Loading...
HomeMy WebLinkAbout8SEE PLAN —t\ I I I VERTICAL WALL REINFORCING PER 8" CONCRETE BLOCKI ARCH. DRAWINGS PER ARCH. DWGS 1/2" PREMOLDED 1 JOINT MATERIAL SLAB PER PLAN FINISH GRADE TOP OF SLAB PER SITE DWGS. EL PER PLAN TOP OF FOOTING ME EL PER PLAN FOUNDATION INSULATION co _ PER ARCH. DRAWINGS I -v • - v N #5 AT 48" O.C. WITH 90' STD. HOOK. PROJECT 24" ABOVE TOP OF FOOTING FOOTING PER PLAN SECTION 1 3/4"=1'-0' F2 n n It n n n n n II II COLUMN AND BASE It BY BUILDING SUPPLIER n n n n 1/2" PREMOLDED JOINT MATERIAL COLUMN AND BASE It CONCRETE SLAB 11 1 PER PLAN 11 ' FINISH FLOOR BY BUILDING SUPPLIER .. : , .. EL 100'-0' n : n♦ JOINT MATERIAL n n CONCRETE SLAB PER PLAN ► ' , , ... .' ...' TOP/FOOTING FINISH FLOOR :• '►►. _ ►; .► ::, : ! :.o ;. ' • :: EL PER PLAN .�.• . R :' � A i // / ►' ' ` �• !' ►- r R ' :'. ';. EL PER PLAN �• : �: • • • W LLA cn OF ANCHOR BOLTS (DIA. BY j SEE FOOTING SCHEDULE BUILDING SUPPLIER) WITH •, : t° FOR FOOTING REINFORCING a 3" BOTTOM HOOK SEE PLAN wj SECTION 3/4"=1'-0' F2 SEE ARCH: 1/2" PREMOLDED JOINT MATERIAL EXTERIOR SLAB PER SITE DWGS.--7 2'-0" #4 AT 80 O.C. N SLAB PER PLAN TOP OF SLAB EL PER PLAN 14 x 2'-0' AT TOP OF FOOTING 12" O.C. AT DOORS EL PER PLAN FOUNDATION INSULATION • PER ARCH. DRAWINGS 15 AT 48" O.C. WITH 90' • : • ' STD. HOOK V• FOOTING PER PLAN SECTION Z 3/4'=1'-0' F2 EXIST. SLAB #4 x 1'-6" AT 24" O.C. DRILL 6" INTO EXISTING SLAB AND SET DOWELS IN 2—COMPONENT EPDXY SLAB PER PLAN TOP OF SLAB SECTION 3 3/4"=1'-0" F2 EXISTING WALL. SHORE AND BRACE AS REQUIRED FOR PARTIAL REMOVAL COLUMN AND BASE I[' n BELOW. BRACING SHALL REMAIN IN ii iii PLACE UNTIL WALL IS PERMANENTLY 13Y BUILDING SUPPLIER BRACED TO NEW STRUCTURE COLUMN ISOLATION POUR n n 11 I n n n n REMOVE PORTION OF EXIST. WALL AS REQUIRED TO PLACE NEW FOOTING AND RE—BUILD 1/2" PREMOLDED JOINT MATERIAL REMOVE PORTION OF EXIST. i i i CONCRETE SLAB FOUNDATION WALL TO ALLOW ii ii PER PLAN FINISH FLOOR PLACEMENT OF NEW FOOTING •' ti' li ' . : ►• : p ` EL 100•-0. TOP/FOOTING j/// i ... % ..• i : !► ; is ; . R : ti: ' EL PER PLAN LLI LLj •. r. at ANCHOR BOLTS (DIA. BY SEE FOOTING SCHEDULE EXISTING CONCRETE BUILDING SUPPLIER) WITH FOR FOOTING REINFORCING FOOTING TO REMAIN 3" BOTTOM HOOK SEE PLAN SECTION 6 3/4"=1'-0" F2 EL PER PLAN THIS SECTION APPLIES AT, FOOTING F3 ONLY (U.N.O ) SECTION 4 3/4"=1'-0' F2 1r-4 ---ir n n 11 II 11 11 COLUMN AND BASE It - BY BUILDING SUPPLIER COLUMN ISOLATION POUR I I n u 1/2- PREMOLDED EXISTING WALL it ii JOINT MATERIAL TO REMAIN n n CONCRETE SLAB II II PER PLAN FINISH FLOOR OL EL 100'-0' : #.-Ad L l`TOP/FOOTING •' • EL PER PLAN ANCHOR BOLTS (DW. BY . . BUILDING SUPPLIER) WITH ,%.: ' . ' :• =► (3)-18 CONT. 3" BOTTOM HOOK ;1. J11 14 TIES AT 12" O.C. 6 ►. I. D' (3)—#8 CONT. #5 x 2'-3' DOWELS AT 12' O.C. EXISTING CONCRETE 8 DRILL INTO EXISTING FOOTING AND FOOTING TO REMAIN SET IN 2—COMPONENT EPDXY SECTION T .y -ir-2--ir ii ii n n n n n u n n n n II I COLUMN AND BASE It n n BY BUILDING SUPPLIER 1/2' PREMOLDED JOINT MATERIAL n n CONCRETE SLAB PER PLAN FINISH FLOOR :... ►• ' :.! '.:+ , .. EL 100 —0 if .�.• . TOP/FOOTING // / ►' ' ` �• !' ►- r R ' :'. ';. EL PER PLAN �• : �: • •, : .: .CL 4 :. ° • ° �r. ��-ice•_ ��r � .�..�• _ _ ,�•+�� ANCHOR BOLTS (DIA. BY BUILDING SUPPLIER) SEE FOOTING SCHEDULE WITH FOR FOOTING REINFORCING . 3 BOTTOM HOOK M SEE PLAN THIS SECTION APPLIES AT, FOOTING F3 ONLY (U.N.O ) SECTION 4 3/4"=1'-0' F2 1r-4 ---ir n n 11 II 11 11 COLUMN AND BASE It - BY BUILDING SUPPLIER COLUMN ISOLATION POUR I I n u 1/2- PREMOLDED EXISTING WALL it ii JOINT MATERIAL TO REMAIN n n CONCRETE SLAB II II PER PLAN FINISH FLOOR OL EL 100'-0' : #.-Ad L l`TOP/FOOTING •' • EL PER PLAN ANCHOR BOLTS (DW. BY . . BUILDING SUPPLIER) WITH ,%.: ' . ' :• =► (3)-18 CONT. 3" BOTTOM HOOK ;1. J11 14 TIES AT 12" O.C. 6 ►. I. D' (3)—#8 CONT. #5 x 2'-3' DOWELS AT 12' O.C. EXISTING CONCRETE 8 DRILL INTO EXISTING FOOTING AND FOOTING TO REMAIN SET IN 2—COMPONENT EPDXY SECTION T .y