Loading...
HomeMy WebLinkAboutMechanical compliance-reportCOMcheck Software Version 4.0.0 Mechanical Compliance Certificate Project Title: 90.1 (2007) Standard Project Type: New Construction Location: Carmel, Indiana Climate Zone: 5a Construction Site: 13590 N. Meridian Street Carmel, IN 46032 Owner/Agent: Avan Carmel, LLC 106 Finell Street, unit 1 Weymoth, MA 02188 Designer/Contractor: Matthew Ellis Forza Architecture 654 South Shelby Street Suite 301 Louisville, KY 40202 502-896-1328 cmellis@marshall.net Project Information Energy Code: Landmark Recovery of Carmel Mechanical Systems List Quantity System Type & Description Heating: 1 each - Central Furnace, Gas, Capacity = 120 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency = 80.00% Et Cooling: 1 each - Single Package DX Unit, Capacity = 57 kBtu/h, Air-Cooled Condenser Proposed Efficiency = 14.00 SEER, Required Efficiency = 13.00 SEER Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 1900 CFM, 0.8 motor nameplate hp 2 HVAC Split Systems (Single Zone): Packaged Terminal Heat Pump Heating Mode: Capacity = 14 kBtu/h, Proposed Efficiency = 3.00 COP, Required Efficiency = 2.89 COP Cooling Mode: Capacity = 12 kBtu/h, Proposed Efficiency = 11.00 EER, Required Efficiency = 9.74 EER Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 2 Supply, Constant Volume, 500 CFM, 0.5 motor nameplate hp 30 HVAC System 2 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 80 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency = 80.00% Et Cooling: 1 each - Split System, Capacity = 57 kBtu/h, Air-Cooled Condenser Proposed Efficiency = 14.00 SEER, Required Efficiency = 13.00 SEER Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 1900 CFM, 0.8 motor nameplate hp 1 HVAC Ground Unit (Single Zone): Gas Storage Water Heater, Capacity: 80 gallons, Input Rating: 199 Btu/h w/ Circulation Pump Proposed Efficiency: 90.00 % Et, Required Efficiency: 80.00 % Et 3 Water Heater 1: Project Title: Data filename: Landmark Recovery of Carmel C:\Users\Matthew\Documents\COMcheck\carmel.cck Report date: 07/13/18 Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.0.0 and to comply with the mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: Landmark Recovery of Carmel C:\Users\Matthew\Documents\COMcheck\carmel.cck Report date: 07/13/18 Page 2 of 11 Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.0.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 90.1 (2007) Standard 90.1 (2007) Standard Plan Review Complies? Comments/Assumptions 4.2.2, 6.4.2 [PR2]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Complies Does Not Not Observable Not Applicable Requirement will be met. 4.2.2, 7.4.1 [PR3]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.4 [PR5]1 Detailed instructions for HVAC systems commissioning included on the plans or specifications for projects >=50,000 ft2. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: 90.1 (2007) Standard Footing / Foundation Inspection Complies? Comments/Assumptions 6.4.3.8 [FO9]3 Freeze protection and snow/ice melting system sensors for future connection to controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Landmark Recovery of Carmel C:\Users\Matthew\Documents\COMcheck\carmel.cck Report date: 07/13/18 Page 4 of 11 90.1 (2007) Standard Plumbing Rough-In Inspection Complies? Comments/Assumptions 7.4.3 [PL1]2 Service hot-water piping systems insulated. Where piping is installed in or under a slab, verification may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.4.1 [PL2]3 Temperature controls installed on service water heating systems (<=120ºF to maximum temperature for intended use). Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.4.2 [PL3]1 Automatic time switches installed to automatically switch off the recirculating hot-water system or heat trace. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Landmark Recovery of Carmel C:\Users\Matthew\Documents\COMcheck\carmel.cck Report date: 07/13/18 Page 5 of 11 Section # & Req.ID Mechanical Rough-In Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions 6.4.1.4, 6.4.1.5 [ME1]2 HVAC equipment efficiency verified. Non-NAECA HVAC equipment labeled as meeting 90.1. Efficiency:_____ Efficiency:_____ Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. 6.4.3.4.1 [ME3]3 Stair and elevator shaft vents have motorized dampers that automatically close. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.4.3.4.2, 6.4.3.4.3, 6.4.3.4.4 [ME4]3 Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Complies Does Not Not Observable Not Applicable Exception: Gravity dampers acceptable in buildings 3 stories. 6.4.3.4.5 [ME5]3 Ventilation fans >0.75 hp have automatic controls to shut off fan when not required. Complies Does Not Not Observable Not Applicable Exception: HVAC systems Section # & Req.ID Mechanical Rough-In Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions 6.5.2.3 [ME19]3 Dehumidification controls provided to prevent reheating, recooling, mixing of hot and cold airstreams or concurrent heating and cooling of the same airstream. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.5.4.1 [ME25]3 HVAC pumping systems >10 hp designed for variable fluid flow. Complies Does Not Not Observable Not Applicable Exception: Systems with three or fewer control valves. 6.5.6.1 [ME30]1 Exhaust air energy recovery on systems >=5,000 cfm and 70% of design supply air. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.7.1 [ME32]2 Kitchen hoods >5,000 cfm have make up air >=50% of exhaust air volume. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.5.7.2 [ME33]1 Fume hoods exhaust systems >=15,000 cfm have VAV hood exhaust and supply systems, direct make-up air or heat recovery. 90.1 (2007) Standard Rough-In Electrical Inspection Complies? Comments/Assumptions 10.4.1 [EL9]2 Electric motors meet requirements where applicable. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Landmark Recovery of Carmel C:\Users\Matthew\Documents\COMcheck\carmel.cck Report date: 07/13/18 Page 8 of 11 90.1 (2007) Standard Final Inspection Complies? Comments/Assumptions 6.4.3.1.1 [FI2]2 Heating and cooling to each zone is controlled by a thermostat control. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.1.2, 6.4.3.2, 6.4.3.3, 6.4.3.3.1, 6.4.3.3.2 [FI3]2 Thermostatic controls have a 5 °F deadband. Complies Does Not Not Observable Not Applicable Exception: Thermostats requiring manual changeover between heating and cooling. 6.4.3.5 [FI5]3 Heat pump controls prevent supplemental electric resistance heat from coming on when not needed. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.7 [FI6]3 When humidification and dehumidification are provided to a zone, simultaneous operation is prohibited. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.1 [FI7]3 Furnished HVAC as-built drawings submitted within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.2 [FI8]3 90.1 (2007) Standard Final Inspection Complies? Comments/Assumptions 6.4.3.3.2 [FI22]1 Setback controls allow automatic restart and temporary operation as required for maintenance. Complies Does Not Not Observable Not Applicable Exception: null. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Landmark Recovery of Carmel C:\Users\Matthew\Documents\COMcheck\carmel.cck Report date: 07/13/18 Page 10 of 11 Project Title: Data filename: Landmark Recovery of Carmel C:\Users\Matthew\Documents\COMcheck\carmel.cck Report date: 07/13/18 Page 11 of 11 Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.3 [FI9]1 An air and/or hydronic system balancing report is provided for HVAC systems serving zones >5,000 ft2 of conditioned area. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.4 [FI10]1 HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.4.3 [FI11]3 Public lavatory faucet water temperature <=110°F. Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.4.4 [FI12]3 Controls are installed that limit the operation of a recirculation pump installed to maintain temperature of a storage tank. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.2 [FI20]1 Temperature controls have setpoint overlap restrictions. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.3.1 [FI21]1 HVAC systems equipped with at least one automatic shutdown control. Complies Does Not Not Observable Not Applicable Exception: null. 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Landmark Recovery of Carmel C:\Users\Matthew\Documents\COMcheck\carmel.cck Report date: 07/13/18 Page 9 of 11 Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.8.1 [ME34]3 Unenclosed spaces that are heated use only radiant heat. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.9 [ME35]1 Hot gas bypass limited to: <=240 kBtu/h – 50% >240 kBtu/h – 25% Complies Does Not Not Observable Not Applicable Requirement will be met. 6.5.9 [ME35]1 Hot gas bypass limited to: <=240 kBtu/h – 50% >240 kBtu/h – 25% Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.2 [ME36]2 Service water heating equipment meets efficiency requirements. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Landmark Recovery of Carmel C:\Users\Matthew\Documents\COMcheck\carmel.cck Report date: 07/13/18 Page 7 of 11 intended to operate continuously. 6.4.3.9 [ME6]1 Demand control ventilation provided for spaces >500 ft2 and >40 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. Complies Does Not Not Observable Not Applicable Exception: Systems with a design outdoor airflow less than 1200 cfm. 6.4.4.1.1 [ME7]3 Insulation exposed to weather protected from damage. Insulation outside of the conditioned space and associated with cooling systems is vapor retardant. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.1.2 [ME8]2 HVAC ducts and plenums insulated. R-_____ R-_____ Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.1.3 [ME9]2 HVAC piping insulation thickness. _____ in. _____ in. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.2.1 [ME10]2 Ducts and plenums sealed based on static pressure and location. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.2.2 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.4.4.2.2 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.4.4.2.2 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Landmark Recovery of Carmel C:\Users\Matthew\Documents\COMcheck\carmel.cck Report date: 07/13/18 Page 6 of 11 Data filename: Landmark Recovery of Carmel C:\Users\Matthew\Documents\COMcheck\carmel.cck Report date: 07/13/18 Page 3 of 11 Page 1 of 11