Loading...
HomeMy WebLinkAboutCOMCHECK - Flix Brewhouse Expansion (Carmel, IN)COMcheck Software Version 4.0.8.2 Interior Lighting Compliance Certificate Project Title: 90.1 (2007) Standard Project Type: Alteration Construction Site: 2206 E 116th Street Carmel, IN Owner/Agent: Designer/Contractor: Mark Nordmeyer Verdant Engineering, LLC 8949 Lfayette Road Indianapolis, IN 46278 317-446-1651 mnordmeyer@verdant-engr.com Project Information Energy Code: Flix Brewhouse Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-Motion Picture Theater:Audience/Seating Area 1500 1.20 1800 2-Common Space Types:Classroom/Lecture/Training 460 1.40 644 Total Allowed Watts = 2444 Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures Motion Picture Theater:Audience/Seating Area (1500 sq.ft.) LED 1: LED MR 4W: 3 4 12 48 LED 2: LED Other Fixture Unit 90W: 1 3 90 270 LED 3: LED Other Fixture Unit 90W: 1 1 90 90 Common Space Types:Classroom/Lecture/Training (460 sq.ft.) LED 4: LED Panel 44W: 1 4 42 168 Total Proposed Watts = 576 Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.0.8.2 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date COMcheck Software Version 4.0.8.2 Mechanical Compliance Certificate Project Title: 90.1 (2007) Standard Project Type: Alteration Location: Carmel, Indiana Climate Zone: 5a Construction Site: 2206 E 116th Street Carmel, IN Owner/Agent: Designer/Contractor: Mark Nordmeyer Verdant Engineering, LLC 8949 Lfayette Road Indianapolis, IN 46278 317-446-1651 mnordmeyer@verdant-engr.com Project Information Energy Code: Flix Brewhouse Mechanical Systems List Quantity System Type & Description Split System Heat Pump Heating Mode: Capacity = 22 kBtu/h, Proposed Efficiency = 10.00 HSPF, Required Efficiency = 7.70 HSPF Cooling Mode: Capacity = 18 kBtu/h, Proposed Efficiency = 20.00 SEER, Required Efficiency: 13.00 SEER Fan System: None SYSTEM VERIFICATION REQUIRED. 1 HVAC System 1 Cooling: 1 each - VRF Zone Fan Unit, Capacity = 9 kBtu/h No minimum efficiency requirement applies Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 320 CFM, 0.2 motor nameplate hp SYSTEM VERIFICATION REQUIRED. 1 HVAC System 2 Cooling: 1 each - VRF Zone Fan Unit, Capacity = 9 kBtu/h No minimum efficiency requirement applies Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 320 CFM, 0.2 motor nameplate hp SYSTEM VERIFICATION REQUIRED. 1 HVAC System 3 Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.0.8.2 and to comply with any applicable Project Title: Data filename: Flix Brewhouse C:\Projects\Flix Brewhouse Carmel\design\COMCheck\Untitled.cck Report date: 08/07/18 Page 2 of 11 mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: Flix Brewhouse C:\Projects\Flix Brewhouse Carmel\design\COMCheck\Untitled.cck Report date: 08/07/18 Page 3 of 11 Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.0.8.2 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 90.1 (2007) Standard Section # & Req.ID Plan Review Complies? Comments/Assumptions 4.2.2, 6.4.2 [PR2]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Complies Does Not Not Observable Not Applicable Requirement will be met. 4.2.2, 7.4.1 [PR3]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Complies Does Not Not Observable Not Applicable Requirement will be met. 4.2.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Section # & Req.ID Footing / Foundation Inspection Complies? Comments/Assumptions 6.4.3.8 [FO9]3 Freeze protection and snow/ice melting system sensors for future connection to controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Flix Brewhouse C:\Projects\Flix Brewhouse Carmel\design\COMCheck\Untitled.cck Report date: 08/07/18 Page 5 of 11 Section # & Req.ID Mechanical Rough-In Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions 6.4.1.4, 6.4.1.5 [ME1]2 HVAC equipment efficiency verified. Non-NAECA HVAC equipment labeled as meeting 90.1. Efficiency:_____ Efficiency:_____ Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. 6.4.3.4.1 [ME3]3 Stair and elevator shaft vents have motorized dampers that automatically close. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.4.3.4.2, 6.4.3.4.3, 6.4.3.4.4 [ME4]3 Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.4.5 [ME5]3 Ventilation fans >0.75 hp have automatic controls to shut off fan when not required. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.9 [ME6]1 Section # & Req.ID Mechanical Rough-In Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions 6.5.2.3 [ME19]3 Dehumidification controls provided to prevent reheating, recooling, mixing of hot and cold airstreams or concurrent heating and cooling of the same airstream. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.5.4.1 [ME25]3 HVAC pumping systems >10 hp designed for variable fluid flow. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.5.6.1 [ME30]1 Exhaust air energy recovery on systems >=5,000 cfm and 70% of design supply air. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.7.1 [ME32]2 Kitchen hoods >5,000 cfm have make up air >=50% of exhaust air volume. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.7.2 [ME33]1 Fume hoods exhaust systems >=15,000 cfm have VAV hood exhaust and supply systems, direct make-up air or heat recovery. Section # & Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions 9.4.1.1 [EL1]2 Automatic controls to shut off all building lighting installed in buildings >5,000 ft2. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.1.2 [EL2]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.1.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.2 [EL5]3 Ballasted one and three lamp fixtures with >30 W/lamp have two lamp tandem wired ballasts when >=2 fixtures in same space on same control. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.6.2 [EL8]1 Additional interior lighting power allowed for special functions per the Section # & Req.ID Final Inspection Complies? Comments/Assumptions 6.4.3.1.1 [FI2]2 Heating and cooling to each zone is controlled by a thermostat control. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.1.2, 6.4.3.2, 6.4.3.3, 6.4.3.3.1, 6.4.3.3.2 [FI3]2 Thermostatic controls have a 5 °F deadband. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.5 [FI5]3 Heat pump controls prevent supplemental electric resistance heat from coming on when not needed. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.7 [FI6]3 When humidification and dehumidification are provided to a zone, simultaneous operation is prohibited. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.1 [FI7]3 Furnished HVAC as-built drawings submitted within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.2 [FI8]3 Furnished O&M manuals for HVAC Section # & Req.ID Final Inspection Complies? Comments/Assumptions 6.4.3.3.1 [FI21]1 HVAC systems equipped with at least one automatic shutdown control. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.3.2 [FI22]1 Setback controls allow automatic restart and temporary operation as required for maintenance. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Flix Brewhouse C:\Projects\Flix Brewhouse Carmel\design\COMCheck\Untitled.cck Report date: 08/07/18 Page 10 of 11 Project Title: Data filename: Flix Brewhouse C:\Projects\Flix Brewhouse Carmel\design\COMCheck\Untitled.cck Report date: 08/07/18 Page 11 of 11 systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.3 [FI9]1 An air and/or hydronic system balancing report is provided for HVAC systems serving zones >5,000 ft2 of conditioned area. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.7.2.4 [FI10]1 HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Complies Does Not Not Observable Not Applicable Requirement will be met. 8.7.1 [FI16]3 Furnished as-built drawings for electric power systems within 30 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 8.7.2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.2.2.3 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. 6.4.3.2 [FI20]1 Temperature controls have setpoint overlap restrictions. Complies Does Not Not Observable Not Applicable Requirement will be met. 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Flix Brewhouse C:\Projects\Flix Brewhouse Carmel\design\COMCheck\Untitled.cck Report date: 08/07/18 Page 9 of 11 approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. 10.4.1 [EL9]2 Electric motors meet requirements where applicable. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Flix Brewhouse C:\Projects\Flix Brewhouse Carmel\design\COMCheck\Untitled.cck Report date: 08/07/18 Page 8 of 11 Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.8.1 [ME34]3 Unenclosed spaces that are heated use only radiant heat. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Flix Brewhouse C:\Projects\Flix Brewhouse Carmel\design\COMCheck\Untitled.cck Report date: 08/07/18 Page 7 of 11 Demand control ventilation provided for spaces >500 ft2 and >40 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.1.1 [ME7]3 Insulation exposed to weather protected from damage. Insulation outside of the conditioned space and associated with cooling systems is vapor retardant. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.1.2 [ME8]2 HVAC ducts and plenums insulated. R-_____ R-_____ Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.1.3 [ME9]2 HVAC piping insulation thickness. _____ in. _____ in. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.2.1 [ME10]2 Ducts and plenums sealed based on static pressure and location. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.2.2 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.4.4.2.2 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.4.4.2.2 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Flix Brewhouse C:\Projects\Flix Brewhouse Carmel\design\COMCheck\Untitled.cck Report date: 08/07/18 Page 6 of 11 Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.4 [PR5]1 Detailed instructions for HVAC systems commissioning included on the plans or specifications for projects >=50,000 ft2. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 8.4.1.1, 8.4.1.2 [PR6]2 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the electrical systems and equipment and document where exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: Flix Brewhouse C:\Projects\Flix Brewhouse Carmel\design\COMCheck\Untitled.cck Report date: 08/07/18 Page 4 of 11 Interior Lighting PASSES Project Title: Data filename: Flix Brewhouse C:\Projects\Flix Brewhouse Carmel\design\COMCheck\Untitled.cck Report date: 08/07/18 Page 1 of 11