Loading...
HomeMy WebLinkAboutA000.4TOP OF FOUNDATION TOP OF FLOOR TOP OF PLATE WINDOW HEAD HGT. WINDOW HEAD HGT. TOP OF PLATE TOP OF FLOOR \A1;10'-1{\H0.750000x;\S1#8;}"\A1;8'-2{\H0.750000x;\S7#8;}" \A1;9'-1{\H0.750000x;\S1#8;}"\A1;8'-2{\H0.750000x;\S7#8;}" 1210 1210 1210 ROOF SHINGLES, PER SPEC BRICK VENEER, PER SPEC 6" FASCIA BOARD, PER SPEC3" TRIM ON A 10" FRIEZE BOARD, PER SPEC BRICK VENEER, PER SPEC 8" STONE ARCH, PER SPEC STONE SILL, PER SPEC ROOF SHINGLES, PER SPEC BRICK ROWLOCK SILL PER SPEC. 1210 FYPON DTLB6x6x5 OR APPROVED EQUAL \A1;1'-4" 1210 1210 1210 \A1;5'-6"\A1;6'-0" \A1;1'-2" SCALE:FRONT ELEVATION1/4" = 1'-0" 1210 SCALE:REAR ELEVATION1/8" = 1'-0"- \A1;10'-1{\H0.750000x;\S1#8;}"\A1;8'-2{\H0.750000x;\S7#8;}" \A1;9'-1{\H0.750000x;\S1#8;}"\A1;8'-2{\H0.750000x;\S7#8;}" TOP OF FOUNDATION TOP OF PLATE TOP OF PLATE126126 126 1210 1210 126 120.5 SCALE:LEFT ELEVATION1/8" = 1'-0"- 126126 126 1261261210 1210 126 SCALE:RIGHT ELEVATION1/8" = 1'-0"- SCALE:ROOF PLAN1/8" = 1'-0"- \A1;1'-0"\PTYP.\A1;1'-0"\PTYP. \A1;1'-0"\PTYP. \A1;1'-0"\PTYP. \A1;1'-0"\PTYP. \A1;1'-0"\PTYP.\A1;1'-0"\PTYP.\A1;1'-0"\PTYP. \A1;4'-0" 10:12 10:12 6:12 6:12 6:12 6:126:126:12 6:12 6:12 10:12 10:1210:1210:12 10:12 4:12 4:12 10:12 ROOF AREASQ. FT."B"254ROOF AREASQ. FT."A"2491 ROOF AREASQ. FT."C"331 4:124:12 0.5:12 ELEVATION FE3G ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 2491 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 3.32 4.15 4.24 50.41 10 0 AT EAVE 4.98 4.15 4.17 49.59 0 60.00 TOTAL (MIN)8.30 8.30 8.40 100.00 3 HIGH - RIDGE VENT 3.32 4.15 4.25 50.50 0 0 34.00 AT EAVE 4.98 4.15 4.17 49.50 0 60.00 TOTAL (MIN)8.30 8.30 8.42 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION FE3G ROOF AREA "B"SQ FTG 254 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 0.34 0.42 0.00 0.00 0 0 AT EAVE 0.51 0.42 0.90 100.00 0 13.00 TOTAL (MIN)0.85 0.85 0.90 100.00 3 HIGH - RIDGE VENT 0.34 0.42 0.00 0.00 0 0 0.00 AT EAVE 0.51 0.42 0.90 100.00 0 13.00 TOTAL (MIN)0.85 0.85 0.90 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ROOF AREA "C"SQ FTG 331 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 0.44 0.55 0.56 44.44 0 2 AT EAVE 0.66 0.55 0.69 55.56 0 10.00 TOTAL (MIN)1.10 1.10 1.25 100.00 3 HIGH - RIDGE VENT 0.44 0.55 0.50 41.86 0 0 4.00 AT EAVE 0.66 0.55 0.69 58.14 0 10.00 TOTAL (MIN)1.10 1.10 1.19 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION FE3G ........................... PLAN NAME SHEET PRODUCTION MANAGER DATE / DESCRIPTION NPC PLAN NUMBERLAWSON PLAN ID GARAGE HANDING REV # NOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS INITIAL RELEASE DATE:CURRENT RELEASE DATE: (c) Copyright Pulte Home Corporation - 2018 Joel Hampshire03/01/2016 Right Skyview 2056.300.00.CPM LOT 199 06/13/20181900 E. Golf Road, - Suite 300Schaumburg, Illinois 60173Midwest Zone OfficePLOTTED: October 29, 2018 / Annie Lee / 2056-SKYVIEW-IN-WCLY-EL-FE3G.DWG A3-FE3G 3SB.1French Eclectic3 Car GarageFront, Side and Rear Elevations, Roof Plan and Ventilation Schedule12/03/18 Mike Sheeks