Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S101 - 29JGB
1ST FLOOR ROUGH FRAMING NOTES: 1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL 2. JAMBS TO BE 4.5"W UNLESS NOTED OTHERWISE 224DH2040 244DH3060 244DH2850 244DH2860 2020FX 2020FX 2020FX244DH3060 5060P 244DH3060244DH2860 244DH2860 244DH2860 244DH2860 5060P 244DH2860 2-2068 2/6 (2)2/4 2/8 (2)2/42/82/8 2/6 2/82/82-2068DUCT CHASE 9'-1 1/8" O.H. CEILING 5/0 X 8/0 CO2/8 X 8/0 CO10'-1 1/8" CEILING42" F.P. 14" SL 3/0X6/8 14"SLBEDROOM #2 BATH #2 LAUNDRY MASTER BATH W.I.C. MASTER BEDROOM OWNER'S ENTRY 2 CAR GARAGE 1 CAR GARAGE LANAI FOYER COVERED PORCH DINING KITCHEN GREAT ROOM 9'-1 1/8" H. 10'-1 1/8" H. 10'-1 1/8" CEILING9'-6"H. CEILING2X6 WALL DOWN 16R 15T @10" R.C. 8'-0" H. WALL ABOVE MAIN LEVEL FF 8'-0" H. WALL ABOVE MAIN LEVEL FF LINE OF DROPPED TRAY CEILING TOILET C.L.ISPD31802/82/4DINING BUTLER'S PANTRY PANTRY 2/8 X 8/0 CO 2/8 X 8/0 CO RECESSED NICHE SILL AT 3'-6". HEADER AT 7'-0" ABOVE F.F.E.11'-1 1/8" CEILINGHB 20' - 11" 15' - 9" 15' - 11" 3' - 7 3/4" 10' - 3 3/4" 14' - 10" 7' - 10 1/2" 7' - 10" 8' - 1 1/8" 53' - 11" 4 1/2" 4 1/2"3' - 7 1/2" 2' - 4 1/2"6' - 0"6' - 0"51' - 4"21' - 11" 10' - 11 1/2" 10' - 11 1/2" 8' - 2" 22' - 9" 20' - 5" 7' - 9 1/2"23' - 0" 50' - 3"10' - 3 1/2" 12' - 8 1/2" 29' - 10" 6' - 0" 5' - 4" 3' - 4" 3' - 4" 2' - 5"73' - 3"21' - 7" 13' - 0" 6' - 9" 12' - 7" 10' - 9 1/2" 17' - 1" 10' - 1" 9' - 7 1/2" 6' - 4" 53' - 11" 1' - 4" 12' - 11 1/2" 10"10"14' - 9 3/4" 10" 6' - 8 1/2" 3 1/2"2' - 0" 9' - 4" 2' - 0" 3 1/2" 16' - 0 1/2" 15' - 4"21' - 4"3 1/2"12' - 3"3 1/2"5' - 0"10 1/2"3 1/2"3' - 2 3/4" 3' - 9 1/4" 10' - 9"3 1/2"3 1/2" 14' - 0"3 1/2" 3' - 7"3 1/2"2' - 0" 5 1/2"6' - 9" 2' - 1" 3 1/2" 4' - 0 1/2" 2' - 0" 15' - 0 1/8" 2' - 0"6' - 8 1/2"3 1/2"3' - 1" 3 1/2" 5' - 1 1/2" 3 1/2" 3' - 10" 3' - 0"16' - 7" 9 1/2" 6' - 5" 5' - 7" 17' - 0" 4' - 0" 21' - 0"3' - 4" 5' - 4"3 1/2"3' - 7" 3 1/2" 3' - 7" 7' - 3" 8' - 1"3 1/2"TOILET C.L. 5' - 4" 14' - 0"3 1/2"8 1/2" 3' - 8 1/2" 4' - 4 1/2" 7" 3' - 0" 6' - 8 1/2" 3' - 0"3 1/2"3' - 4 1/2" 5' - 1 1/2" 3 1/2" 3' - 11" 2' - 11" 10' - 0 1/2"9 1/2" 5' - 9" 6"DN 36" H WALL OPEN RAIL 13' - 10 1/2" 9 1/2" 4' - 0" 9 1/2" 16' - 10 1/2" 6' - 0"2' - 1" 3 1/2" 4' - 4"14' - 0" 3 1/2" 5' - 4"3 1/2"2' - 2 1/2"1' - 9 1/2" 3 1/2"2' - 7" 22' - 10 1/2"10' - 5 1/2" 3' - 6 1/2"12' - 8" 3 1/2" 6' - 9" 3 1/2" 12' - 0"1' - 0"11' - 10" 1' - 0"1' - 0" 4' - 9"1' - 0" R.O. 48" W x 39 3/4" H ON 5 1/2" TALL PLATFORM 5' - 8"6' - 1 1/2" 3 1/2" 5' - 7" 1' - 4" TOILET C.L.25' - 1 1/2"5' - 2 1/2" 3 1/2"4' - 9" 29' - 4 1/2" 12' - 4" 7' - 1 1/2" 1' - 9 1/2" 4' - 4" 13' - 0" 3 1/2" 6' - 5"8' - 4 1/2"2' - 0" 13' - 4"19' - 0"3' - 6"1' - 3" 5' - 5 1/2"8' - 10"8' - 6" 2' - 11" 6' - 6" 6' - 1" ZERO THRESHOLD SHOWER 7' - 4" 9'-1 1/8" O.H. CEILING 9'-1 1/8" O.H. CEILING 3' - 0" 2' - 0" 4' - 8 1/2"EQEQ 6' - 9"8' - 6 1/2"7 1/2" 7 1/2" 3' - 3 3/4" 3' - 3 3/4" 7 1/2" 10" WIDE BOX BEAM 5812FX18" H. WALL 1' - 4" CATHEDRAL CEILING 1X2 BATTENS AT BEAD BD. SEAMS. EQUALLY SPACED 36" H. WALL 9/0-7/0 O.H.D.16/0-7/0 O.H.D.7 1/2" 6' - 8 1/4" PROVIDE 2X12 WOOD BLOCKING IN WALLS FOR FUTURE GRAB BARS @ 30" A.F.F. TO CENTER PROVIDE VERTICAL BLOCKING FOR FUTURE GRAB BAR POWDER 244DH2850 244DH2850 244DH2860 244DH2860 2040FX 2040FX 4 1/2" 3 3/4" 4 1/2" 4 1/2"24' - 8"6' - 0"10' - 2 1/2" KNEE WALL ON TOP OF BOX BEAM FOR RAFTER BEARING73' - 3"5 1/2"19' - 4"1/89' - 1 1/2" 1' - 6 1/2" 10'-1 1/8" CEILING11'-1 1/8" CEILING244DH28606'-6" H. BULKEAD 3' - 4" 3' - 1"7 1/2"BLOCKING IN WALL FOR FUTURE GRAB BAR 1 1 244DH28504 1/2"4 1/2" 4 1/2"4 1/2" 2 2 2 4 1/2" 4 1/2" 2 2 EQ EQCUSTOMER: PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:Wedgewood Building Co., LLC 317.669.6300 32 First Street NE Carmel, IN 46032 www.wedgewoodbc.com Copyright c 2015 Wedgewood Building Co. LLC. 11/19/2018 2:14:26 PM A6 The Cohen Residence The Garfield 522 Dylan Drive, Carmel, IN 460321ST FLOOR ROUGH FRAMING ABL 1/4" = 1'-0"1 1ST FLOOR ROUGH FRAME PLAN Rev.No. Date Description1 11/13/18 PLAN NOTE REV'S2 11/19/18 ARB REVISIONSBy Andrew Lund at 2:15 pm, Nov 19, 2018 11/21/18 Mike Sheeks