Loading...
HomeMy WebLinkAboutA6033'-0" TOP OF CTOP2'-10 3/4" TOP OF FRAMING1'-10" CTOP OPENING 1'-9" TOP OF CTOP1'-7 3/4" TOP OF FRAMING+/- 3'-8 3/4" TOP OF CAP+/- 3'-6 1/4" TOP OF FRAMING3'-0" TOP OF CTOP3'-2 3/4" TOP OF FRAMING+/- 3'-8 3/4" TOP OF CAP+/- 3'-6 1/4" TOP OF FRAMING3'-0" TOP OF RAIL3'-3" TOP OF EXIST. POSTNEW FRAMED & VENEERED WALL WITH LIMESTONE CAP BEYOND. TOP OF NEW CAP TO MATCH HEIGHT OF EXISTING LIMESTONE CAP TREATED 2X4 SILL PLATE PORCELAIN VENEER TILE MORTARED TO 1/2" PERMABASE BACKERBOARD (TYP. ALL EXPOSED FACES) 3CM LEVEL "A" GRANITE COUNTERTOP W/ SUEDE FINISH & EASED EDGE TREATED 2X4 STUDS @ 16" O/C TREATED DOUBLE 2X4 TOP PLATE SEALANT @ JOINT ALONG VENEERED WALL & COUNTERTOP VERIFY OPENING DIMENSIONS WITH HOMEOWNER-PROVIDED GREEN EGG NEW TREATED 2X FRAMED & VENEERED WALL WITH LIMESTONE CAP BEYOND. TOP OF NEW CAP TO MATCH HEIGHT OF EXISTING LIMESTONE CAP. THICKNESS OF WALL TO MATCH EXISTING. BUILT-UP PORCELAIN PAVER SYSTEM (HEIGHT & THICKNESS VARIES, SEE PAVER DETAILS) PORCELAIN VENEER TILE MORTARED TO 1/2" PERMABASE BACKERBOARD (TYP. ALL EXPOSED FACES) 3CM LEVEL "A" GRANITE COUNTERTOP W/ SUEDE FINISH & EASED EDGE TREATED 2X4 STUDS @ 16" O/C TREATED DOUBLE 2X4 TOP PLATE SEALANT @ JOINT ALONG VENEERED WALL & COUNTERTOP EXISTING 2X FRAMING NEW 3/4" PLYWOOD DECKING TREATED 2X4 SILL PLATE (TYP.) NEW LIMESTONE CAP. TOP OF NEW CAP TO MATCH HEIGHT OF EXISTING LIMESTONE CAP. THICKNESS OF WALL TO MATCH EXISTING. BUILT-UP PORCELAIN PAVER SYSTEM (HEIGHT & THICKNESS VARIES, SEE PAVER DETAILS) PORCELAIN VENEER TILE MORTARED TO 1/2" PERMABASE BACKERBOARD (TYP. ALL EXPOSED FACES) TREATED 2X STUDS @ 16" O/C EXISTING 2X FRAMING NEW 3/4" PLYWOOD DECKING TREATED 2X SILL PLATE ON NEW PLYWOOD DECKING EXISTING BEAM & STONE VENEER TREATED DOUBLE 2X TOP PLATE @ 16" O/C LIMESTONE VENEER SILL FOR TRANSITION FROM EXISTING STONE TO NEW PORCELAIN VENEER EXISTING LIMESTONE CAP BUILT-UP PORCELAIN PAVER SYSTEM (HEIGHT & THICKNESS VARIES, SEE PAVER DETAILS) EXISTING 2X FRAMING NEW 3/4" PLYWOOD DECKING EXISTING BEAM & STONE VENEER NEW R/S 2X4 CEDAR BOTTOM RAIL, STAINED & SEALED NEW 3/4" BLACK ALUMINUM BALUSTER @ 4" O/C NEW 2X6 R/S CEDAR TOP RAIL, STAINED & SEALED. ENSURE TOP OF RAIL TO TOP OF HIGHEST POINT OF PAVER IS NO LESS THAN 3'-0" NEW TREATED 6X6 POST WRAPPED WITH 1X R/S CEDAR, STAINED & SEALED. NEW POST TO BE ANCHORED TO EXISTING LIMESTONE CAP WITH SIMPSON STRONG-TIE POST CONNECTOR BC60 (OR EQUIV.). LEVEL POST CONNECTOR ON TAPERED LIMESTONE CAP WITH ADHERED PLASTIC SHIMS NEW CEDAR PYRAMID POST CAP, STAINED & SEALED #1 ISSUE DATE: 2018-10-05 REV: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standardwhen not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications. McROBERTS RESIDENCEOUTDOOR LIVING RENOVATION JOSH McROBERTS 1815 E. 109TH STINDIANAPOLIS, INDIANA 46280Approved By: Date: A603 FINAL Craig Dice Designer cdice@caseindy.com Dave Null Lead Designer dnull@caseindy.com 232160133 JOB NUMBER: FIRST FLOOR SECTIONS SCALE: AS NOTED GREEN EGG SECTION SCALE: 1/2" = 1'-0" AA COUNTERTOP SECTION SCALE: 1/2" = 1'-0"BB VENEERED PARTIAL-HEIGHT WALL SECTION SCALE: 1/2" = 1'-0" CC NEW RAIL SECTION SCALE: 1/2" = 1'-0"DD #2 2018-10-09 10/19/18 David Rutti