HomeMy WebLinkAboutRieth Riley/Eng/CO #5/-172,023.87/96th and Keystone Parkway – Project #16-ENG-05City of Carmel Project 16 -ENG -05 96th Street and Keystone Parkway CHANGE ORDER # 05 l The purpose of this change order is to address changes to the proposed storm sewer brought about by Construction Changes 3 and 5. Additionally, a Field Change addressed proposed storm structures that were in conflict with existing IPL poles on the north side of 96th Street, east of Keystone Parkway. Work covered in this change order includes the following: The Box Culvert structures, STR 810A and STR 811, were redesigned to avoid utilities. The box culvert structure was moved under the westbound lanes of 96th Street which required several revisions to the original design of the structure. The cost impacts of this redesign are summarized in a letter from Rinker Materials which is included with this change order. The box culvert redesign also resulted in a revision to the pay quantity for the 7'x4' and 8'x4' structures. The relocation of the box culvert resulted in the elimination of (4) proposed junction box structures. Vault STR 814 was a complex structure that required the Contractor to solicit an engineering design. Rieth-Riley has requested compensation for the design of this eliminated structure. Construction Changes 3 and 5 altered a number of drainage structures. A summary of these changes is included with this change order. New Pay Items are needed for Manhole, N4; Manhole, M7; and Manhole, K4, Modified. Due to the existing IPL poles along the north side of 96th Street, a number of manholes could not be placed in their proposed locations. A Field Change was proposed, and with the designer's approval, seven C-4 Manholes and one J-4 Manhole were eliminated on north side of 96th Street. The corresponding curb inlets were connected with a trunk line beneath the curb and gutter. This required new holes to be cored into each inlet and that additional cost is included in this change order. Several manholes had already been cast by the manufacturer, so there is an additional cost to dispose of these manholes. The documentation of the time and materials required for all of these changes is provided. A contract time adjustment may be required but will be discussed at a later date. Contract Price prior to this Change Order ................. Contract Price will be increase ecrease by this Change Order New Contract Price including this Change Order ------------------- $28,869,321.79 ----- ($172,023.87) $28,697,297.92 Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $28,793,000.00 $28,793,000.00 N/A CO 01 $25,843.67 $28,818,843.67 0.09% CO 02 $3,481.80 $28,822,325.47 0.10% CO 03 $0.00 $28,822,325.47 0.10% CO 04 $46,996.32 $28,869,321.79 0.26% CO 05 ($172,023.87) $28,697.297.92 -0.33% TO: CITY OF CARMEL CONTRACT CHANGE ORDER NO. DATE: 10/24/2018 PROJECT NAME: 16 -ENG -05 CITY REQ. NO.: CITY PO NO.: CITY PO DATE: I. You are directed to make the following changes in this Contract: The purpose of this change order is to address changes to the proposed storm sewer brought about by Construction Changes 3 and 5. Additionally, a Field Change addressed proposed storm structures that were in conflict with existing IPL poles on the north side of 96th Street, east of Keystone Parkway. Work covered in this change order includes the following: The Box Culvert structures, STR 810A and STR 811, were redesigned to avoid utilities. The box culvert structure was moved under the westbound lanes of 96th Street which required several revisions to the original design of the structure. The cost impacts of this redesign are summarized in a letter from Rinker Materials which is included with this change order. The box culvert redesign also resulted in a revision to the pay quantity for the 7'x4' and 8'x4' structures. The relocation of the box culvert resulted in the elimination of (4) proposed junction box structures. Vault STR 814 was a complex structure that required the Contractor to solicit an engineering design. Rieth-Riley has requested compensation for the design of this eliminated structure. Construction Changes 3 and 5 altered a number of drainage structures. A summary of these changes is included with this change order. New Pay Items are needed for Manhole, N4; Manhole, M7; and Manhole, K4, Modified. Due to the existing IPL poles along the north side of 96th Street, a number of manholes could not be placed in their proposed locations. A Field Change was proposed, and with the designer's approval, seven C-4 Manholes and one J-4 Manhole were eliminated on north side of 96th Street. The corresponding curb inlets were connected with a trunk line beneath the curb and gutter. This required new holes to be cored into each inlet and that additional cost is included in this change order. Several manholes had already been cast by the manufacturer, so there is an additional cost to dispose of these manholes. The documentation of the time and materials required for all of these changes is provided. A contract time adjustment may be required but will be discussed at a later date. ITEM AMOUNT 35 ($136,050.00) 137 $26,465.00 138 $4,500.00 139 ($119,024.16) 144 $975.00 145 ($5,124.00) 146 ($1,610.00) 148 $1,280.00 167 ($5,100.00) 172 ($1,700.00) 173 ($5,000.00) 175 ($6,500.00) 176 $5,700.00 178 $10,000.00 179 ($3,800.00) 181 ($4,000.00) 184 ($23,800.00) 186 $6,500.00 Version 2016-08-31 AR -6 SCHEDULED ADJUSTMENT (+) OR (-) DAYS 187 ts1.700.00) 188 64.500.00) 1889 t'_,?�)U.c►t11 190 191 $3,000.00 192 53,600.00 193 $1,800.00 331 $39,663.40 332 $8,000.00 333 $6,500.00 334 S10,432.67 335 $16,675.82 336 $9,792.40 H. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R -'.P.: W.D.C. No.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 28,869,321.79 Contract Price will be increased/decreased by this Change Order S 11 %?.()? ;,887) New Contract Price including this Change Order S 28,697,297.92 Contract Time Prior to this Change Order Days 5131/2019 Completion Date Net increased/decreased resulting from this Change Or& 0 Days Current Contract Time including this Change Ord Days 5/31/2019 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extension; incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Ap roved: Recommended Accepted: American Structurepoint Inc. Rieth-Riley Construction Co, Inc � /�5 e� ENGINEER CONTRACTORJ rain, t`tji, Mayr 7260 Sbadeland Station Indianapolis, IN 466221✓� Address Address Vn;�rA rznckey- nto-ekl,>,- Lodi W son, ?Member Indianapolis, FN 4626 Indianapolis, IN 46221 City/State/Zip City/Statc/Zip J my I m< , PE, City By: _ Phone: (3 r7) 401-0263 Date: Treasurer Date: 1 Z 110 Date: Version 3o 16JU-31 AR -6 ■m o American Structurepoint, Inc. EN $TRUCTUREPOINT p Change Order Details 96th Street and Keystone Parkway Description: 16 -ENG -05 Construction of a roundabout interchange at the intersection of 96th Street and Keystone Parkway, including the reconstruction of Keystone Parkway from I-465 to 98th Street, and reconstruction of 96th Street from Haverstick Road to Enterprise Drive. The Project includes new construction of a twospan bridge over 96th Street. Change Order: 5 Date Created: 10/19/2018 Status: Pending Approval Date Approved: Type: Changed Conditions Summary: Storm Drainage Revisions Change Order Description: The purpose of this change order is to address changes to the proposed storm sewer brought about by Construction Changes 3 and 5. Additionally, a Field Change addressed proposed storm structures that were in conflict with existing IPL poles on the north side of 96th Street, east of Keystone Parkway. Work covered in this change order includes the following: The Box Culvert structures, STR 810A and STR 811, were redesigned to avoid utilities. The box culvert structure was moved under the westbound lanes of 96th Street which required several revisions to the original design of the structure. The cost impacts of this redesign are summarized in a letter from Rinker Materials which is included with this change order. The box culvert redesign also resulted in a revision to the pay quantity for the 7'x4' and 8'x4' structures. The relocation of the box culvert resulted in the elimination of (4) proposed junction box structures. Vault STR 814 was a complex structure that required the Contractor to solicit an engineering design. Rieth-Riley has requested compensation for the design of this eliminated structure. Construction Changes 3 and 5 altered a number of drainage structures. A summary of these changes is included with this change order. New Pay Items are needed for Manhole, N4; Manhole, M7; and Manhole, K4, Modified. Due to the existing IPL poles along the north side of 96th Street, a number of manholes could not be placed in their proposed locations. A Field Change was proposed, and with the designer's approval, seven C-4 Manholes and one J-4 Manhole were eliminated on north side of 96th Street. The corresponding curb inlets were connected with a trunk line beneath the curb and gutter. This required new holes to be cored into each inlet and that additional cost is included in this change order. Several manholes had already been cast by the manufacturer, so there is an additional cost to dispose of these manholes. The documentation of the time and materials required for all of these changes is provided. A contract time adjustment may be required but will be discussed at a later date. Awarded Project Amount: $28,793,000.00 Authorized Project Amount: $28,822,325.47 Change Order Details: 96th Street and Keystone Page 1 of 4 10/24/2018 Parkway Change Order Amount: -$172,023.87 Revised Project Amount: $28,650,301.60 Increases/Decreases Line Number Item Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount Section: 1 - 801-08400 0350 35 CYS $75.000 3,709.00 $278,175.00 -1,814.00 -$136,050.00 1,895.00 $142,125.00 STRUCTURE BACKFILL, TYPE 5 Reason: Balancing Change Order 1370 137 LFT $395.000 645.00 $254,775.00 STRUCTURE, REINFORCED CONCRETE, BOX SECTIONS, 8 FT. X 4 FT. Reason: Balancing Change Order 1380 138 LFT $375.000 424.00 $159,000.00 STRUCTURE, REINFORCED CONCRETE, BOX SECTIONS, 7 FT. X 4 FT. Reason: Balancing Change Order 1390 139 EACH $29,756.040 5.00 $148,780.20 VAULT, REINFORCED BOX JUNCTION Reason: Balancing Change Order 1440 144 LFT $39.000 3,757.00 $146,523.00 PIPE, TYPE 2, CIRCULAR, 12 IN. Reason: Balancing Change Order 67.00 $26,465.00 712.00 $281,240.00 12.00 $4,500.00 436.00 $163,500.00 -4.00 -$119,024.16 1.00 $29,756.04 25.00 $975.00 3,782.00 $147,498.00 1450 145 LFT $42.000 2,403.00 $100,926.00 -122.00 -$5,124.00 2,281.00 $95,802.00 PIPE, TYPE 2, CIRCULAR, 15 IN. Reason: Balancing Change Order 1460 146 LFT $46.000 2,894.00 $133,124.00 -35.00 -$1,610.00 2,859.00 $131,514.00 PIPE, TYPE 2, CIRCULAR, 18 IN. Reason: Balancing Change Order 1480 148 LFT $64.000 1,379.00 $88,256.00 20.00 $1,280.00 1,399.00 $89,536.00 PIPE, TYPE 2, CIRCULAR, 30 IN. Reason: Balancing Change Order 1670 167 EACH $1,700.000 16.00 $27,200.00 -3.00 -$5,100.00 13.00 $22,100.00 MANHOLE, C15 Reason: Balancing Change Order 1720 172 EACH $1,700.000 9.00 $15,300.00 -1.00 -$1,700.00 8.00 $13,600.00 MANHOLE, C5 Reason: Balancing Change Order 1730 173 EACH $5,000.000 5.00 $25,000.00 -1.00 -$5,000.00 4.00 $20,000.00 MANHOLE, K5 MODIFIED Reason: Balancing Change Order 1750 175 EACH $6,500.000 3.00 $19,500.00 -1.00 -$6,500.00 2.00 $13,000.00 MANHOLE, L7 Reason: Balancing Change Order Change Order Details: 96th Street and Keystone Page 2 of 4 10/24/2018 Parkway 13ne Number Item Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount 1760 176 EACH $1,900.000 11.00 $20,900.00 3.00 $5,700.00 14.00 $26,600.00 INLET, E7 Reason: Balancing Change Order 1780 178 EACH $2,000.000 31.00 $62,000.00 5.00 $10,000.00 36.00 $72,000.00 INLET, HA5 Reason: Balancing Change Order 1790 179 EACH $1,900.000 3.00 $5,700.00 -2.00 -$3,800.00 1.00 $1,900.00 INLET, J10 Reason: Balancing Change Order 1810 181 EACH $2,000.000 3.00 $6,000.00 -2.00 -$4,000.00 1.00 $2,000.00 INLET, R13 Reason: Balancing Change Order 1840 184 EACH $1,700.000 43.00 $73,100.00 -14.00 -$23,800.00 29.00 $49,300.00 MANHOLE, C4 Reason: Balancing Change Order 1860 186 EACH $6,500.000 1.00 $6,500.00 1.00 $6,500.00 2.00 $13,000.00 MANHOLE, L4 Reason: Balancing Change Order 1870 187 EACH $1,700.000 7.00 $11,900.00 -1.00 -$1,700.00 6.00 $10,200.00 MANHOLE, C7 Reason: Balancing Change Order 1880 188 EACH $4,500.000 7.00 $31,500.00 -1.00 -$4,500.00 6.00 $27,000.00 MANHOLE, K4 Reason: Balancing Change Order 1890 189 EACH $2,500.000 2.00 $5,000.00 -1.00 -$2,500.00 1.00 $2,500.00 CATCH BASIN, R13, MODIFIED Reason: Balancing Change Order 1900 190 EACH $6,500.000 1.00 $6,500.00 -1.00 -$6,500.00 0.00 $0.00 MANHOLE, M4 Reason: Balancing Change Order 1910 191 EACH $3,000.000 17.00 $51,000.00 1.00 $3,000.00 18.00 $54,000.00 MANHOLE, J4 Reason: Balancing Change Order 1920 192 EACH $1,800.000 8.00 $14,400.00 2.00 $3,600.00 10.00 $18,000.00 INLET, B15 Reason: Balancing Change Order 1930 193 EACH $1,800.000 6.00 $10,800.00 1.00 $1,800.00 7.00 $12,600.00 INLET, C15 Reason: Balancing Change Order (25 Items) Totals $1,701,859.20 -$263,088.16 $1,438,771.04 Change Order Details: 96th Street and Keystone Page 3 of 4 10/24/2018 Parkway New Items Line Number Item Unit Pending Quantity Unit Price Dollar Amount Section: 1 - 801-08400 3310 714-11086 LFT 1.148.00 $34.550 $39,663.40 STRUCTURE REINFORCED CONCRETE BOX SECTIONS, Reason: Added Cost 3320 712.04784 EACH 1.00 $8,000.000 $8,000.00 STRUCTURE Reason: Fault Structure 814, Design Cost 3330 720-91110 EACH 1.00 $6,500.000 X6,600.013 tiL N -HOLE, N4 3340 720-03194 EACH 1.00 510.432.670 $10,432.67 1vVkNHOLE Reason:, M7 3350 720-92884 EACH 2.00 $3,337.910 S16,675.82 MANHOLE, K4, MODIFIED 3360 109-04299 DOL 1.00 $9.792.400 $9,792.40 FORCE ACCOUNIT WORK Reason: T&M Storm Structure Modifications and Disposal Due to IPL Pole Conflicts (6 Items) Total: +$91,064.29 Recommended for Processing: Resident Project Representative Date Confr�ctor Owner Date Date Change Order Details: 36th Street and Keystone Page 4 of 4 10/24/2018 Parkway 336 T&M Storm Structure Modifications & Disposal $9,792.40 1 DOL $9,792.40 184 MANHOLE, C4 $1,700.00L 7 EACH (11,900.00) 191 MANHOLE, J4 $3,000.00 I -1 EACH (3,000.00) Total cost for Change Order No. 5 = (172,023.87) Change Order No.5 -- Storm Drainage Revisions Item No. Description Unit Price Quantity Unit Extension 35 STRUCTURE BACKFILL, TYPE 5 $75.00 -1814 CYS 1 (136,050.00) 137 STRUCTURE, REINFORCED CONCRETE, BOX SECTIONS, 8 FT. X 4 FT. $395.00 67 LFT 6,465.00 138 STRUCTURE, REINFORCED CONCRETE, BOX SECTIONS, 7 FT. X 4 FT. $375.00 ! 12 LFT 4,500.00_ 139 VAULT, REINFORCED BOX JUNCTION $29,756.041 -4 EACH 119,024.16)_144 144 PIPE, TYPE 2, CIRCULAR, 12 IN. $39.00 25 .--(119,024.16),- LFT 975.00 145 PIPE, TYPE 2, CIRCULAR, 15 IN. $42.00 -122 LFT 5,124.00) 146 PIPE, TYPE 2, CIRCULAR, 18 IN. $46.00 -35 LFT (1,610.00) 148 PIPE, TYPE 2, CIRCULAR, 30 IN. $64.00 20 LFT 1,280.00 167 MANHOLE, C15 $1,700.00 1 -3 EACH (5,100.00) 172 MANHOLE, CS $1,700.00 -1 EACH (1,700.00) 173 MANHOLE, K5 MODIFIED $5,000.00 -1 EACH (5,000.00) 175 MANHOLE, L7 $6,500.00 -1 EACH. (6,500.00) 176 INLET, E7 $1,900.00 3 EACH Y 5,700.00 178 INLET, HAS $2,000.00 j 5 EACH — 10,000.00 179 INLET, J10 $1,900.00 -2 EACH _ (3,800.00) 181 INLET, R13 $2,000.00 j 2 EACH (4,000.00) 184 MANHOLE, C4 $1,700.00 -7 EACH (11,900.00)_ 186 MANHOLE, L4 $6,500.00 1 EACH 6,500.00 187 MANHOLE, C7 _ $1,700.001 EACH (1,700.00) 188 189 MANHOLE, K4 CATCH BASIN, R13, MODIFIED Y $4,500.00 $2,500.00.1 -1 -1 EACH (4,500.00) EACH (2,500.00) 190 MANHOLE, M4 $6,500.00 -1 EACH ; (6,500.00) 191 MANHOLE, J4 $3,000.00 2 EACH1 6 0 192 INLET, B15 $1,800.00 2 EACH�3,600.00 193 INLET, C15 $1,800.00 1 EACH 1,800.00 331 Structure, Reinf. Conc., Box Sections - Added Cost $34.55 1148.00. LFT $39,663.40 332 Structure 814, Design Cost $8,000.00 1 LS $8,000.00 333 Manhole, N4 $6,500.00 1 EA $6,500.00 334 --------------- --- Manhole, M7 $10,432.67 1 EA $10,432.67 335 Manhole, K4, Modified $8,337.91 2 EA $16,675.82 336 T&M Storm Structure Modifications & Disposal $9,792.40 1 DOL $9,792.40 184 MANHOLE, C4 $1,700.00L 7 EACH (11,900.00) 191 MANHOLE, J4 $3,000.00 I -1 EACH (3,000.00) Total cost for Change Order No. 5 = (172,023.87) I �HIL;Y CONSTRUCTION CO., INC, 100% Quality • 100% Employee Owned • Over 100 Years April 26"', 2018 Tim Conarroe Area Supervisor, Construction Solutions American Structurepoint Inc. 7260 Shadeland Station Indianapolis, IN 46256 Sent Via Email: TConarroe@structurepoint.com RE: 96`fi and Keystone Box Culvert Redesign Price Increase Proposal T'i m, The following documentation is for the redesign price increase on the Box Culvert material. The quantities that are used in the Rieth-Riley CO spreadsheet (attached) are approximate and based on Rinker's Shop Dravvings. Listed below is the price increases for each item: • 8' x 4' Box Sections, Price Increase @ 712' = $23,897.50✓ • 7' x 4' Box Sections, Price Increase @ 436' = $15,769.74 .✓ If you have any questions regarding the material price increases please let me know. Thanks, �eerJoseph Project Manager Rieth-Riley Construction Co., Inc. Cell: (419)-966-4890 P.O. Box 276 • 7751 A. Minnesota St. - indianapolis, iN 46206 �R Phone: (317) 634-5561 • www.rieth-riley.com RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 4.126/18 Work Performed: 8' x 4' Box Culvert Redes CONTRACT: 16 -ENG -05 PROJECT: 96th and Keystone Ave. FORCE ACCOUNT/EXTRA WORK FOR- The attatched is for the redesign price increase on the new 8' x box culvert. The pricing is for material only. LABOR 109-05 (b)(1) wn, ioa EMPLOYEE Regular 0-,wtme Coubletime TOTAL FIATS EXTENSION CARPEN' `R 1 0.00 $27.51 $0.00 CARPENTER FOREMAN 1 0.00 $29.01 $0.00 COMBINATION 0.00 $30.51 $0.00 FINISHER 0,00 $26,22 $0.00 FOREMAN 0.00 $35.80 $0.00 LABORER 0.00 $25.22 $0.00 MECHANIC 0.00 $35.80 $0.00 OPERATOR (103) 1 0.00 $34.80 $0.00 OP=ERATOR (84 1) 0.00 533.25 $0.00 OPERATOR OILER (103) 0.00 j30.66 $0.00 OA TECH 0.00 $25.22 $0.00 SUPERINTENOENTjVROJECTMANAGER 0.00 544.80 $0.00 TEAMSTER 0.00 $28.41 $0.00 FR!fVGES TOTAL LABOR FICA 7.50 % x LINE (2) $0.00 (2) $0.00 (3) EMPLOYEE HOURS X UNE (2) RATE EXTENSION CARPENTER 0.00 x $22.32 = 50.00 CARPENTER FOREMAN 0.00 x $22.32 = $0.00 COMBINATION 0.00 x $15.16 = S0.00 FINISHER 0.00 I x $15.16 = $0.00 FOREMAN 7.00 x $18.41 = $0.00 LABORER O no x $15.161 = $0.00 `,t_CHANIC 000 x $18.411 $0.00 OPERATOR (103) 0.uo x $18.411 SO.00 OPERATOR (SA 1) 0.00 x $21.361 $0.00 OPERATOR 01--::R..(. 103) 0.00 x $17.66 = $0.00 OA T=ECH 000 x $15.18 = $0.00 SUP=RINTeNDE`ITIPROJECTtvIAN 000 1 x S18.411 50.00 TEAMSTER 0,110 x $14.91 = $0.00 TOTAL FRINGES $0.00 (4) WORKERS CCMP`ENSA T ION 5.72 , % X UNE (2) $0.00 (51 BODILY INJURY I PROPERTY DAMAGE INSURANCE 5.800. % X LINE (2) $0.00 (S) STATE UNEMPLOYMENT 3.85- % x LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 ; % x LINE 12) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3. 4. 5. 5. 7, 5 & 9 $0.00 (10) 20%xUNE (10) $0.00(11) GRAND TOTAL LABOR LINES (10) + (11) $0.00(12) Page 1 of 2 MATERIAL 109.05 (b)f81 - mased or Manu`aclureo Ceacnpann t?;,ardny Unit Urn Pnca 5 er"on 5 3 So ao I 5 i 3 5O.Co T +AL LINES (23) • ?24) + (251 •oB S0.00 S 13 MATEMALS PURCHASED MATERIALS MANUFACTURED $0.00 ilei $0.00 (19) TOTAL: LIVE (18) • (191 $0.70 (20) 2 % x LINE 1M) 50.00 (21) GRAND TOTAL FOR MATERIALS* LINE 120)-1Z1) $0.00 (22) EQUIPMENT 109.05 (bX4) Equ anarl a CONTRAC"OR OWNED EQUIPMENT FI-II^)A HCURLY RATE HOURS EXTENSION TOTAL TRUCKING So ao I 50.00 FUEL. LUBRICANTS AND TRANSPORTATION COSTS Moo 5O.Co T +AL LINES (23) • ?24) + (251 •oB S0.00 12%xUNE (26) x:_^0 50 CO GRAND TOTAL FOR EQUIPMENT: LINES (25)' (27) 30.ub 50.00 33.00 j 50.00 sir ,c $0.00 sc.oa $0.00 T-,ck<iq- Slnaghl Time 36.00 j 30.00 Thw mg-Over7me 30.00 So.00 Truckir+g - Double Time 10.00 TOTAL EQUIPMENT SO OD (23) TOTAL TRUCKING 0.00 (24) FUEL. LUBRICANTS AND TRANSPORTATION COSTS $0.00 (29) T +AL LINES (23) • ?24) + (251 $0 0 t26) 12%xUNE (26) S0.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (25)' (27) S0.00 (23) SUBCCNTRACTORS 109.05 (b)(b item TO -AL SUBCONTRACT WEEK ENDING $22,250.00 (29) 10 F x LINE I30I S3.o-30.00 OP. LESS $300.00 (31) % % x LINE (30) OVER $2.0.30.00 $1,347.50 (32) GRAND TOTAL FOR SUBCONTRACTORS. LINES i301 + (31) • a32) $23,897.70 133)-/ TOTAL OF WORK COMPLETED FDR THE ViEEK 'OTAL LINES •;12). (17),122-1. (28) 3:33) 323,897.50 (34) 0 ?i OF BOND RATE BASED UPON LINE (34) $0.00 (38) 10 % x LME (36) $0.00 (36) TOTAL EXTRA WORK LINES: (34) + (3.`) + (381 523,897.50 (37) Pacia 2 Oi 2 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE 4fMI18 Work Performed. T x 4' Box Culvert Redes CONTRACT: 16 -ENG -05 PROJECT: 96th and Keystone Ave. FORCE ACCOUNT; EXTRA WORK FOR: The attatched is for the redesign price increase on the new T x 4' box culvert. The pricing is for material only. LABOR 109.05 (b)(1) HOUR i^rLG�c= Replay _r. -re Doubladme TOTAL RATE EXTENSION CARPENTER 0.00 $27.51 $0.00 CARPENTER FOREMAN 0.00 $29,01 $0,00 COMBINATION 0.00 $30.51 30.00 MISHER 0.00 $26.22 $0.00 =OREMAN I I 0.00 1 $35.801 $0.00 LABORER j 0.00 $25.221 30.00 41Ect1aNlc 0.00 $35,80 S0,00 OPERATOR (103) 0.00 $34.80 50.00 OPERATOR (841) I 0.00 $33.25 50.00 OPERATOR OILER (I M) 0.00 $30.66 80.00 CIA TECH 0.00 $25.22 $0.00 SUPERINTENDENT.'PROJECT MANAGER {{ I 0.00 $44.80 $0.00 ITEAMS7ER 0.00 $28.411 $0.00 FRINGES TOTAL LABOR $0.00 (2) FICA 7.e0 i % x LINE (2) $0.00 (3) EMPLOYEE HOURS LINE (2) RATE EXTENSION CARPENTER 0.00 X ( $22.32 = $0.00 CARPENTER 'OREM�AN 0.00 X $22.32 = $0.00 COMBINATION 0.00 X $15.16 = $0.00 FINISHER 000 X $15.16 = $0.00 FOREMAN 0.00 x $18.41 = $0.00 LABORER 0.00 x $15.16 = $0.00 %IECHANIC 0.00 x $18.41 = $0.00 OP=ERATOR(103) 0.00 X $18.41 = $0.00 OPERATOR(841) 0.00 x $21.36 = $0.00 OPERATCR OILER (103) 0.00 X $17.66 = $0.00 QA TECH 0.00 X $i 5.16 = SUPERINTENDENTiPROJECT MA 0.00 x $18.41 = N EAMSTE:3 0.00 x $14.91 = TOTAL FRINGES 00 (4) WORKERS COMPENSATION 5,72 % X LINE (2) $0.00 (5) BODILY INJURY I PROPERTY DAMAGE INSURANCE 5.80 ° x LME (2) TS0.00 (6) STATE JNEMPLOYMENT 3:85 % X LINE (2) $0.00 (7) FEDERAL UNEI:IPLCYtdENT 0.40 % X LINE (2) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE �3) $0.00 (9) TOTAL LINES 2, 3,4.5.6. 7. 8 & 9 $0.00 (10) 20%xUNE (10) $0.00(11) GRAND TOTAL LABOR UNES (10)+(11) $0.00(12) Page 1 of 2 4i26i2013 MATERIAL 109.05 (b)(3) �:rcraseli x PASrpFCtl£d I 11d'> -'F==" Quantity Unit Lnit Price Euen$Uon $ S 5 s0.00 S S S 5 S 5 S S %LAT=_RIALS PURCHASED MATERIALS MANUFACTURED 30.00 t's) $0.00 i19) TOTAL: UNE 081-(19) $0.00 (20) 12 %x LINE (20) 50.00 121) DRANO TOTAL FOR MATERLALS LINE (20) + (2 1) 50.00 122) EQUIPMENT 109.051b)(44l ECuicment a -ONTRACTOR OWNED EOUIP6IENT FHWA HOURLY RAT= HOURS EXTENSION J s0.00 $000 SO. so.00 $0.00 $0.00 so.m $0.00 i Soon I $0.00 I $041 I I $0.00 $0.00 $0.00 50.0c i I $O.00 3o.cc $0.00 SM $0.00 Trucking - Striagi t Time $0.0c so.00 Trwking - Over Time Soto Truckmg • Dcucte Tme f0.G0 TOTAL EQUIPMENT 50.00 (231 TOTAL TRUCKING J (24) FUEL, LUBRICANTS AND TrRANSPORTAT pN COSTS SO. (251 TOTAL LINES (23) - ;24) + fv) $0.00 (26) 12 %x ONE (26) $0.00 (27) GRAND TOTAL FOR EQUIPMENT. LINES 126) + (27) SO.00 (23) SUBCONTRACTORS 109.05(b)(6 TOTAL SUB:ONTRACTWEEKENDING S14,E53.96 (291 10 % x LINE (30) 53.000.00 CR LESS 7 n z LINE (30) OVER 53.00100 70TAL 5300.00 .41815.7$ (31) (32) ✓/ GRAND FOR SUBCONTRACTORS: ONES 1301 + (31) + (32) $15,769.74 (33) TOTAL OF WORK COMPLETED FOR THE WEEK OTAL LINES,. 117), (221, (28)6 (33) 515,769.74 (34) 0 n OF 80NO RATE BASED UPONUNE- i34) SO.00 (35) 10%xLNE(35) 50.00 (36) !UTAL EXTRA WORK LINES' (33) + (35) + (36) $15,769.74 (37) ✓ Page 2 of 2 a' d FA1V11LY OWNED SINCE 1973 April 26"', 2018 Mr. Tyler Joseph Rieth Riley Constiuction 1751 W. Nlinnesota St. Indianapolis, IN 46221 Re: 96h and Keystone — Price Increase for 8'x4' and 7'x4' Box Culverts Dear Mr. Joseph, Please find summary net price increase to the Box Culverts per the revised locations and design. Footages were from Rinker's t,*e-off. 8'x4' Box Culvert = 712 Lft. x $31.25 = $22,250.00 7'x4' Box Culvert = 436 Lft. x $33.61= S14,653.96 If you have any questions please feel free to contact me. Sincerely, ., Thomas E. DelUyen Seni roject Manager Emailed: goseph(@xieth-riley.com 12900 N. Meridian St. `+ Suite 120 c_; Carmel, Indiana 46032 w.- w.gradexinc.com 317-573-3970 317-573-3979 Equal Opportunity Employer Recapitulations (Autosaved) Recapitulation Pricing for 8'x 4' Box Culvert Redesign 4/26!2018 Description Quantity WLit unit l3ricematerial cost unit cost materials Labor L & E cost unit cost Extended Unit cos S i 5uPrice $ $ $ - 5 Labor and Equipment $ - $ $ - g $ $ - $ - $ - — �, --- --- $ - $ - $ - Materials $ - $ $ - $ 8' x 4' Price Increase per Lft 1 LF $ 27.90 $ 27.90 $ - $ - $ _ $ $ - $ - $ $ _ _ $ - S Subcontractor $ $ -----�— $ - $ - $ $ $ - $ - Sub Totals $ 27.90 $ - $ I $ - Sales Tax N/A 0% $ - $ Allowable Mark up 12% $ 3.35 - 15% $ - 0% $ - 15% $ Sub Totals 1 $ 31.25 1 1 $ - I is - I is - Additional Price per Lft. _ $ 31.25 Recapitulations (Autosaved) Recapitulation Pricing for Tx 4' Box Culvert Redesign 4126/2018 Descrintian Quanfity uni unit pricematerial cost i ni Srjsj material's I&bM L & Ecost . t Extended Unit cost Sub Sub Price $ $ $ $ Labor and Equipment $ $ $ $ - $ $ - $ - $ - $ $ $ $ - - $ - $ -- $ - Materials $ - $� $ $ Tx 4' Price Increase per Lit 1 LF $ 30.01 $ 30.01 $- $ Subcontractor $ $ - $ - $ - S - $ $ - $ is Is - $ Sub Totals $ 30.01 1 $ 1 $ - $ Sales Tax NIA 00r0 $ - $ - Allowable Mark up - 12% S 3.60 15% $ - 0% $ - 15% 5 Sub Totals 1 $ 33.61 $ $ $ Additional Price per Lft. = $ 33.61 i R n inkmer MATERIALSO' April 24, 2018 Tom Delclyen Gradex 12900 N Meridan St Ste 1200 Carmel IN 46032 Tom, Concrete Pipe Division 6662 W 350 N Greenfield, IN 46140 317-891-7500 317-891-7502 (fax) Be low is the cost impact of the re -designed box culvert layout on the 96°i & Keystone Proj.ct. 8x4 box culvert increase is $27.90 / LF. -,' 7x4 box culvert increase is S30.01 / LF. The contributing factors for the increase include: Increased steel areas in the 8x4 box culvert and 7x4 box culvert due to incrcascd parallel loadin- tinder the roadway with reduced cover than original design. Increase of concrete strength requirement from 5000 psi to 6000 psi for re -designed loading conditions. Design and fabrication of 8x4 to 7x4 transitional box culvert segment replacing a previously designed junction box. Design and fabrication of 7x4 bend section to replace previously designed junction box. Design and fabrication of 8x4 bend section to replace previously designed junction box. Installation oladditional steps and re -enforcement in box culvert sections to be used as manhole access points. Should you need any additional information please don't hesitate to contact me. Sincerely, Eugene A. 1vIcGee S:\Indy Group\letter of transmittal-neth-riley indy RIETH-RILEY CONSTRUCTION CO., INC q) "100% EMPLOYEE 0WNED" Indianapolis Office 1751 West Minnesota Street P.O. Box 276 Indianapolis, IN 46206 Phone: (317)634-5561 Fax: ( 317)631-6423 wwwriethri ley.c om Attention: Letter of Transmittal Mail To: Attention: Tim Conarroe Tim Conarroe Date Monday, April 23, 2018 In Reference To: 96th and Keystone Structure 814 Transmittal Codes A For Your Comments F Reviewed B For Your Information G Not Reviewed C As Requested H Issued For Construction Use D For Approval I To Be Completed and Returned to Sender E For Correction J For Prompt Action to be Taken Description of Transmittal Document Date on Transmittal/Revision Date Number of Copies Tfunand" Coils Structure 814 Design, Invoice April 23, 2018 1 B Remarks Signature Copies Transmitted to: '7 y& N je5epi,h Rmth-Riley Job File type your name, title here Continuing... Assurance of Skill • Integrity • Responsibility • In Construction S:\Indy Group\letter of transmittal-neth-riley indy I ) 3200713 cc 21392 Rieth Riley Construction Co., Inc. Attn: Steve Rothgerber INVOICE INVOICE NUMBER INVOICE DATE: PROJECT NO.: TAX NO.: PROJECT MANAGER 735628 September 18, 2017 188440B 11-1531569 PRASAD, Mr. DANDI V PROJECT DESCRIPTION: 16 -ENG -05; 96th Street/Keystone Structure 814 cast -place box COMMENT: Inv01 01 -Sep -17 SERVICES PROVIDED THROUGH: September 1, 2017 LUMP SUM INVOICE FOR PROFESSIONAL ENGINEERING SERVICES Contract Amount: $8,000.00 Total Earned To Date: $8,000.00 Amount Previously Invoiced: $0.00 Contract Balance: $0.00 Percent Complete To Date: 100% Total Amount Due This Invoice: $8,000.00 Item # 333 Remit Payment to: WSP USA P.O. Box 732476, Dallas, TX 75373-2476 Wire Instructions: JPMorgan Chase Bank - 1 Chase Manhattan Plaza, New York, NY 10005 Account Name: WSP USA - # 910 268 5634 - ABA (Routing #): 021000021 PAGE 1 OF 1 US_LS_SUM INDOT ITEM ITEM NO. DESCRIPTION ORIG. QTY. REV. QTY. DIFF. QTY. UNIT RIETH RILEV UNIT COST COST DIFF. 211-09264 33 STRUCTURE BACKFILL, TYPE 1 9,312 9,283 (29) CYS $ 0.01 $ (0.29) 211-09268 35 STRUCTURE BACKFILL, TYPE 5 3,709 1,895 (1,814) CYS $ 75.00 $ (136,050.00) 601-90027 67 GUARDRAIL, TIMBER, TREATED 390 385 (5) LFT $ 66.00 $ (330.00) 714-11177 137 STRUCTURE, REINFORCED CONCRETE, BOX SECTIONS, 8 FT. X 41 645 661 16 LFT $ 395.00 $ 6,320.00 714-11304 138 STRUCTURE, REINFORCED CONCRETE, BOX SECTIONS, 7 FT. X 41 424 436 12 LFT $ 375.00 $ 4,500.00 715-04985 139 VAULT, REINFORCED BOX JUNCTION 5 1 (4) EACH $ 29,756.04 $ (119,024.16) 715-05048 141 PIPE, TYPE 4, CIRCULAR, 6 IN. 18,898 18901 3 LFT $ 4.70 $ 14.10 715-05149 144 PIPE, TYPE 2, CIRCULAR, 12 IN. 3,757 3,716 (41) LFT $ 39.00 $ (1,599.00) 715-05151 145 PIPE, TYPE 2, CIRCULAR, 15 IN. 2,403 2,389 (14) LFT $ 42.00 $ (588.00) 715-05152 146 PIPE, TYPE 2, CIRCULAR, 18 IN. 2,894 2,866 (28) LFT $ 46.00 $ (1,288.00) 715-05154 147 PIPE, TYPE 2, CIRCULAR, 24 IN. 1,259 1,256 (3) LFT $ 54.00 $ (162.00) 715-05156 148 PIPE, TYPE 2, CIRCULAR, 30 IN. 1,379 1,403 24 LFT $ 64.00 $ 1,536.00 715-09064 157 VIDEO INSPECTION FOR PIPE 13,622 13,560 (62) LFT $ 1.28 $ (79.36) 720-03757 167 MANHOLE, C15 16 17 1 EACH $ 1,700.00 $ 1,700.00 720-45030 176 INLET, E7 11 12 1 EACH $ 1,900.00 $ 1,900.00 720-45042 178 INLET, HA5 31 32 1 EACH $ 2,000.00 $ 2,000.00 720-45410 184 MANHOLE, C4 43 39 (4) EACH $ 1,700.00 $ (6,800.00) 720-95157 189 CATCH BASIN, R13, MODIFIED 2 1 (1) EACH $ 2,500.00 $ (2,500.00) 720-95335 190 MANHOLE, M4 1 - (1) EACH $ 6,500.00 $ (6,500.00) 720-95422 191 MANHOLE, J4 17 19 2 EACH $ 3,000.00 $ 6,000.00 720-98555 193 INLET, C15 6 5 (1) EACH $ 1,800.00 $ (1,800.00) 720-91110 N/A MANHOLE, N4 - 1 1 EACH $ 15,000.00 $ 15,000.00 - $ 16 -ENG -05 CONSTRUCTION CHANGE NO 3 ESTIMATE $ (237,750.71) From: Tyler Joseph To: Conarroe, Tim Subject: FW: Added Item - Manhole, N4 (STR 807) Date: Thursday, June 07, 2018 5:07:47 PM Attachments: maae003.Dno imaoe002.Dna Tyler Joseoh.vcf Tim, See below response from Gradex regarding the Manhole,N4. Please include this on the Change Order for the Construction Change's. Rieth-Riley is fine with the contract price of the M4 Manhole at $6500.00 / EA. Let me know if you have any questions regarding the following. Item # 336 720-91110 Thanks, IETH-WILEY CoNsrnwrim Co., INC. Tyler Joseph 13T, - R-2--yEl St _ `�1 634-«61 UT. 21224 V -- = 413: 366-45;.' t:as=oF�reth_r _r::ror- From: Mark Wilson [mailto:mwilson@gradexinc.com] Sent: Thursday, June 07, 2018 3:14 PM To: Tyler Joseph <tjoseph@rieth-riley.com> Subject: Added Item - Manhole, N4 (STR 807) Tyler, I have looked into the revision that changed STR 807 from a Manhole, M4 (bid item 190, Qty = 1 EA) to a Manhole, N4. Rinker does not manufacture an M4 manhole, and had substituted an N4 when submitting their shop drawings. It looks as though the plans were changed to match Rinker's shop drawings, but there is no cost impacts in this change. Gradex therefore, will provide the N4 manhole at the bid price of the M4, $6,500 / EA. Please let me know if there are any questions. Mark Wilson Project Manager A6GRADEX FA,KLY O'.VNED SINCE 1573 12900 N Meridian St, Suite 120 Carmel, IN 46032 317-573-3970 317-573-3979 (fax) 317-220-3437 (mobile) This e-mail and any attachments thereto, are intended only for use by the addressee(s) named herein and may contain legally privileged and/or confidential information. If you are not the intended recipient of this e-mail (or the person responsible for delivering this document to the intended recipient), you are hereby notified that any dissemination, distribution, printing or copying of this e-mail, and any attachment thereto, is strictly prohibited. If you have received this e-mail in error, please respond to the individual sending the message, and permanently delete the original and any copy of any e-mail and printout thereof. This e-mail and any attachments thereto, are intended only for use by the addressee(s) named herein and may contain legally privileged and/or confidential information. If you are not the intended recipient of this e-mail (or the person responsible for delivering this document to the intended recipient), you are hereby notified that any dissemination, distribution, printing or copying of this e-mail, and any attachment thereto, is strictly prohibited. If you have received this e-mail in error, please respond to the individual sending the message, and permanently delete the original and any copy of any e-mail and printout thereof. INDOT ITEM ITEM NO. DESCRIPTION ORIG. QTY. REV. QTY. DIFF. QTY. UNIT RIETH RILEV UNIT COST COSI' DIFF. 203-02000 17 EXCAVATION, COMMON 54,920 54,930 10 CYS $ 14.50 $ 145.00 207-08264 28 SUBGRADE TREATMENT, TYPE II 2,383 2,401 18 SYS $ 14.75 $ 265.50 211-09264 33 STRUCTURE BACKFILL, TYPE 1 9,283 9,304 21 CYS $ 0.01 $ 0.21 213-09269 36 FLOWABLE BACKFILL, NON -REMOVABLE 234 237 3 CYS $ 75.00 $ 225.00 303-08210 40 COMPACTED AGGREGATE NO. 53 TEMPORARY FOR DRIVEWAYS 785 788 3 TON $ 35.00 $ 105.00 610-09108 92 PCCP FOR APPROACHES, 9 IN. 1,730 1,748 18 SYS $ 69.07 $ 1,243.26 715-05024 140 PIPE, TYPE 2, CIRCULAR, 36 IN. 1,004 1,009 5 LFT $ 75.00 $ 375.00 715-05048 141 PIPE, TYPE 4, CIRCULAR, 6 IN. 18,901 18,882 (19) LFT $ 4.70 $ (89.30) 715-05149 144 PIPE, TYPE 2, CIRCULAR, 12 IN. 3,716 3,782 66 LFT $ 39.00 $ 2,574.00 715-05151 145 PIPE, TYPE 2, CIRCULAR, 15 IN. 2,389 2,281 (108) LFT $ 42.00 $ (4,536.00) 715-05152 146 PIPE, TYPE 2, CIRCULAR, 18 IN. 2,866 2,859 (7) LFT $ 46.00 $ (322.00) 715-05154 147 PIPE, TYPE 2, CIRCULAR, 24 IN. 1,256 1,268 12 LFT $ 54.00 $ 648.00 715-05156 148 PIPE, TYPE 2, CIRCULAR, 30 IN. 1,403 1,399 (4) LFT $ 64.00 $ (256.00) 715-05159 149 PIPE, TYPE 2, CIRCULAR, 42 IN. 274 268 (6) LFT $ 99.00 $ (594.00) 715-05161 150 PIPE, TYPE 2, CIRCULAR, 48 IN. 323 321 (2) LFT $ 115.00 $ (230.00) 715-09064 157 VIDEO INSPECTION FOR PIPE 13,560 13,516 (44) LFT $ 1.28 $ (56.32) 718-52610 165 AGGREGATE FOR UNDERDRAINS 3,516 3,515 (1) CYS $ 38.00 $ (38.00) 718-99153 166 GEOTEXTILES FOR UNDERDRAIN 9,046 9,034 (12) SYS $ 1.00 $ (12.00) 720-03757 167 MANHOLE, C15 17 13 (4) EACH $ 1,700.00 $ (6,800.00) 720-08659 172 MANHOLE, C5 9 8 (1) EACH $ 1,700.00 $ (1,700.00) 720-08661 173 MANHOLE, K5 MODIFIED 5 4 (1) EACH $ 5,000.00 $ (5,000.00) 720-10138 175 MANHOLE, L7 3 2 (1) EACH $ 6,500.00 $ (6,500.00) 720-45030 176 INLET, E7 12 14 2 EACH $ 1,900.00 $ 3,800.00 72045042 178 INLET, HA5 32 36 4 EACH $ 2,000.00 $ 8,000.00 720-45045 179 INLET, J10 3 1 (2) EACH $ 1,900.00 $ (3,800.00) 720-45075 181 INLET, R13 3 1 (2) EACH $ 2,000.00 $ (4,000.00) 72045410 184 MANHOLE, C4 39 36 (3) EACH $ 1,700.00 $ (5,100.00) 720-93501 186 MANHOLE, L4 1 2 1 EACH $ 6,500.00 $ 6,500.00 720-94432 187 MANHOLE, C7 7 6 (1)EACH $ 1,700.00 $ (1,700.00) 720-94612 188 MANHOLE, K4 7 6 (1) EACH $ 4,500.00 $ (4,500.00) 720-98174 192 INLET, B15 8 10 2 EACH $ 1,800.00 $ 3,600.00 720-98555 193 INLET, C15 5 7 2 EACH $ 1,800.00 $ 3,600.00 333 MANHOLE, M7 1 1 EACH $ 8,000.00 $ 8,000.00 720-92884 334 MANHOLE, K4, MODIFIED 2 2 EACH $ 6,000.00 $ 12,000.00 - $ 16 -ENG -05 CONSTRUCTION CHANGE NO 5 ESTIMATE $ 5,847.35 IETHj May 24th, 2018 ILEY CONSTRUCTION CO., INC. 1000,o Quality • 1000/o Employee Owned • Over 100 Years Tim Conarroe Area Supervisor, Construction Solutions American Structurepoint Inc. 7260 Shadeland Station Indianapolis, IN 46256 Sent Via Email: TConarroe@structurepoint.com RE: 96th and Keystone Construction Change No.5 Added Structures Tim, The following documentation is for the added structures on Construction Change No.5, this proposal includes pricing for Items 333 & 334. Included in this pricing is all the labor, equipment, and materials necessary to complete the work. The following is a pricing breakdown: INDOT ITEM UNIT ITEM NO. DESCRIPTION QTY UNIT COST TOTAL 334 MANHOLE, M7 1 EA $10,432.67 $10,432.67 335 MANHOLE, K4, 720-92884 MODIFIED 2 EA $ 8,337.91 $16,675.82 If you have any questions regarding this change order proposal, please let me know. Thanks, 7yze" jeverA Tyler Joseph Project Manager Rieth-Riley Construction Co., Inc. Cell: (419)-966-4890 P.O. Box 276 • 1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 5/24/18 Work Performed: Construction Change No.5 CONTRACT: 16 -ENG -05 PROJECT: 96th and Keystone, 16 -ENG -05 FORCE ACCOUNT/EXTRA WORK FOR: Item 333: MANHOLE. M7 - 1 EA LABOR 109.05 (6)(1) Hni IRS EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 $27.51 $0.00 CARPENTER FOREMAN 0.00 $29.01 $0.00 COMBINATION 0.00 $30.51 $0.00 FINISHER 0.00 $26.22 $0.00 FOREMAN 0.00 $35.80 $0.00 LABORER 0.00 $25.22 $0.00 MECHANIC 0.00 $35.80 $0.00 OPERATOR (103) 0.00 $34.80 $0.00 OPERATOR (841) 0.00 $33.251 $0.00 OPERATOR OILER (103) 0.00 $30.66 $0.00 CA TECH 0.00 $25.22 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $44.80 $0.00 TEAMSTER 0.00 $28.41 $0.00 FRINGES TOTALLABOR FICA 7.50 % x LINE (2) $0.00 (2) $0.00 (3) EMPLOYEE HOURS % X RATE EXTENSION CARPENTER 0.00 X $22.32 = $0.00 CARPENTER FOREMAN 0.00 X $22.32 = $0.00 COMBINATION 0.00 X $15.16 = $0.00 FINISHER 0.00 X $15.16 = $0.00 FOREMAN 0.00 X $18.41 = $0.00 LABORER 0.00 X $15.16 = $0.00 MECHANIC 0.00 X $18.41 = $0.00 OPERATOR (103) 0.00 X $18.41 = $0.00 OPERATOR (841) 0.00 X $21.36 = $0.00 OPERATOR OILER (103) 0.00 X $17.66 = $0.00 QA TECH 0.00 X $15.16 = $0.00 SUPERINTENDENT/PROJECT MA 0.00 X $18.411 $0.00 TEAMSTER 1 0.00 X $14.911 $0.00 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION 5.72 % X LINE (2) $0.00 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 5.80 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.85 % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 8 9 $0.00(10) 20 % x LINE (10) $0.00(11) GRAND TOTAL LABOR LINES (10) + (11) $0.00(12) Page 1 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion S - $ $0.00 $0.00 $ $ $ S $ $ Is $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE(18)+(19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION TOTAL TRUCKING $0.00 $0.00 FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 $0.00 TOTAL LINES (23) + (24) + (25) $0.00 $0.00 12 % x LINE (26) $0.00 $0.00 GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 $0.00 (34) $0.00 $0.00 (35) $0.00 $0.00 (36) $0.00 $0.00 (37) $0.00 $0.00 Trucking - Striaght Time $0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 $0.00 TOTAL EQUIPMENT $0.00 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $0.00 (26) 12 % x LINE (26) $0.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 (28) SUBCONTRACTORS 109.05 (6)(61 DESCRIPTION Item 333: MANHOLE M7 - 1 EA TOTAL SUBCONTRACT WEEK ENDING $9,549.48 (29) 10 % x LINE (30) $3,000.00 OR LESS $300.00 (31) 7 % x LINE (30) OVER $3,000.00 $458.46 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) f (31) f (32) $10,307.94 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) 8 (33) $10,307.94 (34) % OF BOND RATE BASED UPON LINE (34) $113.39 (35) 10 % x LINE (35) $11.34 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $10,432.67 (37) Page 2 of 2 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 5/24/18 Work Performed: Construction Change No.5 CONTRACT: 16 -ENG -05 PROJECT: 96th and Keystone 16 -ENG -05 FORCE ACCOUNT/EXTRA WORK FOR: Item 334: MANHOLE, K4, MODIFIED LABOR 109.05 (b)(1) uni iac EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 $27.51 $0.00 CARPENTER FOREMAN 0.00 $29.01 $0.00 COMBINATION 0.00 $30.51 $0.00 FINISHER 0.00 $26.22 $0.00 FOREMAN 0.00 $35.801 $0.00 LABORER 0.00 $25.22 $0.00 MECHANIC 0.00 $35.80 $0.00 OPERATOR (103) 0.00 $34.80 $0.00 OPERATOR (841) 0.00 $33.25 $0.00 OPERATOR OILER (103) 0.00 $30.66 $0.00 CIA TECH 0.00 $25.22 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $44.80 $0.00 TEAMSTER 0.00 $28.41 $0.00 FRINGES TOTAL LABOR $0.00 (2) FICA 7.50 % x LINE (2) $0.00 (3) EMPLOYEE HOURS % X LINE (2) RATE EXTENSION CARPENTER 0.00 X $22.32 = $0.00 CARPENTER FOREMAN 0.00 X $22.32 = $0.00 COMBINATION 0.00 X $15.16 = $0.00 FINISHER 0.00 X $15.16 = $0.00 FOREMAN 0.00 X $18.41 = $0.00 LABORER 0.00 X $15.16 = $0.00 MECHANIC 0.00 X $18.41 = $0.00 OPERATOR (103) 0.00 X $18.41 = $0.00 OPERATOR (841) 0.00 X $21.36 = $0.00 OPERATOR OILER (103) 0.00 X $17.66 = $0.00 CIA TECH 0.00 X $15.16 = $0.00 SUPERINTENDENT/PROJECT MA 0.00 X 1 $18.411 $0.00 TEAMSTER 1 0.00 X 1 $14.91 =1 $0.00 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION 55.72 % X LINE (2) $0.00 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 5.80 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.855 % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE p3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $0.00 (10) 20 % x LINE (10) $0.00(11) GRAND TOTAL LABOR LINES (10) + (11) $0.00(12) Page 1 of 2 MATERIAL 109.05 (6)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extension EXTENSION TOTALTRUCKING E $ E $ E S $ $ $ $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18) + (19) 12 %x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (6)(4) $000 (18) $000 (19) $000 (20) $0.00 (21) $000 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION TOTALTRUCKING $0.00 $0.00 FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 $000 TOTAL LINES (23)+(24)+(25) $0.00 $000 12 % x LINE (26) $0.00 $000 GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trucking - Slriaght Time $0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 $0.00 SUBCONTRACTORS 109.05 (6)(61 TOTAL EQUIPMENT $0.00 (23) TOTALTRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23)+(24)+(25) $0.00 (26) 12 % x LINE (26) $0.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 (28) AMOUNT TOTAL SUBCONTRACT WEEK ENDING $15,314.44 (29) 10 % x LINE (30) $3,000.00 OR LESS $300.00 (31) 7 % x LINE (30) OVER $3,000.00 $862.01 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $16,476-45 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $16,476.45 (34) 1.1 % OF BOND RATE BASED UPON LINE (34) $181.24 (35) 10 % x LINE (35) $18.12 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $16,675.82 (37) Page 2 of 2 5/10/2018 12:35 PM FAMILY OWNED SINCE 1973 96TH STREET AND KEYSTONE PARKWAY ROAD IMPROVEMENTS Description Quantit Units Labor Total Equipment Total Materials Total Subs Total MANHOLE, M7 1.00 EA $ 1,762.25 $ 1,589.00 $ 5,049.20 Sales Tax 0% $ - Allowable Mark-up 10% $ Allowable Mark-up 20% $ 352.45 12% $ 190.68 12% $ 605.90 7% $ Subtotal $ 2,114.70 1 1 $ 1,779.68 1 1 $ 5,655.10 $ Total Unit Price $ 9,549.48 1of1 I n4& rAm L FAMILY OWNED SINCE 1973 96TH STREET AND KEYSTONE PARKWAY ROAD IMPROVEMENTS 5/10/2018 12:34 PM Description Quantit Units Labor Total Equipment Total Materials Total Subs Total MANHOLE, K4, MODIFIED 2.00 EA $ 2,202.81 $ 1,831.25 $ 9,482.20 Sales Tax 0% $ - Allowable Mark-up 10% $ Allowable Mark-up 20% $ 440.56 12% $ 219.75 12% $ 1,137.86 7% $ Subtotal $ 2,643.37 $ 2,051.00 $ 10,620.06 $ Total Unit Price $ 7,657.22 1of1 Cost Report Gradex Inc. 7 Mark Wilson Page 1 of 2 17191-1 Revision #6 05/10/2018 11:29 AM Biditem MANHOLE, K4 MODIFIED 10 Takeoff Qty: 2.000 EA Client #: 720-92884 Bid Qty: 2.000 EA Biditem Base Labor Burden Total tabor Equipment Perm Mads Const Mads Sub Trucdng Total U. Cost 1,078.75 22.66 1,101.41 915.63 4,741.10 0.00 0.00 0.00 6,758.13 Total 2,157.50 45.31 2,202.81 1,831.25 9,482.20 0.00 0.00 0.00 13,516.26 Manhours Unit/MH MHNntt $/MH Base Labor/MH Total Labor/MH Unk/CH Total Labor Equipment 30.0000 0.0667 15.0000 450.5420 71.9167 Tata) 73.4270 0.4000 36.25 067119-084 Over 0.00 Quantity: 0.00 8,400.45 Total 1,726.00 Base Labor Burden Tata) Labor Equipment Perm "IS Carat Mails Sub Truck** Total U. cost 1,078.75 22.66 1,101.41 915.63 4,741.10 0.00 0.00 0.00 6,758.13 Total 2,157.50 45.31 2,202.81 1,831.25 9,482.20 0.00 0.00 0.00 13,516.26 Crew Stink Crew Hrs/Unk Unks/Crew Hr $/Crew Hour Shifts Unks/Shtft Shifts/Unk $/Shift 2,017.0300 2.5000 0.4000 806.8120 EA 0.5000 4.0000 0.2500 27,032.5200 Perm Mails Mrthours Unit/MH #A/Link Total tabor/MH Base Labor/Untt 1,726.00 30.0000 0.0667 15.0000 73.4270 0.00 1,078.7500 Calendar: 60 10 HR 6 DAY Hrs/Shift: 10 WC: IN6306 Sewer Construction 0.00 0.00 Crew: PC50 PIPE - 336 EXCAVATOR Prod: HU 2.5 Eff: 100.00 Crew Hrs: 5.00 Labor Pcs: 6.00 Equipment Pcs: 2.00 Notes: str 124 6 130 modified for depth and size, 84" Resource Descr*lon Po/wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2AG G08 No.8 Stone 1.00 6.00 TN 18.10 100.00 18.10 108.60 2CCLA Class A Concrete 1.00 4.00 CY 96.35 100.00 96.35 385.40 2SMHO84 84" Manhole 1.00 2.00 EA 4,219.10 100.00 4,219.10 8,438.20 2SXCA Casting 1.00 2.00 EA 275.00 100.00 275.00 550.00 8E40 336 Excavator 1.00 5.00 HR 218.00 100.00 218.00 1,090.00 8EHP Hoe Pac 0.25 1.25 HR 245.00 100.00 245.00 306.25 8LW4 930 Loader 0.75 3.75 HR 116.00 100.00 116.00 435.00 FM Foreman 1.00 5.00 MH 90.00 100.00 91.89 459.45 LG General Laborer 2.00 10.00 MH 62.50 100.00 63.81 638.13 LP Pipe Laborer 1.00 5.00 MH 62.50 100.00 63.81 319.06 OP Operator 2.00 10.00 MH 77.00 100.00 78.62 786.17 Biditem MANHOLE, M7 Takeoff Qty: 1.000 EA 2 O Bid Qty: 1.000 EA Base labor Burden Total Labor Equipment Perm Mails Const Mails Sub Trucking Tata) U. Cost 1,726.00 36.25 1,762.25 1,589.00 5,049.20 0.00 0.00 0.00 8,400.45 Total 1,726.00 36.25 1,762.25 1,589.00 5,049.20 0.00 0.00 0.00 8,400.45 Manhours unit/MH WVUnit $/MH Base Labor/MH Total labor/MH Unk/CH 24.0000 0.0417 24.0000 350.0188 71.9167 73.4271 0.2500 •. •Manhole,• Quantity: 1 Unit: EA Base labor Burden Total Labor Equipment Perm Mails Const Malls Sub Trucking Total U. cost 1,726.00 36.25 1,762.25 1,589.00 5,049.20 0.00 0.00 0.00 8,400.45 Total 1,726.00 36.25 1,762.25 1,589.00 5,049.20 0.00 0.00 0.00 8,400.45 17191-1 Revision #6 05/10/2018 11:29 AM Page 2 of 2 Crew Sunk Crew Hrsn)nk Unks/Crew Hr $/Crew Hour Shifts unkwShift ShtftsNnit $/Shut 3,351.2500 4.0000 0.2500 837.8125 0.4000 2.5000 0.4000 21,001.1250 Manhours Unk/MH MH/Unk Total labor/MH Base Labor/Unk 24.0000 0.0417 24.0000 73.4271 1,726.0000 Calendar: 60 10 HR 6 DAY Hrs/Shift: 10 WC: IN6306 Sewer Construction Crew: PC60 PIPE - 349 EXCAVATOR Prod: HU 4 Eff: 100.00 Crew Hrs: 4.00 Labor Pcs: 6.00 Equipment Pcs: 2.00 Notes: Str 312 manhole changed from L-7 to M-7 Resource Description Pm Wste @wrtky Unit Unk Cast TaWOT % Actual LIC Total ZAGG08 No. 8 Stone 1.00 4.00 TN 18.10 100.00 18.10 72.40 2CCLA Class A Concrete 1.00 3.00 CY 96.35 100.00 96.35 289.05 2SMH108 108" Manhole 1.00 1.00 EA 4,412.75 100.00 4,412.75 4,412.75 2SXCA Casting 1.00 1.00 EA 275.00 100.00 275.00 275.00 8E50 349 Excavator 1.00 4.00 HR 249.00 100.00 249.00 996.00 8EHP Hoe Pac 0.25 1.00 HR 245.00 100.00 245.00 245.00 8LW4 930 Loader 0.75 3.00 HR 116.00 100.00 116.00 348.00 FM Foreman 1.00 4.00 MH 90.00 100.00 91.89 367.56 LG General Laborer 2.00 8.00 MH 62.50 100.00 63.81 510.50 LP Pipe Laborer 1.00 4.00 MH 62.50 100.00 63.81 255.25 OP Operator 2.00 8.00 MH 77.00 100.00 78.62 628.94 Report Summary Base Labor Burden Total Labor Equipment Perm Mads Corot Mads Sub TruddnR Total Total 3,884 82 3,965 3,420 14,531 0 0 0 21,917 Job Notes "'THIS ESTIMATE USE T&M RATES SET BY GRADEX"' """"""Estimate created on: 05/03/2018 by User#: 4 - Tom DeKlyen Source estimate used: T:\HEAVYBID\EST\GXTEtM Calendars Used In Estimate 60 10 HR 6 DAY IVContractor Gradex Project 17-473 96th & Keystone MATERIALS'" Date 3/15/2018 Location Indianapolis Plant 5640 STR# STRUCTURE TYPE PRICE STORAGE FEE NOTES 303 MANHOLE L4 $ 3,325.00 $ 33.25 135B MANHOLE K4 $ 2,042.50 $ 20.43 UPSIZED FROM MH TYPE J TO MH TYPE K 302 INLET HA5 $ 375.25 $ 3.75 133 INLET HAS $ 380.00 $ 3.80 slotted drain 304 INLET HAS $ 375.25 $ 3.75 139B INLET HAS $ 375.25 $ 3.75 141 INLET HAS $ 380.00 $ 3.80 slotted drain 312 MANHOLE M7 $ 4,412.75 $ 44.13 UPSIZED FROM MH TYPE L TO MH TYPE M 314 MANHOLE L4 $ 3,325.00 $ 33.25 317 MANHOLE L4 $ 3,325.00 $ 33.25 UPSIZED FROM MH TYPE K TO MH TYPE L 319 MANHOLE K4 $ 2,042.50 $ 20.43 470 MANHOLE K4 $ 2,042.50 $ 20.43 467 MANHOLE K4 $ 2,042.50 $ 20.43 462 CATCH BASIN E7 $ 356.25 $ 3.56 468 CATCH BASIN B15 $ 451.25 $ 4.51 466 CATCH BASIN K10 $ 381.90 $ 3.82 461 CATCH BASIN C15 $ 465.50 $ 4.66 446 CATCH BASIN E7 $ 356.25 $ 3.56 134 INLET HAS $ 380.00 $ 3.80 slotted drain 313 INLET HAS $ 375.25 $ 3.75 309 INLET HAS $ 375.25 $ 3.75 310 INLET HAS $ 375.25 $ 3.75 138 INLET HA5 $ 380.00 $ 3.80 SLOTTED DRAIN 139A INLET HA5 $ 375.25 $ 3.75 140 INLET HA5 $ 380.00 $ 3.80 SLOTTED DRAIN 201 INLET HAS $ 375.25 $ 3.75 128 MOD MH K5 $ 2,280.00 $ 22.80 115 INLET HAS $ 375.25 $ 3.75 116 INLET HA5 $ 375.25 $ 3.75 121 INLET HA5 $ 375.25 $ 3.75 124 84" MH $ 4,175.36 $ 41.75 UPSIZED FROM MH TYPE K TO 84" DIAMETER MH 130 84" MH $ 4,262.84 $ 42.63 UPSIZED FROM MH TYPE K TO 84" DIAMETER MH 123 INLET HAS $ 375.25 $ 3.75 132 INLET HA5 $ 380.00 $ 3.80 slotted drain 117 INLET HAS $ 380.00 $ 3.80 slotted drain 110 INLET HAS $ 375.25 $ 3.75 251 IN LET HAS $ 375.25 $ 3.75 453 IN LET HAS $ 375.25 $ 3.75 439 IN LET HAS $ 375.25 $ 3.75 751 INLET HAS $ 380.00 $ 3.80 UPSIZED FROM INLET R13 TO INLET HAS SLOTTED DRAIN 752 INLET HA5 $ 375.25 $ 3.75 UPSIZED FROM INLET R13 TO INLET HAS 754 INLET HAS $ 375.25 $ 3.75 TOTALS $ 45,081.60 $ 450.82 IETH!HIL EY CONSTRUCTION CO., INc. 100% Quality • 100% Employee Owned • Over 100 Years September 201h, 2018 Tim Conarroe Area Supervisor, Construction Solutions American Structurepoint Inc. 7260 Shadeland Station Indianapolis, IN 46256 Sent Via Email: TConarroe@structurepoint.com RE: 96th and Keystone- T&M Storm Structure Modification & Disposal Tim, The following proposal is representative of the cost associated with the structures that required disposal or core drilled. This change was required due to conflicts with IPL and the proposed storm pipe shown in the original contract drawings. The cost below is representative of all the T&M work required for moving the storm system on the North side of 96th St. ITEM DESCRIPTION QTY UNITS UNIT PRICE TOTAL T&M Storm Structure Modifications & Disposal 1 LS $ 9,792.40 $ 9,792.40 Item #332 Please see attached back-up documentation for your use. If you have any questions regarding this proposal, please let me know. Thanks, 2ylar JO MPA Tyler Joseph Project Manager Rieth-Riley Construction Co., Inc. Cell: (419)-966-4890 P.O. Box 276 • 1751 W Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 9/20/18 Work Performed: Storm Structure Modification CONTRACT: 16 -ENG -05 PROJECT: 96th & Keystone Parkway FORCE ACCOUNT/EXTRA WORK FOR: Modification & Disposal of Storm Structures East of Keystone. LABOR 109.05 (b)(1) EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 $27.51 $0.00 CARPENTER FOREMAN 0.00 $29.01 $0.00 COMBINATION 0.00 $30.51 $0.00 FINISHER 0.00 $26.22 $0.00 FOREMAN 0.00 $35.801 $0.00 LABORER 0.00 $25.22 $0.00 MECHANIC 0.00 $35.80 $0.00 OPERATOR (103) 0.00 $34.80 $0.00 OPERATOR (841) 0.00 $33.25 $0.00 OPERATOR OILER (103) 0.00 $30.66 $0.00 QA TECH 0.00 $25.22 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $44.80 $0.00 TEAMSTER 0.00 $28.41 $0.00 FRINGES TOTAL LABOR $0.00 (2) FICA 7.50 % x LINE (2) $0.00 (3) EMPLOYEE HOURS X LINE (2) RATE EXTENSION CARPENTER 0.00 X $22.32 = $0.00 CARPENTER FOREMAN 0.00 X $22.32 = $0.00 COMBINATION 0.00 X $15.16 = $0.00 FINISHER 0.00 X $15.16 = $0.00 FOREMAN 0.00 X $18.41 = $0.00 LABORER 0.00 X $15.16 = $0.00 MECHANIC 0.00 X $18.41 = $0.00 OPERATOR (103) 0.00 X $18.41 = $0.00 OPERATOR (841) 0.00 X $21.36 = $0.00 OPERATOR OILER (103) 0.00 X $17.66 = $0.00 QATECH 0.00 X $15.16 = $0.00 SUPERINTENDENT/PROJECT MA 0.00X $18.41 = $0.00 TEAMSTER 0.00 X $14.911 $0.00 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION 5.72 % X LINE (2) $0.00 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 5.80 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT .3.85 % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $0.00(10) 20 % x LINE (10) $0.00(11) GRAND TOTAL LABOR LINES (10) + (11) $0.00(12) Page 1 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion EXTENSION (25) $0.00 $0.00 $0.00 $0.00 s $ $ $ Is $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)+ (19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION (25) $0.00 $0.00 $0.00 $0.00 $0.00 (28) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trucking - Siriaghl Time $0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 $0.00 TOTAL EQUIPMENT TOTAL TRUCKING FUEL, LUBRICANTS AND TRANSPORTATION COSTS TOTAL LINES (23) + (24) + (25) 12 % x LINE (26) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) SUBCONTRACTORS 109.05 (b)(6) $0.00 (23) $0.00 (24) $0.00 (25) $0.00 (26) $0.00 (27) $0.00 (28) TOTAL SUBCONTRACT WEEK ENDING $8,958.25 (29) 10 % x LINE (30) $3,000.00 OR LESS $300.00 (31) 7 % x LINE (30) OVER $3,000.00 $417.08 (32) GRAND TOTAL FOR SUBCONTRACTORS. LINES (30)' (31) + (32) $9,675.33 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $9,675.33 (34) 1.1 % OF BOND RATE BASED UPON LINE (34) $106.43 (35) 10 %x LINE (35) $10.64 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $9,792.40 (37) Page 2 of 2 n4& PAM L FAMILY OWNED SINCE 1973 16 -ENG -05 96TH & KEYSTONE Rieth-Riley Recapitulation of Costs IPL Conflict Structures East of Keystone on 96th St 9/13/2018 2:16 PM Description Quantit Units Labor Total Equipment Total Materials Total Subs Total T&M Core Drilling 1.00 LS $ 3,207.00 Disposal of Unneeded Structures 1.00 LS $ 77.00 $ 221.00 $ 4,439.46 Subtotal $ 77.00 $ 221.00 $ 4,439.46 $ 3,207.00 Allowable Markup 1 0% $ 0% $ 12% $ 532.74 15% $ 481.05 Subtotal $ 77.00 $ 221.00 $ 4,972.20 $ 3,688.05 Total Cost $ 8,958.25 1of1 Cost Report Gradex Inc. 7 Mark Wilson Page 1 of 2 17191-9 IPL Conflict Structures 09/13/2018 2:09 PM Biditem CORE DRILL 8.17.18 Takeoff Qty: 1.000 LS 1 O Bid Qty: 1.000 LS t- .. Quantity: Calendar: 60 10 HR 6 DAY Hrs/Shift: 10 WC: Code not found. Resource Description Pcs/Wste Quantity Unit Unit Cast Tax/OT % Actual UC Total 4CORE Coring/Tapping - Sub 1.00 1.00 LS 1,710.00 100.00 1,710.00 1,710.00 Biditem CORE DRILL 8.20.18 Takeoff Qty: 1.000 LS 2 O Bid Qty: 1.000 LS 0• • Coring/Tapping-Sub Quantity: Calendar: 60 10 HR 6 DAY Hrs/Shift: 10 WC: Code not found. Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4CORE Coring/Tapping - Sub 1.00 1.00 LS 360.00 100.00 360.00 360.00 Biditem CORE DRILL 8.21.18 Takeoff Qty: 1.000 LS 3 O Bid Qty: 1.000 LS • • .. . Quantity: Calendar: 60 10 HR 6 DAY Hrs/Shift: 10 WC: Code not found. Resource Description PdM/ste Quantity Unit Unit Cost Taxtor % Actual UC TOW 4CORE Coring/Tapping - Sub 1.00 1.00 LS 1,137.00 100.00 1,137.00 1,137.00 Biditem DISPOSAL OF UNNEEDED STRUCTURES Takeoff Qty: 1.000 LS 40 Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Mads Const Mads Sub Truddng Total U. Cost 77.00 0.00 77.00 221.00 4,439.46 0.00 0.00 0.00 4,737.46 Total 77.00 0.00 77.00 221.00 4,439.46 0.00 0.00 0.00 4,737.46 Manhours Unit/MH MW/Unk S/MH Base Labor/MH Total Labor/MH Unit/CH 1.0000 1.0000 1.0000 4,737.4600 77.0000 77.0000 0.0000 039901 DisposalQuantity: Base Labor Burden Total Labor Equipment Perm Mads Const Mads Sub Trucking Total U. Cost 77.00 0.00 77.00 221.00 4,439.46 0.00 0.00 0.00 4,737.46 Total 77.00 0.00 77.00 221.00 4,439.46 0.00 0.00 0.00 4,737.46 Manhours Unit/MH MW/Unit Total Labor/MH Base Labor/Unit 1.0000 1.0000 1.0000 77.0000 77.0000 Calendar: 60 10 HR 6 DAY Hrs/Shift: 10 WC: Code not found. Notes I..nker in possession of STR 485, 489, 491, 503, 507, 513, s 518. Cost for disposal of bases from Rinker. Gradex in possession of STR 509. Cost for entire structure and disposal from Gradex. 17191-9 IPL Conflict Structures 09/13/2018 2:09 PM Page 2 of 2 Resource Description Pcs/Wste Quantity Unit Unit Cast Tax/OT % Actual LX Total 2SMH060 60" Manhole 1.00 1.00 EA 1,648.25 100.00 1,648.25 1,648.25 2SMHXXX Rinker Disposal of 7 MH Bases 1.00 1.00 LS 2,791.21 100.00 2,791.21 2,791.21 8XBB Backhoe w/ Breaker 1.00 1.00 HR 221.00 100.00 221.00 221.00 OP Operator 1.00 1.00 MH 77.00 100.00 77.00 77.00 Report Summary Base labor Burden Total Labor Equipment Per., Mads Const Matic Total 77 0 77 221 4,439 0 Job Notes —THIS ESTIMATE USE T£tM RATES SET BY GRADEX"' '""""""'Estimate created on: 09/13/2018 by User#: 7 - Mark Wilson Source estimate used: T:\HEAVYBID\EST\GXT£tM Calendars Used In Estimate 60 10HR6DAY Sub Trucking Total 3,207 0 7,944 Daily Time and Materials (T&M) Report Date: 8/17/2018 Foreman: MARK WILSON (EMP9667) Gradex Inc. 140000-2 - Inlet Cores Quantity: 0 LS Notes: Penhall coring for IPL conflict storm structures 3 @ 22" diameter x 7" 2 @ 20" diameter x 7" 5 @ 8" diameter x 7" Page 1 Daily Time and Materials (T&M) Report Date: 8/20/2018 Foreman: MARK WILSON (EMP9667) Gradex Inc. 140000-2 - Inlet Cores Quantity: 0 LS Notes: Penhall coring IPL conflict structures 2 @ 22" diameter x 7" Page 1 Daily Time and Materials (T&M) Report Date: 8/21/2018 Foreman: MARK WILSON (EMP9667) Gradex Inc. 140000-2 - Inlet Cores Quantity: 0 LS Notes: Penhall coring IPL conflict structures 5 @ 20" diameter x 7" 3 @ 8" diameter x 7" Page 1 (!! OMPANY www.penhall.com GRADEX, INC. 12900 N MERIDIAN ST #120 CARMEL IN 46032- 317-573-3970 317-573-3979 4673 1r 8/24/18 00354 �liYls�t1di?? 000006364 PENHALL COMPANY *Note New Remit To Address P.O. Box 842911 Los Angeles, CA 90084-2911 TERMS: Due Upon Receipt/1% Net 15 Days Information provided as required by IRC section 3406 Penhall Company TIN 33-0349226 Subject to the standard terms and conditions which are posted and may be accessed at www.penhall.com/terms-and-conditlor&PR Scanning Now Available INV -V7-2018 3400 E 96th street ;;, �, 9'{,a�sf6 17191 h d� IPS 1t ^raj r' Tom Wood Powersports CARMEL CRAIG, SHAWN E _�� Matt Burton s 301 s v j = 391808 123 3) 22" DIA X 7" SEWER STRUCTURE 8/17/18 4008545 1710.00 2) 20" DTA X 7" SEWER STRUCTURE 4008626 5) 8" DIA X 7" SEWER STRUCTURE INVOICE PAYMENTS AND QUESTIONS CAN BE EMAILED TO JSMITHBARTLETT@PENHALL.COM AUG 3 Luku t By_ - ----- __ For billing questions please contact: 317-a75-7601 '=� �, °`� $ 1, 710.00 TERMS: Due Upon Receipt/1% Net 15 Days Information provided as required by IRC section 3406 Penhall Company TIN 33-0349226 Subject to the standard terms and conditions which are posted and may be accessed at www.penhall.com/terms-and-conditlor&PR Scanning Now Available INV -V7-2018 Equipment and . vices to Meet Your Needs! 4 CONCRETE,'ASI'PHALT FOR YOUR LOCAL OFFICE: 1`�n° OO Breaking t ;'Ire 714-772-6450 CORE DRILLING CUSTOMER NAME COMPRESSORS Compaction ure�lh.,n:, 770-941-3401 RoC� D ' ilq BILLING ADDRESS BACK HOES/MINI-MAX HYDRA HAMMER CAT EXCAVATORS 512-385-8500 to 12.000 ft. lbs. JOB ADDRESS Pulverizing Compaction ung Boom to 80+ ft. Nationwide: 7 -800-PENHALL BOBCAT FOR YOUR LOCAL OFFICE: 1`�n° OO Breaking 1801 P 714-772-6450 Excavation CUSTOMER NAME 763-542-9999 Compaction GA 770-941-3401 Dump Trucks BILLING ADDRESS 480-967-5029 HYDRA HAMMER -- -- -- 512-385-8500 Breaking JOB ADDRESS 503-253-9500 Compaction CA 661-832-1155 Raleigh NEW CUST. NUMI 919-859-9911 DEMOLITION AL 205-951-0041 Hard/Soft NV 775-786-8498 GROOVING/GRINDING TYPE QUANTITY HOURS UNITS 818-562-1250 Texturing VA 804-520-1260 Joint Sealing CA 805-482-4634 Safety Grooving CA 951-369-2800 Epoxy Repairs SC 843-767-1881 Green Sawing i 916-386-1589 WHEEL SAWS NC 704-392-0644 Vermeer Cuts to 31"Deep UT Nationwide: 7 -800-PENHALL FOR YOUR LOCAL OFFICE: 1`�n° OO Customer has idde-energized CA 714-772-6450 Minneapolis MN 763-542-9999 Stand By / Remar GA 770-941-3401 Phoenix AZ 480-967-5029 TX 512-385-8500 Portland OR 503-253-9500 -id CA 661-832-1155 Raleigh NC 919-859-9911 -,am AL 205-951-0041 Reno NV 775-786-8498 �. CA 818-562-1250 Richmond VA 804-520-1260 to CA 805-482-4634 Riverside CA 951-369-2800 =ton SC 843-767-1881 Sacramento CA 916-386-1589 Dtte NC 704-392-0644 Salt Lake City UT 801-355-7364 ,.mbia SC 803-936-0039 San Diego CA 858-550-1111 Is TX 817-416-1846 San Leandro CA 510-357-8810 ger CO 303-934-3866 Santa Clara CA 408-970-9494 sno CA 661-832-1155 Seattle WA 206-763-9200 -ionolulu HI 808-488-8222 Superior WI 715-394-6757 Las Vegas NV 702-736-6033 Tucson AZ 520-744-0225 Los Angeles CA 310-225-6690 COMPANY IHj I) Way, Anaheim, CA 92801 714-772-6450 (STREET) (CITY) (STRFET) (CITY) JOB NUMBER I SLS. NUMBER DESCRIPTION OF WORK PERFORMED TICKET NO. _, ? x.145 ---------- DATE CUSTOMER P.O. NO. CUSTOMER PHONE NO. MAP NO. O I I B I H UNIT PRICE NET AMOUNT AN EQUAL - RTUNITY EMPLOYER (k Customer Signature NOTICE: The individual signing below TOTAL represents that he or she is signing on be- half of the owner or contractor, and that he or she has the authority to bind owner or contractor to all of the terms and cor tions set forth on the front and reverse side of this job ticket. In this regard. individual signing below acknowledges that he or she has read, understood agrees to all of the terms and conditions contained in this job ticket. Check one... FIlOwner []Contractor CUSTOMER APPROVAL: Customer desires to clean up slurry cre,Ited by Penhall with Its own force. I , uu,�1 Ili; L1-w1If, -rdispaatch. 1`�n° OO Customer has idde-energized (as necessary) all utilities. When appropriatervice has been notified Locator No. and signed. If no Stand By / Remar AN EQUAL - RTUNITY EMPLOYER (k Customer Signature NOTICE: The individual signing below TOTAL represents that he or she is signing on be- half of the owner or contractor, and that he or she has the authority to bind owner or contractor to all of the terms and cor tions set forth on the front and reverse side of this job ticket. In this regard. individual signing below acknowledges that he or she has read, understood agrees to all of the terms and conditions contained in this job ticket. Check one... FIlOwner []Contractor CUSTOMER APPROVAL: Customer desires to clean up slurry cre,Ited by Penhall with Its own force. I , uu,�1 Ili; L1-w1If, COMPANY p www.penhall.com GRADEX, INC. 12900 N MERIDIAN ST 4120 CARMEL IN 317-573-3970 46032- 317-573-3979 4697 8/24/18 003541 I 1 000006376 PENHALL COMPANY "Note New Remit To Address P.O. Box 842911 Los Angeles, CA 90084-2911 1 Gf[IVI . vuc vFW1I --.J— Information provided as required by IRC section 3406 Penhall Company TIN 33-0349226 Subject to the standard terms and conditions which are posted and may be accessed at www.penhall.com/terms-and-conditions;=scan ii1c, I'��Ob1r ,',veil 'ale „u -z0, r, 3400 E 96th street 17191 Tom Wood Powersports CARMEL CRAIG, SHAWN E Matt Burton 301 391808 133 3) 8" DIA X 6" DEEP CORED HOLES ON 8/20/18 4008560 1767.00 CONCRETE INLET BOXES (3 LOCATIONS) 4008546 (030-00 2) 22" DIA X 7" DEEP CORED HOLES 5) 20" DIA X 7" CONCRETE STRUCTURE 3) 8" DIA X 7" CONCRETE STRUCTURE ` INVOICE PAYMENTS AND QUESTIONS CAN BE EMAILED TO JSMITHBARTLETT@PENHALL.COM For billing questions please contact: 317-875-7601 $ 11767.00 _,IAei u_a 4e r%-..- 1 Gf[IVI . vuc vFW1I --.J— Information provided as required by IRC section 3406 Penhall Company TIN 33-0349226 Subject to the standard terms and conditions which are posted and may be accessed at www.penhall.com/terms-and-conditions;=scan ii1c, I'��Ob1r ,',veil 'ale „u -z0, r, w w s Q o A Q o w o o = 4 a `�' Locator No. Customer Signature 2. Stand By / Remarks: t 3. EQUIP. INSPECTION VERIFICATION NOTICE: The individual signing below 1801 Penhall Way, Anaheim, CA 92801 • 714-772-6450 CUSTOMER NAME BILLING ADDRESS iSTREETI START TIME BEGIN MEAL END MEAL END TIME TOTAL HOURS JOB ADDRESS (STREET) I certify that the hours above are accurate. I have reported (or will report as soon as possible) NEW COST. NUMBER JOB NUMBER any injury to myself, others or an accident in the workplace. I understand that any material misrepresentation is cause for discipline or termination. QUANTITY (CITY) _ (CITY) SLS. NUMBER EMPLOYEE TYPEDESCRIPTION OF WORK PERFORMED I......, _ ..._ HOURSI UNITS PRETASK PLANNING LIST HAZARDS: 4 5 6 7 8 TICKET NO. DATE CUSTOMER P.O. NO. CUSTOMER PHONE NO. ( �I MAP NO. B I H NET AML SWT FILE COPY Customer has identified, marked and de -energized (as necessary) all utilities. STRETCH AND FLEX When appropriate, the public locator service has been notified LIST PREVENTIVE MEASURES: and signed. If not, call dispatch. Locator No. Customer Signature 2. Stand By / Remarks: t 3. EQUIP. INSPECTION VERIFICATION NOTICE: The individual signing below TOTAL j "' 4. INITIAL represents that he or she is signing on be - 5. 5 FLAT SAW half of the owner or contractor, and that he -- - — 2. CORE DRILL or she has the authority to bind owner or contractor to all of the terms and condi- 6. tions set forth on the front and reverse side of this job ticket. In this regard, the 7. 3. CORE BIT individual signing below acknowledges that he or she has read, un rstood and 4. HARNESS agrees to all of the terms and conditions contained in �,, 8. 5. LANYARD Check one... L Owner _] Contractor 1 CUSTOMER APPROVAL: 0 Injuries or Accidents on this job? [] No 1 Yes 6. WALL SAW _0 U 1 Near Miss? L No L Yes (Liston backside) 7. ELECTRICAL CORD CUSTOMER INITIAL:EMPLOYEE INITIAL: 8. OTHER TRUCK ----- __ �-_.-__-- L Customer desires to clean up slurry crea -tiyf'enhalfwlth its own force. _ 9. OTHER TRAILER _ FORM MJTB-0616 FILE COPY O W 2 W F� a o o¢ i a o ¢ o w w S C13 o o r a o 1801 Penhall Way, Anaheim, CA 92801 • 714-772-6450 8. Customer has identified, marked and de -energized (as necessary) all utilities. When appropriate, the public locator service has been notified — and signed. If not, call dispatch. Locator No. Customer Signature STRETCH AND FLEX LIST PREVENTIVE MEASURES: Stand By / Remarks: 2 3. EQUIP. INSPECTION 1. FLAT SAW VERIFICATION INITIAL CUSTOMER NAME 4. _ —_— - 5. — — 2. CORE DRILL 6. - -- 3. CORE BIT 4. HARNESS 7 - 8. — 5. LANYARD Injuries or Accidents on this job? ❑ No ❑ Yes Near Miss? F1No 71 Yes (Liston backside) CUSTOMER INITIAL: _ EMPLOYEE INITIAL 6. WALL SAW 7. ELECTRICAL CORD8. OTHER TRUCK BILLING ADDRESS (STREET) (CITY) START TIME BEGIN MEAL END MEAL END TIME TOTAL HOURS JOB ADDRESS ISTREFTI (CITY) I certify that the hours above are accurate. I have reported (or will report as soon as possible) any injury to myself, others or an accident in the workplace. I understand that any material misrepresentation is cause for discipline or termination. NEW COST. NUMBER JOB NUMBER 7SLS. NUMBER EMPLOYEE SIGNATURE: NO. EQUIP. TYPE QUANTITY I HOURS1 UNITS I DESCRIPTION OF WORK PERFORMED PRETASK PLANNING LIST HAZARDS: 1. 2. 3. 4. 5. TICKET NO. DATE CUSTOMER P.O. NO. CUSTOMER PHONE NO. MAP NO. B H NET AMGUNT 6. 7. 8. Customer has identified, marked and de -energized (as necessary) all utilities. When appropriate, the public locator service has been notified — and signed. If not, call dispatch. Locator No. Customer Signature STRETCH AND FLEX LIST PREVENTIVE MEASURES: Stand By / Remarks: 2 3. EQUIP. INSPECTION 1. FLAT SAW VERIFICATION INITIAL 1 NOTICE: The individual signing below TOTAL represents that he or she is signing on be- « half of the owner or contractor, and that he or she has the authority to bind owner or contractor to all of the terms and condi- tions set forth on the front and reverse side of this job ticket. In this regard, the individual signing below acknowledges that he or she has read, understood and agrees to all of the terms and conditions contained in this job ticket. Check one... (— Owner I—. Contractor CUSTOMER APPROVAL: LJ Customer desires to clean up slurry created by Penhall with its own force. FORM NJTB-0816 4. _ —_— - 5. — — 2. CORE DRILL 6. - -- 3. CORE BIT 4. HARNESS 7 - 8. — 5. LANYARD Injuries or Accidents on this job? ❑ No ❑ Yes Near Miss? F1No 71 Yes (Liston backside) CUSTOMER INITIAL: _ EMPLOYEE INITIAL 6. WALL SAW 7. ELECTRICAL CORD8. OTHER TRUCK 9. OTHER TRAILER FILE COPY NMATERWIA A QUIKRETE® COMPANY ..--.-.sT.omEFt'P.0'NUMBEIV ... 494894 S 503471 no po GRADEX 1 GRADEX 12900 N MERIDIAN ST STE 120 16 -ENG -05 96TH & KEYSTONE CARMEL IN 46032 CARMEL IN 46032 ..--.-.sT.omEFt'P.0'NUMBEIV ... -::0RDM DAT .......... ....-DA E:D. . . . . . . . . . . . . Y UE . . . . . . ....... no po 08/07/18 1 1 09110l18 . . . . . . . . . . . ... I SHIP bA-ft::,. 6E ..... TERM 08/08/18 Net 10th Prox ')KINVCES ,j"kr AAATER...s_ A QUIXMETF' COMPANY JOB NUMBER 17-473 JOB NAME 96th & Keystone CONTRACTOR Gradex DATE 08.14.18 REV. DATE DELETION DUE TO IPL CONFLICT QUOTE PRICE STRN FINAL PRICE DESCRIPTION 485 $316.82 48" X 36" BASE ONLY DELETED DUE TO IPL CONFLICT $316.82 489 $391.05 48" X 48" BASE ONLY DELETED DUE TO IPL CONFLICT $391.05 491 $391.05 48" X 48" BASE ONLY DELETED DUE TO IPL CONFLICT $391.05 503 $292.08 48" X 32" BASE ONLY DELETED DUE TO IPL CONFLICT $292.08 507 $391.05 48" X 48" BASE ONLY DELETED DUE TO IPL CONFLICT $391.05 513 $292.08 48" X 32" BASE ONLY DELETED DUE TO IPL CONFLICT $292.08 518 $292.08 48" X 32" BASE ONLY DELETED DUE TO IPL CONFLICT $292.08 $425.00 D15POSAL FEE FOR 7 BASES ABOVE $425.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL COST OF CHANGE $2,791.21