-01EP2 Drawings FILENAME OH0111248-01EP2 Drawings.vpc k(s. �4 �16-- - 9 �.�STATE OF ��`�. '•: v� I ANP •' 1024, ss�pNA�•���\ OH0111248-01 DATE 10/17/2001 P BUILDINGS D—NfiCHECK VARCO-PRUDEN TGW/ TGW PAGE VPC VERSION: 2 . 6 C' VP Ref: Shape Name = Capitol THE VP ENGINEER'S SEAL APPLIES Building Code: 97UBC THIS DRAWING, INCLUDING THE INFORMATION HER ON, ONLY TO THE WORK PRODUCT OF Live Load: (Not Reducible) 20.00 psf REMAINS THE PROPERTY OF VP BUILDINGS. VP AND DESIGN AND PERFORMANCE IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING REQUIREMENTS SPECIFIED By VP. Coll. Load:Gravity 5.00, Uplift 0.00 psf DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND THE VP ENGINEER'S SEAL DOES Wind Speed: 71.00 m nPeePh SHALL NOT BE MODIFIED, REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN NOT APPLY TO THE PERFORMANCE Wind Exposure: B APPROVAL OF VP BUILDINGS, OR DESIGN OF ANY OTHER PRODUCT Ground Snow: 20.00 , Roof Snow: 20.00 psf OR COMPONENT FURNISHED BY VP Snow Exposure Category: 3 THE GENERAL CONTRACTOR AND/ORERECTORIS OLE EXCEPT TO ANY DESIGN OR PER- Seismic: Zone 1 RESPONSIBLE FORCONTRACTOR GOOD QUALITY WO IN ERECTING THIS BUILDING IN CONFORMANCE WIT KMI I TI- FORMANCE REQUIREMENTS SPECIFIED BY VP, Building Use: Standard occupancies g P DRAWING, DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP ERECTION GUIDES, AND INDUSTRY STANDARDS PERTAINING TO PROPE�2 ERECTION, INCLUDING THE CORRECT USE OF TEMPpRA BRACING. VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 REV DATE BY DESCRIPTION it NTS 10/16/2001 17:59:17 0 ROOF COVERING PLAN BUILDER Systems Builders, Inc. CUSTOMER Capitol Construction LOCATION Indianapolis, Indiana PROJECT OH0111248-01EP2 Drawings FILENAME OH0111248-01EP2 Drawings.vpc k(s. �4 �16-- - 9 �.�STATE OF ��`�. '•: v� I ANP •' 1024, ss�pNA�•���\ OH0111248-01 DATE 10/17/2001 P BUILDINGS D—NfiCHECK VARCO-PRUDEN TGW/ TGW PAGE VPC VERSION: 2 . 6 C'