HomeMy WebLinkAboutA000.4TOP OF FOUNDATION
TOP OF FLOOR
TOP OF PLATE
WINDOW HEAD HGT.
WINDOW HEAD HGT.
TOP OF PLATE
TOP OF FLOOR
\A1;10'-1{\H0.750000x;\S1#8;}"\A1;8'-2{\H0.750000x;\S7#8;}"
\A1;9'-1{\H0.750000x;\S1#8;}"\A1;8'-2{\H0.750000x;\S7#8;}"
1210
1210
1210
ROOF SHINGLES, PER SPEC
BRICK VENEER, PER SPEC
6" FASCIA BOARD, PER SPEC3" TRIM ON A 10" FRIEZE BOARD, PER SPEC
BRICK VENEER, PER SPEC
8" STONE ARCH, PER SPEC
STONE SILL, PER SPEC
ROOF SHINGLES, PER SPEC
BRICK ROWLOCK SILL PER SPEC.
1210
FYPON DTLB6x6x5 OR APPROVED EQUAL
\A1;1'-4"
1210
1210 1210
\A1;5'-6"\A1;6'-0"
\A1;1'-2"
SCALE:FRONT ELEVATION1/4" = 1'-0"
1210
SCALE:REAR ELEVATION1/8" = 1'-0"-
\A1;10'-1{\H0.750000x;\S1#8;}"\A1;8'-2{\H0.750000x;\S7#8;}"
\A1;9'-1{\H0.750000x;\S1#8;}"\A1;8'-2{\H0.750000x;\S7#8;}"
TOP OF FOUNDATION
TOP OF PLATE
TOP OF PLATE126126
126 1210
1210
126
120.5
SCALE:LEFT ELEVATION1/8" = 1'-0"-
126126
126
1261261210
1210 126
SCALE:RIGHT ELEVATION1/8" = 1'-0"-
SCALE:ROOF PLAN1/8" = 1'-0"-
\A1;1'-0"\PTYP.\A1;1'-0"\PTYP.
\A1;1'-0"\PTYP.
\A1;1'-0"\PTYP.
\A1;1'-0"\PTYP.
\A1;1'-0"\PTYP.\A1;1'-0"\PTYP.\A1;1'-0"\PTYP.
\A1;4'-0"
10:12
10:12
6:12
6:12
6:12
6:126:126:12
6:12
6:12
10:12
10:1210:1210:12
10:12
4:12
4:12
10:12
ROOF AREASQ. FT."B"254ROOF AREASQ. FT."A"2491
ROOF AREASQ. FT."C"331
4:124:12
0.5:12
ELEVATION FE3G
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 2491 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 3.32 4.15 4.24 50.41 10 0
AT EAVE 4.98 4.15 4.17 49.59 0 60.00
TOTAL (MIN)8.30 8.30 8.40 100.00
3
HIGH -
RIDGE VENT 3.32 4.15 4.25 50.50 0 0 34.00
AT EAVE 4.98 4.15 4.17 49.50 0 60.00
TOTAL (MIN)8.30 8.30 8.42 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION FE3G
ROOF AREA "B"SQ FTG 254 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 0.34 0.42 0.00 0.00 0 0
AT EAVE 0.51 0.42 0.90 100.00 0 13.00
TOTAL (MIN)0.85 0.85 0.90 100.00
3
HIGH -
RIDGE VENT 0.34 0.42 0.00 0.00 0 0 0.00
AT EAVE 0.51 0.42 0.90 100.00 0 13.00
TOTAL (MIN)0.85 0.85 0.90 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ROOF AREA "C"SQ FTG 331 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 0.44 0.55 0.56 44.44 0 2
AT EAVE 0.66 0.55 0.69 55.56 0 10.00
TOTAL (MIN)1.10 1.10 1.25 100.00
3
HIGH -
RIDGE VENT 0.44 0.55 0.50 41.86 0 0 4.00
AT EAVE 0.66 0.55 0.69 58.14 0 10.00
TOTAL (MIN)1.10 1.10 1.19 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION FE3G
...........................
PLAN NAME
SHEET
PRODUCTION MANAGER
DATE / DESCRIPTION
NPC PLAN NUMBERLAWSON PLAN ID
GARAGE HANDING
REV #
NOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS
INITIAL RELEASE DATE:CURRENT RELEASE DATE:
(c) Copyright Pulte Home Corporation - 2018
Joel Hampshire03/01/2016
Right
Skyview
2056.300.00.CPM
LOT 199
06/13/20181900 E. Golf Road, - Suite 300Schaumburg, Illinois 60173Midwest Zone OfficePLOTTED: October 29, 2018 / Annie Lee / 2056-SKYVIEW-IN-WCLY-EL-FE3G.DWG
A3-FE3G
3SB.1French Eclectic3 Car GarageFront, Side and Rear Elevations, Roof Plan and Ventilation Schedule12/03/18
Mike Sheeks