CARMEL ZONING ORDINANCE Z-160, SECTION 29.4.2(3): THE BUILDING COMMISSIONER (DIRECTOR,
DEPT. OF COMMUNITY DEVELOPMENT OR STAFF) SHALL APPROVE OR DENY THE IMPROVEMENT LOCATION
PERMIT (BUILDING PERMIT) WITHIN FIVE (S) WORKING DAYS OF THE RECEIPT OF THE WRITTEN
APPLICATION FORM AND ACCOMPANYING MATERIALS. THE IMPROVEMENT LOCATION PERMIT (BUILDING
PERMIT) SHALL BE ISSUED WHEN THE PROPOSED STRUCTURE, IMPROVEMENT OR USE AND ITS LOCATION
CONFORM IN ALL RESPECTS TO THIS ORDINANCE.
The following must be received by the Department of Community Development before any
building; or remodeling permit can be reviewed or issued by the staff:
1. A completed Improvement Location Permit application.
2. Two (2) complete sets of construction plans. In compliance with the State Energy
Code, must list R -values on walls, ceilings, etc. If a commercial construction,
plans must be stamped approved by the Indiana State Department of Fire
Prevention and Building Safety.
3. A copy of sewer permit (from City of Carmel Engineering Dept. or Hamilton
Western Utilities, whichever applies) or septic permit (Hamilton County Health
Department).
4. Three (3) copies of a site or plot plan showing the following REQUIRED
information (can be obtained from the landowner or land developer):
- Lot drawn to scale
All dimensions
Scale and North arrow
All roads, alleys, right-of-ways, etc.
All other utilities and drainage right-of-ways and -easements
Any applicable flood plain area
Building pad elevation and lot corner elevations
All accessory buildings -- existing; or proposed
All sidewalks and driveways
Sewer and water lines, septic system and well location
Drainage flow arrows
All drainage swales and subsurface facilities (retention/detention areas, et
Dimensional cross sections of all drainage swales
Sump pump (swap pump pits) showing discharge locations
Ceothermal heat pump discharge locations
Drainage Swales: All required drainage swales must be shown on the plot plan
and constructed in all subdivisions prior to the Department of Community
Development -performing a final inspection of any structure per plans on file
or per the.following: Constructed swales shall be a minimum of 1'6" deep
with side slopes of not less than 4 to 1.
If this information is not submitted, it will extend the time it takes to get an.approved
building permit.
I CERTIFY THAT ALL OF HE ABOVE LISTED INFORMATION 1S SHOWN COMPLETELY AND ACCURATELY
ON THE ATTACHED PLOT R SITE PLAN AS SUBMITTED WITH A BUILDING PERMIT APPLICATION TO THE
CARMEL/CLAY DEPARTS NT OF C MMUNITY DEVELOPM� T.
SIGNATU y�'� PHONE:Zz
�[/r��/
ADDRESS: _�' — -- � i�/�(At -2:1I' 7-- Z�
NAME OF'PLUMBING CONTRACTOR: (If Annlicable) 129��r I01F
VALID STATE PLUMBING LICENSE NUMBER: