HomeMy WebLinkAboutScope of work8846 (317) East 898-33rd 9002 Street
Indianapolis, christiancarmin@IN. 46226 holtconstruction.com Fax: (317) 898-Cell: 9085 (317) 281-5332
Date: Providence 7/10/at 2018 Old Meridian Quote# 5652
300 Carmel, RE: Dear will Aminities Thank find Providence Shane: IN pricing 46032 you Center for Boulevard and the specifications opportunity Remodel to to complete submit the the following
work. Holt proposal Construction on aminity Group center will remodel not be responsible as we discussed. for any Below unforeseen you
damages; please JOB - - - All Any Demo SPECIFICATIONS work task feel all any and not free finishes and listed repairs to call. all as on unforeseen per will plans plans. be that done
damages is as completed per the will provided be could repaired be plans subject at an and additional to specifications. additional cost. costs. If you should have any questions or concerns
- - - Demo Frame Install and glass in new remove panels, walls walls film at yoga and at yoga room. trim room. at yoga room.
- - - All Install Minimal debris new drywall will drywall be repairs hauled at all throughout from newly site framed in to HCG prep walls. provided for paint. dumpsters.
- - - Slick Spot Apply prime out (2) walls coats all bare at of Coffee interior materials. Lounge latex paint to prep on for all paint.previously painted wall surfaces and trims.
- - - Apply Sand Apply all ((2) 1) clear coats coat coated of of clear paint base. to to all all stained ceilings. base.
- - - Install Install Demo electrical plumbing plumbing and rough rough lighting ins ins at at as Coffee Dog required. Wash. Lounge.
- - - Cut Install Patch concrete concrete. floor outlets. for new floor outlets.
- - - Install Outlet Provide and Data all switches lighting and telephone package per drawings. lines. (submittals will need to be signed off on by management).
- - - Pricing Price Price as does assume given not does include all work not any include will moving be any done or HVAC during relocating repairs, normal of work workout working or
cleaning. equipment. hours.
- - - Provide State Provide release local and install or building engineering new permit door fees at and room is coordinate not off included of entry. all necessary in this proposal.
inspections.
- - - Install Install Install new appliances dog wash, double vacuum and door water and and hardware fountain dryer. per per plan. plan.
- Manufacture and install Fitness Cubby
- - - Final Prep Replace and clean flooring paint all rooms Leasing in leasing and office construction office as per as per separate areas SOW. upon SOW. completion of repairs
- Wall installation at managers office will be listed out as a separate value below.
Deduction - - - Mohawk Shaw Mohawk Builder Reconstruct Group Alternates Downtown Hot and (vs to Heavy interface be USA deducted vs vs Shaw Mannington Urban Contract from Reterat pricing
Uptown Tilt - Deduct - below) Deduct Manor $5,200 $3,Oak 050 - Deduct $12,000
Item 1 1 Quantity Item Materials Materials Description and and Labor Labor - - Per Manager SOW Office Wall Item $318,$Price 4,100.900.00 00 Total Item $Total 318,$$4,323,900.100.000.00
00 00
Valid for 90 days
Approved _____________________________________________ Date ________________________
If you agree with this proposal please sign, date, and email or fax to me at (317)898-9085.
Purchase Order# ___________________
Thank Holt Construction you, Group
Christian Vice President Carmin