HomeMy WebLinkAboutRieth-Riley Construction Co, Inc/Eng/CO #02/51,646.91/River Road Phase II – Project #16-ENG-80CITY OF CARMEL
TO: Reith -Riley Construction Co., Inc CONTRACT CHANGE ORDER NO.: 2
1751 W Minnesota Street DATE: 10/5/18
Indianapolis, IN 46221 PROJECT NAME: 16 -ENG -80 River Road Phase II
CITY PROJECT NO.: #16 -ENG -80
CITY PO NO.: # 100659
CITY PO DATE: 8/16/17��"0"
I. You are directed to make the following changes in this Contract:
New Contract Pay Items and work considering utility delays and local request for added work in addition to
reconciliation of some completed contract items for 16 -ENG -80
SCHEDULED ADJUSTMENT
ITEM AMOUNT N OR (-) DAYS
See Attached $ 51,646.91
* See detail of items and summary of changed costs in attached Table for items 1 through 62
II. The following referenced Documents further describe the changes outlined in Paragraph 1,
and are to be considered a part of this Change Order: R.F.P.: _n/a W.D.C. NO.: n/a
Other. By Request from the City of Carmel
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $2.942.955,74
Contract Price will be increased by this Change Order $51,646.91
New Contract Price including this Change Order $2,994,602.65
Contract Time Days Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are Recommended The Above Changes Are Accepted Approved
CROSSROAD ENGINEERS
ENGINEER
3417 Sherman Drive
Address
Beech Grove, IN 46107
City/state/Zip
By: ,L.4Ae'-V1
Phone: 317-780-1555 117
Date: 10/9/2018
Reith -Riley Construction Co.. Inc
CONTRACTOR
1751 W Minnesota Street
Address
Indianapolis, IN 46221
City/S Z'
By:
Pho • 574- 7 - T83
Date: 11941t so
Ames Brainard, Mayor
y Kas�;ftan, ity Enhneer
Member
AT'T'EST:
her
�4l Christine S. Paule , Clerk -Treasurer
U Date: 7 /
PROJECT NAME: 16 -ENG -80 River Road Phase 11
CONTRACT CHANGE ORDER NO.: 2
Item
Number
Description
Unit Price
Original
Quantity
Original Amount
Actual or
Proposed
uanti
Proposed Contract
Amount
Over/Under
4
Sediment, Repave
('S'S
$38.48
13
$500.24
0
$ - $
(500.24)
5
6
7
Temporary Check Dam, Revetment Riprap
Temporary Wet Protection
Temporary Mulch
TON
EA
TON
$52.63
585.00
5420.00
104
47
6
$5,473.52
$3,995.00
$2,520.00
20.26
0
8
1 1,066.28 S
$ - S
S 3,360.00 S
(4,407.24)
(3,995.00)
840.00
8
Temporary Silt Fence
LFT
$1.80
3727
56,708.60
3411
$ 6,139.80 S
(568.80)
9
No. 2 Stone for Construction Drive
TON
$22.94
155
53,555.70
0
$ - $
(3,555.70)
10
No. 53 Stone for Construction Drive
TON
526.30
23
$604.90
43.52
S 1,144.58 S
539.68
11
Temporary Filter Stone
TON
$58.99
6
$353.94
0
$ - S
(353.94)
12
Temporary Geotextiles
SYS
$0.94
816
5767.04
26.6
$ 25.00 S
(742.04)
13
Temporary Seed Mixture
LBS
1200
340
$680.00
0
$ - $
(680.00)
14
Subgrade Treatment, Type 11
SYS
$14.68
401
$5,886.68
283.9
S 4,167.65 IS
(1,719.03)
15
Subgrade Treatment, Type IB
SYS
52.18
5695
$12,415.10
2200
$ 4,796.00 S
(7,619.10)
18
Structure Backfill, Type I
CYS
$27.14
1653
$44,862.42
1335.02
$ 36,232.44 S
(8,629.98)
19
Compacted Aggregate, No. 53, Base
TON
525.22
2093
$52,785.46
76.7
$ 1,934.37 S
(50,851.09)
20
Milling Asphalt, 1.5"
SYS
$1.65
3412
$5,629.80
2758.6
S 4,551.69 S
(1,078.11)
21
HMA Surface Ty C, C, 9.5 rttm
TON
562.20
1866
$116,065.20
0
$ - S
(116,065.20)
22
HMA Intermediate Type C, 19.0 mm
TON
550.58q5O
$133,581.78
2152.62
$ 108,879.52 S
(24,702.26)
23
HMA Base Type C, 25.0 mm
TON
146.66
$345,703.94
6285.09
S 293,262.30 S
(52,441.64)
24
HMA Intermediate Type C, OG 19.0 mm
TON
549.94
$159,308.60
3558.55
S 177,713.99 S
18,405.39
26
Colored and Jointed Concrete, 7"
SYS
582.23
$28,780.50
350.1
$ 28,788.72 S
8.22
29
HMA for Sidewalk
TON
574.16
$92,922.48
0
1 - S
(92,922.48)
30
Sidewalk Concrete, 4 in.
SYS
$72.49
52,609.64
49.3
$ 3,573.76 S
964.12
31
Curb Ramp, Concrete, Colored
SYS
$159.28
$11,149.60
67
Is 10,671.76 S
(477.84)
32
Delectable Warning Surfaces
SYS
$110.01
14
$1,540.14
14.8
$ 1,628.15 S
88.01
33
Curb, Concrete
LFT
$19.96
283
$5,648.68
297
$ 5,928.12 $
279.44
36
Modified Roll Curb
LFT
$20.63
349
57,199.87
357
S 7,364.91 S
165.04
37
PCCP for Approaches, 9 in.
SYS
$65.37
401
$26,213.37
404.62
$ 26,450.01 S
236.64
38
ScourStop Transition Mat
SYS
$130.00
51
56,630.00
33.8
$ 4,394.00 $
(2,236.00)
39
1ScourStop Turf Reinforcement Mat
SYS
$20.00
30
$600.00
0
$ - S
(600.00)
41
Mulched Seeding, U
SYS
52.94
10920
S32,104.80
23843
1 70,098.42 S
37,993.62
42
Erosion Control Blanket
SYS
$1.00
2874
$2,874.00
6006.12
S 6,006.12 $
3,132.12
43
Water
KG
$1.00
60
$60.00
0
$ - S
(60.00
44
Sod
SYS
$3.00
16629
549,887.00
12304.59
S 36,913.77 S
(12,973.23)
46
Pipe, Type 4, Circular, 6 in.
LFT
$4.60
9358
543,046.80
9159
$ 42,131.40 $
(915.40)
47
Pipe, Underdrain, Outlet, 6 in.
LFT 1
$13.00
24
1312.00
34
S 442.00 $
130.00
48
Pipe, RCP, 12 in.
LFT
546.77
1405
$65,711.85
1357.5
S 63,490.28 S
(2,221.58)
50
Pipe, RCP, 15 in.
LFT
$43.77
337
$14,750.49
332
$ 14,531.64 S
(218.85)
51
Pipe, RCP, 18 in.
LFT
$56.85
22
51,250.70
32
$ 1,819.20 $
568.50
52
Pipe, RCP, 21 in.
LFT
549.67
565
528,063.55
558
$ 27,715.86 S
(347.69)
53
Pipe, RCP, 24 in.
LFT
$57.45
669
$38,434.05
662
S 38,031.90 $
(402.15)
60
Aggregate for Underdrsms
CYS
542.25
899
$37,982.75
701.99
$ 29,659.08 S
(8,323.67)
61
Geotextiles for Underdrain
SYS
SL00
7955
$7,955.00
7470.01
$ 7,470.01 S
(484.99)
62
Casting, Adjust to Grade
EA
$585.02
2
51,170.04
I
S 585.02 $
(585.02)
63
Casting, Furnish & Adjust to Grade
EA
S1,446.3I
2
$2,892.62
0
s - S
(2,892.62)
64
Adjust to Grade, Valve Box
EA
$334.18
7
$2,339.26
5
$ 1,670.90 S
(668.36)
65
Fire Hydrant, Adjust to Grade
EA
51,484.04
2
52,968.08
1
S 1,484.04 S
(1,484.04)
72
Road Closure Sign Assembly
EA
$300.00
3
$900.00
5
$ 1,500.00 S
600.00
74
lCrinsawtion Sign A
EA
5140.00
8
51,120.00
10
$ 1,400.00 5
280.00
77
Barricade Bl -B
LFT
$10.00
120
$1,200.00
160
S 1,600.00 1
400.00
78
Sign Post, Square, Type 1, Reinforced Anchor Base
LFT
$15.00
185.5
$2,782.50
170.5
$ 2,557.50 S
(225.00)
81
Sign, Sheet, With Legend 0.100" Thickness
SFT
$18.00
61.74
$1,111.32
52.25
$ 940.50 S
(170.82)
84
CondaitMterduct
LFT
SI2.50
4949
$61,862.50
4822
S 60,275.00 $
(1,587.50)
85
Transverse Marking, Thermoplastic, Crosswalk White, 24 in.
LFT
$6.00
90
$540.00
99
$ 594.00 S
54.00
86
Line, Thermoplastic, Solid White, 4 in.
LFT
$1.25
640
$800.00
769.2
$ 961.501S
161.50
87
Line, Thermoplastic, Dotted White, 12 in.
LFT
$3.00
82
5246.00
80.2
S 240.60 S
(5.40
88
Transverse Marking, Thermoplastic, Yield White, 27 in.
LFT
$15.00
59
5885.00
59.2
$ 888.00 S
3.00
89
Line, Thermoplastic, Solid Yellow, 4 in.
LFT
$1.25
1836
$2,295.00
1630
S 2,037.50 S
(257.50)
90
Pavement Message Marking, Thermoplastic, Lane Indication Arrow
EA
$100.00
12
$1,200.00
15
$ 1,500.00 $
300.00
94
Conduit, PVC, 4 in.
LFT
$9.00
526
54,734.00
811
S 7,299.00 $
2,565.00
97
Conduit, Steel, Galvanized, 2"
LFT
$14.00
200
52,800.00
160
S 2,240.00 S
(560.00)
98
Wire, No. 4 Copper, in Plastic Duct, 4 1/C
LFT
$10.00
200
52,000.00
234
S 2,340.00 $
340.00
99
Wire, No. 4 Copper, in Plastic Duct in Trench, 4 1/C
LFT
$10.00
410
$4,100.00
500
S 5,000.00 S
900.00
105
Landscape Edging
LFT
57.50
142
$1,065.00
144
S 1,080.00 S
15.00
121
Duke Subgrade Treatment IC
SYS
S43.00
561
$24,123.00
4091
$ 17,595.60 S
(6,527.40)
122
Duke Underdrain Connection
LFT
545.34720
532,644.80
60
S 2,720.40 S
(29,924.40)
123
Duke Curb and Gutter
LFT
545.28
720
$32,601.60
8571
$ 38,814.02 S
6,212.42
PROJECT NAA: 16 -ENG -80 River Road Phase II
CONTRACT CHANGE ORDER NO.: 2
Numb
Description
Unit
Unit Price
original
Quantity
Original Amount
Actual or
Proposed
QuantityAmount
Proposed Contract
Over/Under
124
Duke 11.5" PCCP Patching
SYS
$94.58
242
522,888.36
246.24
S 23,289.38 S
401.02
127
2018 Grading Path and Cormnon Excavation
LS
$66,417.39
0
50.00
1
$ 66,417.39 S
66,417.39
128
2018 Compacted Agg. 053
TON
$26.81
0
$0.00
1662.94
S 44,583.42 S
44,583.42
129
2018 Type C Surface
TON
S66. 19
0
50.00
1839.7
S 121,769.74 S
121,769.74
130
2018 Path HMA
TON
$78.43
0
$0.00
1259.17
S 98,756.70 1 S
98,756.70
131
2018 Mobilizations
LS
$7,500.00
0
50.00
1
$ 7,500.001S
7,500.00
132
Duke Energy Delay Inefficiency Cost for Cuff and Paving
EA
54,677.53
0
$0.00
14
S 65,485.42 S
65,485.42
133
Path Sod Notch
LS
$3,820.22
0
$0.00
1
$ 3,820.22 S
3,520.22
134
Emsting Pavement Repair North End
LS
51,712.60
0
SOW
I
S 1,712.60 S
1,712.60
135
Path Coaune
LS
$1 1,()(X) (N)
(1
yn nn
I
4 I LO(X) 00 K
11,000 W
ITUIFAL OF CHANGE ORDER ITEMS
$51,646.91
ORIGINAL CONTRACT PRICE
CHANGE ORDER, #1
$2,912,148.31
$30,807.43
CHANGE ORDER, #2 $51,646.91
NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS $2,994,602.65
To: Lisa Scott
CROSSROAD ENGINEERS, P.C.
3417 Sherman Drive
Beech Grove, IN 46107
Phone: 317-780-1555
Fax: 317-780-6525
LETTER OF TRANSMITTAL
Date: 10/09/2018
City of Carmel, 2017 LOIT Bond Project: #16 -ENG -80 River Road Ph
One Civic Square
Carmel, IN 46032
WE ARE SENDING YOU
X Attached
_ Shop _
Drawings
_ Copy of _
Letter
Prints
Change Order
II Road Improvements
Samples Specifications
Copies: Date: Description:
1 10/09/2018 Chanize Order #2 for referenced oroiect.
THEY ARE TRANSMITTED AS CHECKED BELOW:
Remarks:
X For Approval _ Approved as submitted
For your use _ Approved as noted
As requested _ Returned for corrections
For bids due 20
_ Resubmit
blueline sets w/binder
_ Resubmit
Xerox sets w/binder
Return
corrected prints
Signed Lance Stahley
RECEIVED BY DATE
Memo
To: Doug Haney, Corporation Counsel
F. Lisa Scott
CC: Jeremy Kashman
Date: 10/11 /18
Re: C.O. #2 River Road Phase II Project #16 -ENG -80
Doug, please find attached 2 originals of same change order for project #16 -ENG -80 13e River Road Phase U.
Please review & initial for the next BPW Meeting.
Change Order #2- Original Contract Amount: $2,912,148.31 Increase: $51,646.91 New Contract Amount:
$2,994,602.65
Thank you,
Lisa Scott
0 Page 1