Loading...
HomeMy WebLinkAbout235JGB - Truss Placement GuideDropped beam (by others)8-00-00 TOP8-00-00 TOP8-00-00 TOP8-00-00 TOP10-01-02 TOP10-01-02 TOPStick frame eyebrow roofStick frame falsedormers atop roof deckStick frameladderframeHTU26HTU26HTU26HTU26HTU26HTU26HGUS26-2HGUS26-2HTU26HGUS26-2HTU26HTU26HTU26HTU26HGUS26-22x4 ledgerMUS26TG01T01TG02TG02T04TG03TG04TG05T06T07MG01MG02GE01GE02T10GE03T11T12T13GE04T14J03TG06T15T16C G 0 1M03J01 J02TG07T17T18T19T20T21CG02C G 0 3 J06J05J07J04GE05GE06GE07V01V02V03V04V05V06V07V08V09V10V11V12V13V14V15V16V17V18V19V20V21V22V23V24PB02PB03PB04PB05PB07PB08PB10PB11PBE01T02(5)T03(4)T05(3)M01(3)T08(3)T09(3)M02(16)T22(3)M04(10)T23(5)PB01(4)PB06(2)PB09(2)PB12(2)PB07(6)12-07-006-09-0013-00-0021-07-0021-11-0051-04-0012-00-0020-08-0015-11-0016-00-0012-00-0050-03-0023-00-0053-11-0085-03-0012-00-007-11-001-08-0017-00-004-00-005-08-007-04-0024-02-0819-02-08IRC 2003TPI 200220TLL -10TDL -10BDLWedgewood Building CompanyWilson Residence235 Bridgemont at Jackson's Grant1/4"=1'October 15, 2018PHB18803013CUSTOMER:LOCATION:MODEL:JOB #:DATE:DESIGNER: DESIGN INFORMATION:SCALE:9028 Old SR 67 SouthMooresville, IN 46158(317) 834-5380Truss Placement Guide1) This layout is intended for the purpose of truss locationand placement only. Refer to the building plans for actualbuilding construction.2) All dimensions shown 00-00-00 are in feet-inches-sixteenths.3) Trusses are spaced 24" on center unless otherwise noted.4) Do not cut or modify trusses.5) Refer to the individual truss design drawings for the locationof member bracing, uplift and truss end reactions.6) Installation of all temporary and permanent bracing isessential. See truss drawings, BCSI-B2 Summary Sheetand building designer requirements.7) Non-bearing walls may not be shown on layout.Left end of truss, as shown on engineeringdrawing, is indicated by the triangle symbol