HomeMy WebLinkAboutCJ181033.0184FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
CJ181033.0184
12/06/18
12/13/18
7770 W New York St
Indianapolis, IN 46214-2988
317-273-1690
Client
Gibraltar Construction Corp
Attn: Douglas Perry
2932 N Webster Ave
Indianapolis, IN 46219
West Park: The Groves
3030 West 116th St.
Carmel, IN 46032
Project
Project Number: CJ181033
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description (pcf)Test Method
1 132.59.5CJ181033.0065 No. 53 Stone
2 132.59.5CJ181033.0065 No. 53 Stone
Field Test Data
No.Test Location Elev.No.
Test Lift /Mat.Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in)(pcf)(pcf)(pcf)
East Corner of Building
1 20' East of corner of building 10'
South of bridge footing
6 1 4 136.5 8.3 6.5 128.2 96.8
" "
2 5' South of bridge footing 10'
West of East edge
6 1 4 134.1 7.6 6.0 126.5 95.5
Comments:
Datum:
Last Cal. Date:Model:Make:S/N:19641 Troxler 3440 12/08/2017
Perform in-place density and moisture content tests to determine degree of compaction and material moisture
condition.
Services:
Reported To:
Contractor:
Ron Hueston with Gibraltar Construction
Jeremy Clem
Project Manager
Report Distribution:
(1) Gibraltar Construction Corp, Douglas Perry (1) City of Carmel IN, Mike Sheeks
(1) Johnson Wilbur Adams, Inc., Michael Wilbur (1) Smith Group JJR, Jessie Fink
Reviewed By:
Earth Exploration, Inc. Rep.: Jamie Conwell
ASTM D6938Test Methods:
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
DAILY SUMMARY REPORT
Report Number:CJ181033.0184
Service Date:12/06/18 7770 W New York St
Report Date:12/13/18 Indianapolis, IN 46214-2988
317-273-1690
Client Project
Gibraltar Construction Corp West Park: The Groves
Attn: Douglas Perry 3030 West 116th St.
2932 N Webster Ave Carmel, IN 46032
Indianapolis, IN 46219
Project Number: CJ181033
Services: Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition.
Earth Exploration, Inc. Rep.: Jamie Conwell
Reported To:Ron Hueston with Gibraltar Construction
Contractor:
Report Distribution:
(1) Gibraltar Construction Corp, Douglas
Perry
(1) City of Carmel IN, Mike Sheeks
(1) Johnson Wilbur Adams, Inc., Michael Wilbur (1) Smith Group JJR, Jessie Fink Reviewed By:____________________________________
Jeremy Clem
Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0001, 10-16-13, Rev.10 Page 1 of 1
FOUNDATION OBSERVATIONS
All tests meet specifications See Foundation Observation Report for details
Some tests do not meet specifications See Construction Observation Report
All tests do not meet specifications None Performed
IN-PLACE DENSITY TESTS
All tests meet specifications See In-Place Density Test Report for details
Some tests do not meet specifications Passing retests obtained
All tests do not meet specifications None performed
CONCRETE, GROUT, MORTAR SAMPLING/TESTS
Tests performed:Slump
Slump
Entrained Air Temperature Unit Wt.Yield
Number of specimens cast Total Quantity Yd3
Specimen Type:Cylinders Beams Motar Cubes Grout
Prisms Other
None Performed
ASPHALT SAMPLING/TESTS
Tests performed:Nuclear Density Temperature Thickness Bulk Sampling
Number of Tests Total Quantity Tons
Core Sampling Number of Cores Marshall Density Extraction/Gradation
None Performed Stability / Flow
Weather: Cloudy, 30’sd
See attached In Place Density Report.