HomeMy WebLinkAboutCJ181033.0174CONCRETE SAMPLE PICK-UP REPORT
Report Number:CJ181033.0174
Service Date:11/09/18 7770 W New York St
Report Date:11/12/18 Indianapolis, IN 46214-2988
317-273-1690
Client Project
Gibraltar Construction Corp West Park: The Groves
Attn: Douglas Perry 3030 West 116th St.
2932 N Webster Ave Carmel, IN 46032
Indianapolis, IN 46219
Project Number: CJ181033
Services: As requested, a representative of Earth Exploration, Inc. was on-site to retrieve concrete specimens.
Earth Exploration, Inc. Rep.: Jamie Conwell
Reported To:Ron Hueston with Gibraltar Construction
Contractor:
Report Distribution:
(1) Gibraltar Construction Corp, Douglas
Perry
(1) City of Carmel IN, Mike Sheeks
(1) Johnson Wilbur Adams, Inc., Michael Wilbur (1) Smith Group JJR, Jessie Fink Reviewed By:____________________________________
Jeremy Clem
Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
AF0001, 10-16-13, Rev.3 Page 1 of 1
Weather: Sunny, mid 40’s
1.Earth Exploration, Inc. (EEI) was on site at the request of Bill with Gibraltar Construction to pick up
compressive strength specimens cast on 11-08-2018 representing bridge footings. The specimens were
transported to our Indianapolis, In. laboratory for final curing in general conformance with ASTM C-31,
Making and Curing Concrete Test Specimens in the Field.