Loading...
HomeMy WebLinkAboutBuilding Plans1 2 3 4 5 6 32 M31 y 152 L r ki 725 t �, r 750. . 159 IFN 1?• RC° ro BLOCK �,C„ 143- 25 K � �" X. 12' CP � � •' EPLACE ENDS TION CD -.=749.8)- S f , Q Q, o. �0 � � � � C 753.0 P� �� �� a. �O 51 '�, Q NO PAD V ,r - , , H / �A 01 NOTE: STAMP CURB AT TILE CONNECTIONS f / C NO PAD a ( ' 100' OF 6' SDR35 Q a PVC WITH RISER / d (/ cJrJ \� 'PRIVATE TILE' o� yy f COMMONS i s a t / BLOCK A STAMP CURB AT s f TILE CONNECTIONS .DLI E ' �;, 53 ` I NO, FAD ' �� 686 , � Fv4/ 7�0 00„ I NOTE: : STAMPCURB AT O •.TILE CONNECTIONS !' „ .It 7 s 1 2 3 4 I C) I 6 I� I 8 I 9 A CONTRACTION JOINT EVERY 20' OR LESS. - �- B 9• TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO Lo CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. co 10. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE J Ln Existing Sanitary Sewer PERFORMED IN COMPLIANCE WITH APPLICABLE O.S.H.A. STANDARDS FOR WORKER SAFETY. CD 11. CONTRACTOR SHALL MINIMIZE DAMAGE TO EXISTING TREES. 12. REMOVE AND BACKFILL ALL AREAS WHERE ANY FIELD TILE 75( CROSSES PROPOSED HOUSE PADS. ALL FIELD TILES 000 - Existing Contour INTERCEPTED TO BE PERPETUATED INTO STORM SEWER CD SYSTEM OR LAKE. THE SUBCONTRACTOR SHALL NOTIFY IN Z) x ELEV Existing Elevation WRITING THE OWNER AND THE ENGINEER IN ANY DESC U, CIRCUMSTANCES WHERE THIS CANNOT BE ACCOMPLISHED. w/ description 13. ALL FILL AREAS SHALL BE COMPACTED TO AT LEAST 95 PERCENT OF THE MAXIMUM DRY DENSITY (ASTM D-1557). FILL A 000.00 CD UNDER THE FOOTING SHALL BE COMPACTED TO AT LEAST 95 H '• U PERCENT OF THE MAXIMUM DRY DENSITY (ASTM D-1557). 000.00 All Other Finish Grades CU CU Revisions Cn 1. DCC 02/03/00: REVISED LOCATION OF STR. # 725A. CD Sanitary Structure Number 2. DCC 02/23/00: REVISED PER TAC COMMENTS. 3. BET, 03/21/00, REVISED SWALE WEST OF LOTS 55 & 56. 3 C - Flow Arrow 5. MG, 05/01/00, ADDED PRIVATE DRAINS TO LOTS 47-53. co F_ Denotes Elevation and 0 000.0 I Approximate Pad Size I' 6" Subsurface Drain E C��cr� 7 s 1 2 3 4 I 5 I 6 I 7 I 8 I 9 A CONTRACTION JOINT EVERY 20' OR LESS. - �- New Storm Sewer 9• TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO w 10 12 r- 32 31 L -Li 47 U NO PAD p O 8j ESSD * 9+96.3 ..--------- 8 , SD------------------ ------ EX. 15" RCP � I I vN EX. 18" RCP { I 33 45 x�G EX. / ly TC=7.50.12 i r i 0 EX. 21" RCP J 34 19 r ti EX. -J 35 Ay TC=749.9018 i //Y . 24" RCP \\ r r / y i 36 N, 36 ' 17 i n' / O / 7 16 i N 1 / O i / 15f 14 13 1 14 HOLEY MOLEY SAYS "DON'T DIG BLIND" 15 "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG ` 1-800-382-5544 CALL TOLL FREE PER INDIANA STATE LAW IS -69-1991. IT IS AGAINST THE LAW TO EXCAVATE W11HOUT THE UNDERGROUND LOCATION WORKINGERVICENOTIFYING TWO (2) WORKASSUMED NORTH DAYS BEFORE COMMENCING WORK. SCALE: A " 1 "_ ' C 50 11012 AMM 12421101 I M. W 1. ALL GRADES AT BOUNDARY SHALL MEET EXISTING GRADES. M 2. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO VERIFY ALL EXISTING UTILITIES AND CONDITIONS PERTAINING TO HIS PHASE OF WORK. IT SHALL ALSO BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES FOR PROPER STAKE LOCATIONS FOR EACH UTILITY BEFORE WORK IS STARTED. THE CONTRACTOR SHALL NOTIFY IN WRITING THE OWNER OR THE ENGINEER OF ANY CHANGES, OMISSIONS, OR ERRORS FOUND ON THESE PLANS OR IN THE FIELD BEFORE WORK IS STARTED OR RESUMED. 3. STANDARD SPECIFICATIONS FOR THE CITY OF CARMEL, INDIANA SHALL APPLY FOR ALL SANITARY L SEWER AND STORM SEWERS. 4. ANY PART OF THE SANITARY OR STORM SEWER TRENCHES RUNNING UNDER PAVED AREAS TO BE BACKFILLED WITH GRANULAR MATERIAL. 5. THE SIZE AND LOCATION OF EXISTING UTILITIES SHOWN ARE PER INFORMATION PROVIDED BY THE RESPECTIVE UTILITY COMPANIES. ALL UTILITY COMPANIES SHOULD BE NOTIFIED PRIOR TO ANY EXCAVATION FOR FIELD LOCATION OF SERVICES. 6. SERVICE WALKS SHALL BE NON -REINFORCED CONCRETE 4" THICK AND 4' IN WIDTH. K 7. 4' CONCRETE SERVICE WALK ACROSS FRONTAGE OF EACH LOT TO BE CONSTRUCTED BY OTHERS. 8. EXPANSION JOINTS AREA TO BE PLACED AT ALL WALK INTERSECTIONS AND BETWEEN WALKS AND PLATFORMS. SIDEWALK SCORES ARE TO BE EQUALLY SPACED BETWEEN - - 0- Existing Storm Sewer EXPANSION JOINTS, CONTRACTION JOINTS AND PERPENDICULAR TO SIDEWALKS AT 5' INTERVALS OR LESS WITH A CONTRACTION JOINT EVERY 20' OR LESS. - �- New Storm Sewer 9• TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 10. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE J Existing Sanitary Sewer PERFORMED IN COMPLIANCE WITH APPLICABLE O.S.H.A. STANDARDS FOR WORKER SAFETY. New Sanitary Sewer 11. CONTRACTOR SHALL MINIMIZE DAMAGE TO EXISTING TREES. 12. REMOVE AND BACKFILL ALL AREAS WHERE ANY FIELD TILE CROSSES PROPOSED HOUSE PADS. ALL FIELD TILES 000 - Existing Contour INTERCEPTED TO BE PERPETUATED INTO STORM SEWER SYSTEM OR LAKE. THE SUBCONTRACTOR SHALL NOTIFY IN x ELEV Existing Elevation WRITING THE OWNER AND THE ENGINEER IN ANY DESC CIRCUMSTANCES WHERE THIS CANNOT BE ACCOMPLISHED. w/ description 13. ALL FILL AREAS SHALL BE COMPACTED TO AT LEAST 95 PERCENT OF THE MAXIMUM DRY DENSITY (ASTM D-1557). FILL 000.00 New Pavement Grade UNDER THE FOOTING SHALL BE COMPACTED TO AT LEAST 95 H PERCENT OF THE MAXIMUM DRY DENSITY (ASTM D-1557). 000.00 All Other Finish Grades Storm Structure Number Revisions 1. DCC 02/03/00: REVISED LOCATION OF STR. # 725A. 000 Sanitary Structure Number 2. DCC 02/23/00: REVISED PER TAC COMMENTS. 3. BET, 03/21/00, REVISED SWALE WEST OF LOTS 55 & 56. 4. DCC, 04/27/00, ADDED 6" PRIVATE TILES FOR LOTS 51-53 PER KATE BOYLE. - Flow Arrow 5. MG, 05/01/00, ADDED PRIVATE DRAINS TO LOTS 47-53. G F_ Denotes Elevation and 000.0 I Approximate Pad Size 6" Subsurface Drain E C��cr� • .. -� Swale (F0 F --'v!, -----+--►•- Water Main BENCF]MARK TBM #1 USGS BENCHI ARK DISK STAMPED "95 REP" IN CONCRETE POST t1' ABOVE GROUND AT THE NW CORNER OF 131st & RIVER ROAD. ELEVATON = 751.46 13 1 14 1 15 if ���G�STERF y N0. 9800085 - STATE OF O• E S,Sn�NA1L CERTIFIED BY Z�71o� THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE OR IN D PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. 2000, The Schneider Corporation r � The Schneider Corporation 12726 Hamilton Crossing Blvd. Engineering Carmel, Indiana Surveying 46032 Landscape Architecture 317-574-3797 GIS o LIS 317-574-3799 Fax Geology Formerly Schneider Engineering Corp. / Bohlen, Meyer, Gibson & Assoc. BDC/CARDINAL ASSOCIATES, LP. BROOKS LANDING AT PRAIRIE VIEW SEC. 2 B CARMEL, INDIANA DEVELOPMENT PLAN Date Project No. Drawn Approv. 101/20/00 1065.22 DCC Computer Files Sheet No. A J: \1065\DWGS\22\C101.DWG XREF: 22BASE,DWG XREF: 21 BASE.DWG XREF: 11BASE.DWG, 23BASE.DWG XREF: 12ABASE.DWG, 24BASE.DWG XREF: 1065TOPO.DWG d b 4 h j i j 4 h m r r 1 1 .tee. a'y i i f J f