HomeMy WebLinkAboutDaily Field Report_2018.11.02Contractor: Dotlitch
Weather: Cloudy Temperature (°F): 60
Arrival Time: 09:00 Departure Time: 11:30
ATC Rep: Brown, John
Date: 11/02/2018
A. Description of Work: Excavating B. Location Details: North side
C. Tests Performed: DCP'S
Pocket pen
D. Equipment and Crew: Na
E. Problems/NonCompliance/Failing Tests
Discrepancy
Number
NonCompliance Who Advised Status Resolution Description
3 Soft soils were present in the pond
area in the north west corner of the
site.
Dotlitch Open
Specs. Available OnSite: Yes No Plans Available OnSite: Yes No
Request for other information; specs./plans, mill certifications, details or manufacturer's literature:
Remarks or Comments:
The ATC representative arrived on site at 09:00am as requested by Morris. Upon arriving at site, ATC representative checked in with
Dotlitch. ATC representative was informed of work requiring testing and inspections.
Blows
2 blows in 6" four times
Moved to another spot.
2 blows in 6"
Pocket pen results
.5
.5
1.5
.5
1.5
1.
1.5
Before departing the site, ATC representative notified Dotlitch of field inspection results.
✔ ✔
Daily Field Report Report #: DRPO000004
7988 Centerpoint Drive
Suite 100
Indianapolis, IN 46256
Phone: 3175794031
Fax: 3178494278
Client:
J G Morris Construction
., .
., YY .
Project:
170MT00382
Belle Tire, Carmel
Page 1 of 2 1