Loading...
HomeMy WebLinkAboutDaily Field Report_2018.10.19Contractor: JG Morris Weather: Sunny Temperature (°F): Arrival Time: 13:00 Departure Time: 14:00 ATC Rep: Filley, Nicolas Date: 10/19/2018 A. Description of Work: Proofroll B. Location Details: Building pad C. Tests Performed: Proofroll D. Equipment and Crew: Fully Loaded Tri Axle E. Problems/Non­Compliance/Failing Tests Discrepancy Number Non­Compliance Who Advised Status Resolution Description 2 Soft soils showing excessive pumping and rutting Project Manager Open Specs. Available On­Site: Yes No Plans Available On­Site: Yes No Request for other information; specs./plans, mill certifications, details or manufacturer's literature: Remarks or Comments: The ATC representative arrived on site at 13:00 as requested by JG Morris. Upon arriving at site, ATC representative checked in with JG Morris. ATC representative was informed of work requiring testing and inspections. The area being proof­rolled included entire building pad. The equipment utilized for proof­rolling consisted of fully loaded tri axle. Soft soil conditions were observed at the east side of the building pad. The soft sub­grade soils were silty sand. Due to excessive pumping and deflection, the ATC engineer was notified. It is our recommendation that the soils be aerated and allowed to dry. The area was not approved. Any rainfall event that occurs after the proof­roll observation may impact the condition of any exposed sub­grade. It is our recommendation that if a rainfall event occurs after the proof­roll observation, the soils should be re­evaluated by ATC prior to further work. Before departing the site, ATC representative notified JG Morris of field inspection results. ✔ ✔ Daily Field Report Report #: DRPO­000003 7988 Centerpoint Drive Suite 100 Indianapolis, IN 46256 Phone: 317­579­4031 Fax: 317­849­4278 Client: J G Morris Construction ., . ., YY . Project: 170MT00382 Belle Tire, Carmel Page 1 of 2 1