Loading...
HomeMy WebLinkAbout0002.02 Sewer/Water Permit/sSEWER PERMIT / RECEIPT CITY OF CARMEL Issue Date; Dec 13, 2001 Received from: DREES PREMIER HOMES The SUM of : Two Thousand One Hundred Five On Account of: Lot: 165 Subdivision : LAKES AT HAZEL DELL, THE ................... Street address : 6004 PEBBLESTREAM DR Sewer Notes RECEIPT No: S0515.01 Permit No.: 2001.0515.SW Permit Issue Date: Dec 13, 2001 APPLICATION IS HEREBY MADE FOR PERMISSION TO CONNECT THE Bl ILDING AT ADDRESS LISTED ABOVE: Water Connection #609 $ 1,310.00 Excavator : HELLYER EXCAVATION - -. ........... Water Availability #610 PO Box: — - - -- — Sewer Inspection #651 $ 20.00 Street Address : 8500 KEYSTONE XING STE 160 _... _..... _.. _ City, State, Zip : INDIANAPOLIS IN 46240 Sewer Connection #659 $775.00 Bond ExI rey : May 05, 2002 Sewer Availability #660 Q Total $ $2,105.00 Total Paid $ $ 2,105.00 Authoriz Signature Receipt Issued By: JB Payment Type: Check # 32509 The building sewer shall be pvc sewer pipe meeting ASTM specifications 3034 SDR 35 of latest revision; or vitrified clay pipe, meeting ASTM specifications C-700 for extra strength clay pipe of latest revision unless other materials are hereby permitted in writing. The sewer shall be installed in accordance with ASTM C-12 for extra strength clay pipe and ASTM 2321 for pvc pipe and the Uniform Plumbing Code for the State of Indiana. All installations shall be in strict compliance with pertinent City of Carmel ordinances. All building sewers shall be 6" diameter. All installations shall be "open trench" inspected and approved by the Carmel Sewer Department before any backfilling Is one. on -compliance may result in digging up the sewer installation and/or denial of future sewer permits and/or denial of water connections. No footing or foundation drains or other sources of ground water or storm water shall be permitted to enter the public sewer. Sewer inspections should be requested at (317) 571-2648 one to four hours in advance. No inspections or installations will be made on Saturday or Sunday or holidays unless arrangements are made at least 24 hours in advance. All plumbers or contractors installing sewer (or water) lines shall have a plumbers bond posted with the CITY ENGINEER'S OFFICE. If any street must be cut, a separate street cut permit shall be obtained. I have read the condi 'ons to which I must adhere, and agree to accept the responsibility for all work done under this permit. r Signed: Approved by State Board of Accounts for City of Carmel, 2001