Loading...
HomeMy WebLinkAboutA610ROOM FINISH SCHEDULE ROOM NO. ROOM NAME FLOOR WALLS CEILING REMARKS NORTH EAST SOUTH WEST FINISH BASE MTL. FIN. MTL. FIN. MTL. FIN. MTL. FIN. MTL. FIN. 100 LOUNGE F1, F2, F3 W61 WT2 WF1 WT2 WF1, WF2, WF3 WT2 WF1 WT2 WF1 GYP, WOOD C2, C3, C4 101 HALLWAY F1 W61 WT2 WF1 WT2 WF1 WT2 WF1 WT2 WF1 GYP Cl 102 LOCKER ROOM #1 F2 W61 WT3 WF1 WT3 WF1 WT3 WF1 WT3 WF1 GYP Cl 103 LAV F4 W61, W62 WT3 WF1 WT3 WF4 WT3 WF1 WT3 WF1 GYP Cl 104 SHOWER F4 W61, W62 WT3 WF4 WT3 WF1, WF4 WT3 WF1, WF4 WT3 WF1 GYP Cl 105 RR F3 W61 WT3 WF1 WT3 WF1 WT3 WF1 WT3 WF1 GYP Cl 106 LOCKER ROOM #2 F2 W61 WT3 WF1 WT3 WF1 WT3 WF1 WT3 WF1 GYP Cl 107 RR F5 W61 WT3 WF1 WT3 WF1 WT3 WF5 WT3 WF1 GYP Cl 108 LAV F5 W61 WT3 WF1 WT3 WF1 WT3 WF5 WT3 WF1 GYP Cl 109 GARAGE F6 W64 WT2 WF1 WT2 WF1 WT2 WF1 WT2 WF1 GYP Cl 110 STORAGE F6 W64 WT2 WF1 WT2 WF1 WT2 WF1 WT2 WF1 GYP Cl 111 HOCKEY RINK F2, F6 W64 WT2 WF1 WT2 WF1, WF6 WT2 WF1 WT2 WF1, WF6 WOOD C3, C4 112 MECH. ROOM F6 W64 WT2 WF1 WT2 WF1 WT2 WF1 WT2 WF1 GYP Cl w Z � Q (If Z Q F W o C) z W J W w w fir- U DISCLAIMER: This is an original design, created by KJG Architecture, Inc. The concepts, ideas, plans and details are the sole property of KJG Architecture, Inc. None of the aforementioned shall be used by or disclosed to any person, firm or organization for any purpose without the prior written permission of KJG Architecture, Inc. PROFESSIONAL SEAL: PROJECT DATE: 09/14/2018 No. DESCRIPTION: DRAWN DATE BY: ISSUED: PROJECT NUMBER: DRAWN BY: A2018.078 DRAWING TITLE: ROOM FINISH SCHEDULE SHEET NUMBER: A61 0 vvuudni nunu