HomeMy WebLinkAboutMechanical compliance-reportCOMcheck Software Version 4.0.0
Mechanical Compliance Certificate
Project Title:
90.1 (2007) Standard
Project Type: New Construction
Location: Carmel, Indiana
Climate Zone: 5a
Construction Site:
13590 N. Meridian Street
Carmel, IN 46032
Owner/Agent:
Avan Carmel, LLC
106 Finell Street, unit 1
Weymoth, MA 02188
Designer/Contractor:
Matthew Ellis
Forza Architecture
654 South Shelby Street
Suite 301
Louisville, KY 40202
502-896-1328
cmellis@marshall.net
Project Information
Energy Code:
Landmark Recovery of Carmel
Mechanical Systems List
Quantity System Type & Description
Heating: 1 each - Central Furnace, Gas, Capacity = 120 kBtu/h
Proposed Efficiency = 80.00% Et, Required Efficiency = 80.00% Et
Cooling: 1 each - Single Package DX Unit, Capacity = 57 kBtu/h, Air-Cooled Condenser
Proposed Efficiency = 14.00 SEER, Required Efficiency = 13.00 SEER
Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 1900 CFM, 0.8 motor nameplate hp
2 HVAC Split Systems (Single Zone):
Packaged Terminal Heat Pump
Heating Mode: Capacity = 14 kBtu/h,
Proposed Efficiency = 3.00 COP, Required Efficiency = 2.89 COP
Cooling Mode: Capacity = 12 kBtu/h,
Proposed Efficiency = 11.00 EER, Required Efficiency = 9.74 EER
Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 2 Supply, Constant Volume, 500 CFM, 0.5 motor nameplate hp
30 HVAC System 2 (Single Zone):
Heating: 1 each - Central Furnace, Gas, Capacity = 80 kBtu/h
Proposed Efficiency = 80.00% Et, Required Efficiency = 80.00% Et
Cooling: 1 each - Split System, Capacity = 57 kBtu/h, Air-Cooled Condenser
Proposed Efficiency = 14.00 SEER, Required Efficiency = 13.00 SEER
Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 1900 CFM, 0.8 motor nameplate hp
1 HVAC Ground Unit (Single Zone):
Gas Storage Water Heater, Capacity: 80 gallons, Input Rating: 199 Btu/h w/ Circulation Pump
Proposed Efficiency: 90.00 % Et, Required Efficiency: 80.00 % Et
3 Water Heater 1:
Project Title:
Data filename:
Landmark Recovery of Carmel
C:\Users\Matthew\Documents\COMcheck\carmel.cck
Report date: 07/13/18
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.0.0 and to comply with the mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
Landmark Recovery of Carmel
C:\Users\Matthew\Documents\COMcheck\carmel.cck
Report date: 07/13/18
Page 2 of 11
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.0.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 90.1 (2007) Standard
90.1
(2007)
Standard
Plan Review Complies? Comments/Assumptions
4.2.2,
6.4.2
[PR2]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
4.2.2,
7.4.1
[PR3]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the service water
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.4
[PR5]1
Detailed instructions for HVAC
systems commissioning included on
the plans or specifications for projects
>=50,000 ft2.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
90.1
(2007)
Standard
Footing / Foundation Inspection Complies? Comments/Assumptions
6.4.3.8
[FO9]3
Freeze protection and snow/ice
melting system sensors for future
connection to controls.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename:
Landmark Recovery of Carmel
C:\Users\Matthew\Documents\COMcheck\carmel.cck
Report date: 07/13/18
Page 4 of 11
90.1
(2007)
Standard
Plumbing Rough-In Inspection Complies? Comments/Assumptions
7.4.3
[PL1]2
Service hot-water piping systems
insulated. Where piping is installed in
or under a slab, verification may need
to occur during Foundation Inspection.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.4.1
[PL2]3
Temperature controls installed on
service water heating systems
(<=120ºF to maximum temperature
for intended use).
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.4.2
[PL3]1
Automatic time switches installed to
automatically switch off the
recirculating hot-water system or heat
trace.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename:
Landmark Recovery of Carmel
C:\Users\Matthew\Documents\COMcheck\carmel.cck
Report date: 07/13/18
Page 5 of 11
Section
#
& Req.ID
Mechanical Rough-In
Inspection
Plans Verified
Value
Field Verified
Value Complies? Comments/Assumptions
6.4.1.4,
6.4.1.5
[ME1]2
HVAC equipment efficiency
verified. Non-NAECA HVAC
equipment labeled as meeting
90.1.
Efficiency:_____ Efficiency:_____ Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list
for values.
6.4.3.4.1
[ME3]3
Stair and elevator shaft vents
have motorized dampers that
automatically close.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.4.3.4.2,
6.4.3.4.3,
6.4.3.4.4
[ME4]3
Outdoor air and exhaust systems
have motorized dampers that
automatically shut when not in
use and meet maximum leakage
rates. Check gravity dampers
where allowed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Gravity dampers
acceptable in buildings 3
stories.
6.4.3.4.5
[ME5]3
Ventilation fans >0.75 hp have
automatic controls to shut off fan
when not required.
Complies
Does Not
Not Observable
Not Applicable
Exception: HVAC systems
Section
#
& Req.ID
Mechanical Rough-In
Inspection
Plans Verified
Value
Field Verified
Value Complies? Comments/Assumptions
6.5.2.3
[ME19]3
Dehumidification controls
provided to prevent reheating,
recooling, mixing of hot and cold
airstreams or concurrent heating
and cooling of the same
airstream.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.5.4.1
[ME25]3
HVAC pumping systems >10 hp
designed for variable fluid flow.
Complies
Does Not
Not Observable
Not Applicable
Exception: Systems with
three or fewer control valves.
6.5.6.1
[ME30]1
Exhaust air energy recovery on
systems >=5,000 cfm and 70%
of design supply air.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.7.1
[ME32]2
Kitchen hoods >5,000 cfm have
make up air >=50% of exhaust
air volume.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.5.7.2
[ME33]1
Fume hoods exhaust systems
>=15,000 cfm have VAV hood
exhaust and supply systems,
direct make-up air or heat
recovery.
90.1
(2007)
Standard
Rough-In Electrical Inspection Complies? Comments/Assumptions
10.4.1
[EL9]2
Electric motors meet requirements
where applicable.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename:
Landmark Recovery of Carmel
C:\Users\Matthew\Documents\COMcheck\carmel.cck
Report date: 07/13/18
Page 8 of 11
90.1
(2007)
Standard
Final Inspection Complies? Comments/Assumptions
6.4.3.1.1
[FI2]2
Heating and cooling to each zone is
controlled by a thermostat control.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.1.2,
6.4.3.2,
6.4.3.3,
6.4.3.3.1,
6.4.3.3.2
[FI3]2
Thermostatic controls have a 5 °F
deadband.
Complies
Does Not
Not Observable
Not Applicable
Exception: Thermostats requiring manual changeover
between heating and cooling.
6.4.3.5
[FI5]3
Heat pump controls prevent
supplemental electric resistance heat
from coming on when not needed.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.7
[FI6]3
When humidification and
dehumidification are provided to a
zone, simultaneous operation is
prohibited.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.1
[FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.2
[FI8]3
90.1
(2007)
Standard
Final Inspection Complies? Comments/Assumptions
6.4.3.3.2
[FI22]1
Setback controls allow automatic
restart and temporary operation as
required for maintenance.
Complies
Does Not
Not Observable
Not Applicable
Exception: null.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename:
Landmark Recovery of Carmel
C:\Users\Matthew\Documents\COMcheck\carmel.cck
Report date: 07/13/18
Page 10 of 11
Project Title:
Data filename:
Landmark Recovery of Carmel
C:\Users\Matthew\Documents\COMcheck\carmel.cck
Report date: 07/13/18
Page 11 of 11
Furnished O&M manuals for HVAC
systems within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.3
[FI9]1
An air and/or hydronic system
balancing report is provided for HVAC
systems serving zones >5,000 ft2 of
conditioned area.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.4
[FI10]1
HVAC control systems have been
tested to ensure proper operation,
calibration and adjustment of controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.4.3
[FI11]3
Public lavatory faucet water
temperature <=110°F.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.4.4
[FI12]3
Controls are installed that limit the
operation of a recirculation pump
installed to maintain temperature of a
storage tank.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.2
[FI20]1
Temperature controls have setpoint
overlap restrictions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.3.3.1
[FI21]1
HVAC systems equipped with at least
one automatic shutdown control.
Complies
Does Not
Not Observable
Not Applicable
Exception: null.
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename:
Landmark Recovery of Carmel
C:\Users\Matthew\Documents\COMcheck\carmel.cck
Report date: 07/13/18
Page 9 of 11
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.8.1
[ME34]3
Unenclosed spaces that are
heated use only radiant heat.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.9
[ME35]1
Hot gas bypass limited to: <=240
kBtu/h – 50% >240 kBtu/h – 25%
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.5.9
[ME35]1
Hot gas bypass limited to: <=240
kBtu/h – 50% >240 kBtu/h – 25%
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.2
[ME36]2
Service water heating equipment
meets efficiency requirements.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename:
Landmark Recovery of Carmel
C:\Users\Matthew\Documents\COMcheck\carmel.cck
Report date: 07/13/18
Page 7 of 11
intended to operate
continuously.
6.4.3.9
[ME6]1
Demand control ventilation
provided for spaces >500 ft2 and
>40 people/1000 ft2 occupant
density and served by systems
with air side economizer, auto
modulating outside air damper
control, or design airflow >3,000
cfm.
Complies
Does Not
Not Observable
Not Applicable
Exception: Systems with a
design outdoor airflow less
than 1200 cfm.
6.4.4.1.1
[ME7]3
Insulation exposed to weather
protected from damage.
Insulation outside of the
conditioned space and associated
with cooling systems is vapor
retardant.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.4.1.2
[ME8]2
HVAC ducts and plenums
insulated.
R-_____ R-_____ Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.4.1.3
[ME9]2
HVAC piping insulation thickness. _____ in. _____ in. Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.4.2.1
[ME10]2
Ducts and plenums sealed based
on static pressure and location.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water
column requires air leakage
testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water
column requires air leakage
testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water
column requires air leakage
testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename:
Landmark Recovery of Carmel
C:\Users\Matthew\Documents\COMcheck\carmel.cck
Report date: 07/13/18
Page 6 of 11
Data filename:
Landmark Recovery of Carmel
C:\Users\Matthew\Documents\COMcheck\carmel.cck
Report date: 07/13/18
Page 3 of 11
Page 1 of 11