HomeMy WebLinkAboutBuilding Permit InfoCARMEL / C LAY TOWNS H I P
DEPARTMENT OF COMMUNITY DEVELOPMENT
Bui3La:L p: Permit Information
CARMEL ZONING ORDINANCE Z-160, SECTION 29.4.2(3): THE BUILDING COMMISSIONER (DIRECTOR,
DEPT. OF COMMUNITY DEVELOPMENT OR STAFF) SHALL APPROVE OR DENY THE IMPROVEMENT LOCATION
PERMIT (BUILDING PERMIT) WITHIN FIVE (5) WORKING DAYS OF THE RECEIPT OF THE WRITTEN
APPLICATION FORM AND ACCOMPANYING MATERIALS. THE IMPROVEMENT LOCATION PERMIT (BUILDING
PERMIT) SHALL BE ISSUED WHEN THE PROPOSED STRUCTURE, IMPROVEMENT OR USE AND ITS LOCATION
CONFORM IN ALL RESPECTS TO THIS ORDINANCE.
The following must be received by the Department of Community Development before an
building_ or remodeling permit can be reviewed or issued by the staff:
1. A completed Improvement Location Permit application.
2. Two (2) complete sets of construction plans. In compliance with the State Energy
Code, must list R -values on walls, ceilings, etc. If a commercial construction,
plans must be stamped approved by the Indiana State Department of Fire_
Prevention and Building Safety.
3. A copy of sewer permit (from City of Carmel Engineering Dept. or Hamilton
Western Utilities, whichever applies) or septic permit (Hamilton County Health
Department).
4. Three (3) copies of a site or plot plan showing the following REQUIRED
information (can be obtained from the landowner or land developer):
Lot drawn to scale !
All dimensions 1
Scale and North arrow
- All roads, alleys, right-of-ways, etc.
- All other utilities and drainage right-of-ways_and.easements
- Any applicable flood plain area
- Building pad elevation and lot corner elevations
- All accessory buildings -- existing or proposed
- All sidewalks and driveways
Sewer and water lines, septic system and well location
- Drainage flow arrows
- All drainage swales and subsurface facilities (retention/detention areas, etc)
Dimensional cross sections of all drainage swales
Sump pump (sump pump pits) showing discharge locations
- Geothermal heat pump discharge locations
Drainage Swales: All required drainage swales must be shown on the plot plan
and constructed in .all subdivisions prior to the Department of Community
Development -performing a final inspection of any structure per plans on file.
or per the following: Constructed swales shall be a minimum of 1'6" deep
with side slopes of not less than 4 to 1.
If this information is not submitted, it will extend the time it takes to get an.approved
building permit.
I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY AND ACCURATELY
ON THE ATTACHED PLOT OR SITE PLAN AS SUBMITTED WITH A BUILDING PERMIT APPLICATION TO THE
CARMEL/CLAY DEPARTMENT OF COMMUNITY DEVELOPMENT.
SIGNATURE:
NAME OF PLUMBING CONTRACTOR: (If Applicable)
VALID STATE PLUMBING LICENSE NUMBER: i