Loading...
HomeMy WebLinkAbout94N - Truss Placement Guide9-01-02 TOP9-01-02 TOP9-01-02 TOP10-01-02 TOP12-01-02 TOP9-01-02 TOP10-01-02 TOP10-01-02 TOP10-01-02 TOP10-01-02 TOB10-01-02 TOPFramer to fill in roughopenings as needed.HTU26HTU26HTU26HTU26HTU26HTU26HTU26GE01GE02T03TG01GE03T04T06T09T10GE04GE05GE06T14V01V02V03V04V05V06V07V08V09V10V11GE07V12V13V14V15V16V17V18V19V20V21PBE01PBE02PBE02T01(14)T02(3)T05(4)T07(3)T08(3)T11(5)T12(2)T13(5)PB01(14)PB02(12)2-04-009-04-0014-00-006-00-0021-11-002-08-0034-00-0042-03-004-08-0011-04-0014-07-0018-08-0011-08-004-00-0016-00-0012-07-0013-00-002-00-004-00-0029-04-007-04-008-0080-11-00IRC 2003TPI 200220TLL -10TDL -10BDLWedgewood Building CompanyBroach ResidenceCarmel1/4"=1'June 11, 2018PHB18801794CUSTOMER:LOCATION:MODEL:JOB #:DATE:DESIGNER: DESIGN INFORMATION:SCALE:9028 Old SR 67 SouthMooresville, IN 46158(317) 834-5380Truss Placement Guide1) This layout is intended for the purpose of truss locationand placement only. Refer to the building plans for actualbuilding construction.2) All dimensions shown 00-00-00 are in feet-inches-sixteenths.3) Trusses are spaced 24" on center unless otherwise noted.4) Do not cut or modify trusses.5) Refer to the individual truss design drawings for the locationof member bracing, uplift and truss end reactions.6) Installation of all temporary and permanent bracing isessential. See truss drawings, BCSI-B2 Summary Sheetand building designer requirements.7) Non-bearing walls may not be shown on layout.Left end of truss, as shown on engineeringdrawing, is indicated by the triangle symbol