HomeMy WebLinkAboutMinutes PC 11-20-18 Susan Westermeier: Before PUDs existed,the options for this would be S-1,or ask for a rezone. What did we do prior
to this? Tim Ochs: You would have to pursue a Variance from the BZA and then file for your plat approval or rezone.
Susan: Are you more comfortable with this being a PUD then doing an S-1 with variances? Alexia: Yes,we are
comfortable with the PUD because you get more architecture standards and buffers that aren't normally required.
Susan: I want to see the density reduced and the lots made larger. The entrance off of Ditch Road is too close to the
roundabout. We will ask more questions about drainage and traffic at the Residential Committee
A motion made by Josh Kirsh,and seconded by Susan Westermeier to send Docket No. 18100001 PUD to
Residential Committee on December 4,2018,with final approval for Full Plan Commission
Motion passes 8-0, 1 absent Casati
2. Docket No. 18090010 OA: Legacy PUD Amendment
The applicant seeks approval to amend the Legacy PUD text in order to adjust the maximum residential unit
limitations and specify the location and facilities for the amenity area. The site is located south of 146th Street
and west of River Road. It is zoned Legacy PUD Z-501-07. Filed by Nelson&Frankenberger, LLC on behalf of
Platinum Properties.
Petitioner: Jon Dobosiewicz:
• The Legacy PUD was approved by City Council in January 2007
• The amended PUD will provide more clarity regarding the amenity area and to modify the max.unit limitations
• The original PUD does not provide for a specific location or site plan for the amenity area.The amended PUD
will provide this info.
• Referring to the map,the proposed location of the amenity area will be centrally located in the development
• The amenities would require swimming pool,and a bath house with changing rooms and storage
• Also required in the amended PUD are a pavilion, picnic area, sport court,playground, and a parking area
• The amended PUD provides a time frame for construction to be completed by May 15, 2020 provided that Cherry
Tree Blvd is completed by June 30,2019. For every day this road is delayed,the developer will be allowed an
additional day to construct the amenity area.
• We would ask for any recommendations from the Plan Commission and counsel,to include any text about the
timeline completions
• The ordinance specifies the common areas that are currently irrigated directly by well water to be connected to
City of Carmel water services for irrigation purposes
• The central wooded area will be preserved
• The amended PUD reduces the max number of all types of dwellings from 1344 units to 1250 units. The number
of attached homes will reduce from 500 to 476. The number of permitted apartment units will be increased from
300 to 389.
• Staff is in support and we ask the Plan Commission to forward onto City Council
Public Comments:
Sue Finkam, City Council member: I'm in full support. I represent the area that the Legacy resides in. The residents
are in support. What's really important to the residents is the amenity center trigger date. There's no trigger date until
the PUD is completely finished. I support this going straight to Council.
Department Report: Alexia Lopez
• The petitioner has addressed all of our comments
• They are not increasing the total number of units permitted
• The location of the apartments is not changing
• We reviewed the additional wording that Mr.Dobosiewicz presented this evening and we are comfortable with it
• We recommend you suspend the Rules of Procedure and forward it onto the City Council
Committee Comments:
Josh Kirsh: Is there a long term plan for rehab and upkeep of the amenity area? Jon Dobosiewicz: Yes. Josh: Does
this amenity area meet the needs for the neighborhood or just puts a check in the box? Jon: The amenities being
6
Plan Commission Minutes 11-20-18
proposed exceed those that are required today in the existing ordinance. Josh: Does this pool meet the needs? Jon:
Paul Rioux, from Platinum Properties,analyzed the size of pool that is required. The pool is 1900 sq. ft.which is a bit
larger compared to other similar neighborhoods. This will satisfy the needs of the neighborhood. Josh: Bike parking?
Jon: There will be bike parking if there's not already.
Brad Grabow: With the increase in multi-family units from 300 to 389,how many exist today? Jon Dobosiewicz: 300
authorized, and 269 are constructed. The additional 89 will allow an additional 120 apartments to be constructed. It will
authorize them,not require it. Brad: Is there something driving the increase of multi-units? Jon: 120 is the number the
developer feels is necessary to accommodate additional development in this area.
A motion by Josh Kirsh,and seconded by Laura Campbell to suspend the Rules of Procedure.
Motion passes 8-0, 1 absent Casati
A motion made by Brad Grabow and seconded by Josh Kirsh to forward Docket No. 18090010 OA with a
favorable recommendation to City Council. Motion passes 8-0, 1 absent Casati
3. TABLED TO DEC. 18—Docket No. 18090012 Z: Sherman Drive Townhomes Rezone
a
DeVault,LLP on behalf of AZR Haver LLC.
4. TABLED TO DEC. 18—Docket No. 18090013 DP/ADLS: Sherman Drive Townhomes
Kriog DeVault,LLP on behalf of AZR Haver LLC.
5. Docket No. 18090015 DP/ADLS: Onyx Office Suites
The applicant seeks site plan and design approval for a new,two story office building,totaling 31,808 sq. ft. It
will be about 30' tall with 132 parking spaces provided. The site is located at 10439 Commerce Drive.It is zoned
B-SBusiness and is not located within any overlay zone.Filed by David Klain of D.B.Klain.
Petitioner: Mark Thorpe,Weihe Engineers:
• There are existing offices to the north of the location
• There are existing detention ponds to the east and south of the location
• Ashbrooke subdivision is on the other side of the detention pond
• This will tie into the office development to the north
• We are pleased with the appearance of the proposed building that will face Commerce Drive
Public Comments:
Tom Behringer,lives across the pond,just south of the proposed building: We look at this property everyday out of our
back window. I think the landscaping packaging is solid. I don't have any problems with it.
Department Report: Rachel Keesling
• This building would complete the Coastal Corporate Center office development
• A vehicular connection will be provided to the existing office center along the west side of the property
• They are proposing 132 parking spaces,when 106 are required
• They are proposing 8 bike spaces,when 4 are required
• There will be a new asphalt path installed along Commerce Drive and will connect this site to 106th street
• They are proposing 56.4%lot coverage,when 75%is allowed
• The building will have a modern design,with stone,brick,and a mix of horizontal siding
• The Urban Forester has approved the landscape plan
• The site lighting meets the requirements of the UDO
• The signage proposed is both a ground and an awning sign
• We recommend to send this to the Commercial Committee on Dec.4 with them having final voting authority