Loading...
HomeMy WebLinkAbout47Covering Schedule Id Qty Start Panel Last Panel #786 20 V26022261KAG #787 8 V21010261KAG Direction Left to Right Left to Right Insulation Schedule (Install in same direction as Covering) Id Qty Start Run Last Run BLK1 1 IB027006004OPS Parts BLK2 1 IB027007204OPS 3'-4" BLK3 1 IB022007204OPS T2 BLK4 4 IB027007204OPS IB027007204OPS BLK5 1 IB022007204OPS Regal White BLK6 4 IB027007204OPS IB027007204OPS BLK7 1 IB022007204OPS 10'-8" BLK8 2 IB027007204OPS IB027007204OPS VP Ref: Shape Name = Capitol, Wall = 3 Trim Start Dim. Schedule 4",15'-4",48'-4"�78�_4�� Id Kit Qty Parts Color Details T1 9'-4",39'-4",72'-q" 3'-4" DF05,JT05 Regal White WC24B1 T2 3'-4" DF05,HTS05 Regal White WC24B2 T3 3'-4" TDFH05 Regal White WC24B4 T4 5'-1 1/4" DF10,JT07 Regal White WC24B1 T5 10'-8" DF12,HTS12 Regal White WC24B2 T6 53'-0" BAI,TRMX01 Ash Gray WCX001 T7 26'-2 1/2" AFTI2,ATF16,CTE12,CTE16fGAC1053 Ash Gray WC18B2 T8 1 BSI,GGCI,HCPOL Egyp---ian White RC38Al,RC52A6 T9 1 PRFI,RFCIR Egyp---ian White T10 1 MCC1 Egyp-=ian White RC38A1 T11 85'-0" RFRIO,RKF20,TDF710 Egyp,_ian White RCX002 R � A (2)#786 (3)#787 (8)#786 T10 (3)#787 (8)#786 (2)#787 � --- --- --- --- T11 (2)#786 --- --- — — - T9 C E a BLK1 BLK2 BLK3 (4)BLK4 BLK5 (4 ) BLK6- 1. WALL SHEETS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM, REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. 2. SEE JOB DETAILS FOR SHEETING AND TRIM FASTENER SPECIFICATION. 3. PRE -DRILLING 1/8 DIAMETER HOLES FOR WALL STRUCTURAL FASTENERS MAY BE REQUIRED AT 11 GAGE GIRTS, NESTED GIRTS, GIRT LAP LOCATIONS, AND/OR SECONDARY STRUCTURAL BEAMS 5'-0 COVERING ELEVATION AT 6 VP Ref: Shape Name = Capitol, Wall = 3 THE VP ENGINEER'S SEAL APPLIES Building Code: 97UBC ONLY TO THE WORK PRODUCT OF Live Load: (Not Reducible) 20.00 psf VP AND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY Vp, Coll. Load:Gravity 5.00, Uplift 0.00 psf THE VP ENGINEER'S SEAL DORS Wind Speed: 71.00 mph NOT APPLY TO THE PERFORMANCE Wind Exposure: B OR DESIGN OF ANY OTHER PRODUCT Ground Snow: 20.00 , Roof Snow: 20.00 psf OR COMPONENT FURNISHED BY VP Snow Exposure Category: 3 EXCEPT TO ANY DESIGN OR PER- Seismic: Zone 1 FORMANCE REQUIREMENTS SPECIFIED BY VP. Building Use :Standard Occupancies REMAINS THE PROPERTY OF VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE SUILDI G DESCRIBED IN THE APPLICABLE PURCHASE ORDER ND SHALL NOT BE MODIFIED, REPRODUCED OR USED F R AANY P ROVAROFURP BUILDING OSE WITHS UT PRIOR WRITTEN THE GENERAL CONTRACTOR AND/OR ERECTORS LELY RESPONSIBLE FOR ACCURATE, GOOD QUALITY WOMAN: IN ERECTING THIS BUILDING IN CONFORMANCE WIT THIS DRAWING, DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP ERECTION GUIDES, AND INDUSTRY STANDARDS PERTAINING TO PROPS ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING. VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 REV DATE3Y - DESCRIPTION -- it BLK7 (2)BLK8 �.. WA E STATE 161ANP-Tll ss�ONAL COVERING ELEVATION AT 6 Systems Builders, Inc. JOB OH0111248-01 Capitol Construction DATE Indianapolis, Indiana 10/17/2001 P BUILDINGS DRAWN/CHECK OH0111248-01EP2 Drawings VARCO-PRUDEN TGW/ TGW >00 VPC VERSION: 2.6 PAGE C C q' 10/16/2001 17:59:22 P'I.tNAMt: OH0111248-01EP2 Drawings.vpc