Loading...
HomeMy WebLinkAboutCJ181033.0174CONCRETE SAMPLE PICK-UP REPORT Report Number:CJ181033.0174 Service Date:11/09/18 7770 W New York St Report Date:11/12/18 Indianapolis, IN 46214-2988 317-273-1690 Client Project Gibraltar Construction Corp West Park: The Groves Attn: Douglas Perry 3030 West 116th St. 2932 N Webster Ave Carmel, IN 46032 Indianapolis, IN 46219 Project Number: CJ181033 Services: As requested, a representative of Earth Exploration, Inc. was on-site to retrieve concrete specimens. Earth Exploration, Inc. Rep.: Jamie Conwell Reported To:Ron Hueston with Gibraltar Construction Contractor: Report Distribution: (1) Gibraltar Construction Corp, Douglas Perry (1) City of Carmel IN, Mike Sheeks (1) Johnson Wilbur Adams, Inc., Michael Wilbur (1) Smith Group JJR, Jessie Fink Reviewed By:____________________________________ Jeremy Clem Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. AF0001, 10-16-13, Rev.3 Page 1 of 1 Weather: Sunny, mid 40’s 1.Earth Exploration, Inc. (EEI) was on site at the request of Bill with Gibraltar Construction to pick up compressive strength specimens cast on 11-08-2018 representing bridge footings. The specimens were transported to our Indianapolis, In. laboratory for final curing in general conformance with ASTM C-31, Making and Curing Concrete Test Specimens in the Field.