Loading...
HomeMy WebLinkAboutReq. Plot informationRE: DRAINAGE SHALES All required drainage swales must be shown On the plot plan and constructed in all subdivisions prior to the Department of Cmnnunity Developmnt performin a final inspection of any strut CAHMM/CIAY ' DEPARTT�Tr GF C�JNITY DEVELLIPMENT per plans on file or per the following: Constructed swalus shall be a odnimuw of 1'b" deep with side SIO BUILDING PERMIT of not less than 4 to I. REQUIRED PLOr PLAN INFORMATION The below listed information must be included on all site or plot, plans which are to be submitted to the Carmel/Clay Department of Collwnity Development as a part of the Building Permit review process. If limited, pertinent information is desired from the Department of Community Development, a five (5) day waiting period MAY be required in order to search files for the desired information. The below REQUIRED information can be secured from the landowner or land developer: Lot drawn to -scale All dimensions Scale and North arrow All roads, alleys, etc., right-of-way All other utility and drainage right-of-way and easements Any applicable flood plain area Building pad elevation and lot corner elevations All accessory buildings existing or proposed All sidewalks and driveways Sewer and water lines, septic system and well location Drainage flow arrows All drainage swales and facilities (retention/detention areas etc.) Dimensional cross sections of all drainage swales All subsurface drainage facilities I certify that all of the above listed information is shown coapletely and accurately on the attadhed plot or site plan as submitted with a building permit application to the Camel/Clay Department of Community Development SIGNATURE: GyX44 -- � William B. Blake ADDRESS',The C.P. Morgan Co., Inc., 255 E. Carmel Drive PHONE: 848-4040 NAME OF PLUMBING CONTRACTOR: Earl Gray and Sons VALID STATE LICENSE NUMBER: #105909(Corp) #102267(Mr. Gray's)