HomeMy WebLinkAboutC3.0 - SWPPP PlanTOPOGRAPHIC & BOUNDARY NOTE ALL EXISTING HORIZONTAL AND VERTICAL INFORMATION HAS BEEN SHOWN PER AN ALTA/NSPS LAND TITLE SURVEY PREPARED BY SEA GROUP, LLC. DATED 05/24/2018; THEREFORE, CIVIL SITE GROUP, INC. CANNOT BE HELD RESPONSIBLE IF ACTUAL HORIZONTAL AND VERTICAL DATA IS DIFFERENT FROM THAT SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO COMMENCING WITH CONSTRUCTION. THESE DRAWINGS REFLECT ABOVE GROUND INDICATIONS OF EXISTING UTILITIES. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. GENERAL NOTES CONTRACTOR TO KEEP EXISTING PAVEMENT SURROUNDING THE SITE "BROOM CLEAN" AND FREE OF SOIL OR AGGREGATE THAT MIGHT BE BROUGHT OFF-SITE. DEPENDING ON THE CONSTRUCTION SEASON, MOISTURE CONTENT AND PROPERTIES OF THE SOILS ON SITE, CHEMICAL MODIFICATIONS AND/OR LIME STABILIZATION MAY BE REQUIRED. SEE SHEET C11.0 FOR SPECIFICATIONS. CONTRACTOR SHALL SUBMIT PRECAST STORM SEWER STRUCTURE SHOP DRAWINGS TO ENGINEER FOR REVIEW/APPROVAL PRIOR TO MANUFACTURING. CONTRACTOR NOTE NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. GENERAL NOTES 1. CONTRACTOR TO SCHEDULE A PRE -CONSTRUCTION MEETING WITH THE CITY OF CARMEL STORM WATER ENGINEERING (DAN GRESKAMP). PRIOR TO COMMENCING WITH CONSTRUCTION. 317-571-2441 2. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 3. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE O.S.H.A. STANDARDS FOR WORKER SAFETY. Z 4. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY Y ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. < J w¢ 5. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY [__ ALL EXISTING ELEVATIONS BEFORE CONSTRUCTION BEGINS. Y o O� CO STORM SEWER SYSTEM NOTE m uJ ALL ON-SITE STORM SEWER INFRASTRUCTURE CO co o oin TO BE CONSTRUCTED WITH THIS PROJECT SHALL W U) BE PRIVATELY OWNED AND MAINTAINED.� o iY u- LAKEFRONT COURT CrA MmB2 sh MmB2 MmB2 CrA MmB2 CrA MmB2 CrA CrA CrA MmB2 w.y CrA MmB2 CrA Br MmB2 `F�J Br SOILS MAP SCALE: 1" = 120' N EROSION CONTROL NOTES F ON CONTROL PLAN MUST BE EXECUTED BEFORE CING WITH CONSTRUCTION. ROSION CONTROL MATERIAL NEEDS TO BE APPROVED ITY INSPECTORS PRIOR TO INSTALLATION. DEVELOPMENT SUMMARY TOTAL SITE AREA = 2.43 ACRES TOTALDISTURBED AREA = 2.0 ACRES \ I DENOTES 0.05 ACRE - CONCRETE WASHOUT BMP - 30 CY ROLLOFF PROVIDED BY REPUBLIC WASTE SERVICES OR SEE DETAIL 04/C4.1 FBOP 4 / -FBOP - 0 \ FBOP NOW snow soon soon upon as r �F � PS PS O 4.55 I I I 845 -PS EB 4.0 EB5 PS _ PS Q� / • MULCHING NOTE WHERE REQUIRED, CRIMPED /ANCHORED MULCH OR MULCH WITH A TACKING AGENT SHALL BE USED. THE APPLICATION RATE SHOULD MEET GUIDELINES PER PRACTICE 3.15 OF THE INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS. FERTILIZER NOTE E E PHOSPHOROUS CONTAINING (12-12-12) UNLESS SOIL TESTS PHOSPHOROUS DEFICIENCY. E �PS25 3.75 44 ��(•-•�1�6a eps PS •@c) -•-�l���•=• • • y� • • �• ••`` •7. • • � •' ilrGi • ��• C� • •���i�• ® _0 Iwo 4 • • Imo,• >v 4 � ___�sru \ SEEDING NOTE INSTALL TEMPORARY SEEDING AFTER A SPECIFIC STAGE OF CONSTRUCTION HAS BEEN COMPLETED (TEMPORARY OR FINAL) WHERE AREAS WILL BE IDLE OF CONSTRUCTION ACTIVITIES FOR A PERIOD OF 15 DAYS OR MORE. EROSION FLOOD NOTE THIS LOT LIES ENTIRELY IN FLOOD HAZARD ZONE "X" AS SCALED FROM THE FLOOD INSURANCE RATE MAP (FIRM) FOR HAMILTON COUNTY, INDIANA, COMMUNITY NAME CITY OF CARMEL, COMMUNITY NUMBER 180081, MAP NUMBER 18057CO209 G, PANEL NUMBER 0209 G, DATED NOVEMBER 19, 2014. REFERENCE NAP FIRM MAP #: 18057CO209 G EFFECTIVE DATE: NOVEMBER 19, 2014 00 w - - Lu SOILS DESCRIPTIONS & LIMITATIONS - 1. Brookston Silty Clay Loam (Br - 5.3% Site) The Brookston series Z O O consists of very deep, poorly drained soils formed in up to 20 inches / of silty material and the underlying loamy till in depressions on till 75 plains and moraines. Permeability is moderate in the subsoil and TOP OF CURB GRADE moderately slow in the underlying material. Slope ranges from 0 to 2 PAVEMENT GRADE percent. Subject soil does not present any foreseeable limitations to PAVEMENT OR EARTH GRADE the proposed development. MATCH EXISTING GRADE 2. Crosby Silty Loam (CrA - 34.8% Site) The Crosby series consists PROPOSED GRADE BREAK of very deep, somewhat poorly drained soils that are moderately deep CONTRACTOR RESPONSIBLE TO KEEP ROAD to dense till on till plains. These soils formed in loamy till that can be EXISTING CONTOUR capped with up to 22 inches of loess or silty material. Permeability is Check Dam/Sediment Filter - Spacing at 100' within moderate or moderately slow in and above the argillic horizon and LAKEFRONT slow or very slow below the argillic horizon. Slope ranges from 0 to 2 PROPOSED SILT FENCE -Typical in all areas percent. Subject soil does not present any foreseeable limitations to where sediment could leave the site. the proposed development. s" 3. Shoals Silt Loam (Sh - 0.2% Site) The Shoals series consists of (8"0 Standard Duty "SILT SOCK" or approved equal) very deep, somewhat poorly drained soils formed in alluvium on flood PROPOSED SILT SOCK -Typical in all paved plains. Slope ranges from 0 to 2 percent. Permeability is moderate in areas where sediment could leave the site. the solum and moderate or moderately rapid in the substratum. s'TI.ifM Subject soil does not present any foreseeable limitations to the AFTER FINAL GRADING IS COMPLETED. proposed development. STM _STM 4. Miami Sllt Loam (MmB2 - 59.6% Site) The Miami series consists of moderately well drained soils formed in as much as 18 inches of loess or silty material and in the underlying loamy till on till plains. They are very deep soils that are moderately deep to dense till. i Permeability is moderate or moderately slow in the solum, and slow or very slow in the underlying dense till. Slope ranges from 0 to 60 J percent. Subject soil does not present any foreseeable limitations to the proposed development. LAKEFRONT COURT CrA MmB2 sh MmB2 MmB2 CrA MmB2 CrA MmB2 CrA CrA CrA MmB2 w.y CrA MmB2 CrA Br MmB2 `F�J Br SOILS MAP SCALE: 1" = 120' N EROSION CONTROL NOTES F ON CONTROL PLAN MUST BE EXECUTED BEFORE CING WITH CONSTRUCTION. ROSION CONTROL MATERIAL NEEDS TO BE APPROVED ITY INSPECTORS PRIOR TO INSTALLATION. DEVELOPMENT SUMMARY TOTAL SITE AREA = 2.43 ACRES TOTALDISTURBED AREA = 2.0 ACRES \ I DENOTES 0.05 ACRE - CONCRETE WASHOUT BMP - 30 CY ROLLOFF PROVIDED BY REPUBLIC WASTE SERVICES OR SEE DETAIL 04/C4.1 FBOP 4 / -FBOP - 0 \ FBOP NOW snow soon soon upon as r �F � PS PS O 4.55 I I I 845 -PS EB 4.0 EB5 PS _ PS Q� / • MULCHING NOTE WHERE REQUIRED, CRIMPED /ANCHORED MULCH OR MULCH WITH A TACKING AGENT SHALL BE USED. THE APPLICATION RATE SHOULD MEET GUIDELINES PER PRACTICE 3.15 OF THE INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS. FERTILIZER NOTE E E PHOSPHOROUS CONTAINING (12-12-12) UNLESS SOIL TESTS PHOSPHOROUS DEFICIENCY. E �PS25 3.75 44 ��(•-•�1�6a eps PS •@c) -•-�l���•=• • • y� • • �• ••`` •7. • • � •' ilrGi • ��• C� • •���i�• ® _0 Iwo 4 • • Imo,• >v 4 � ___�sru \ SEEDING NOTE INSTALL TEMPORARY SEEDING AFTER A SPECIFIC STAGE OF CONSTRUCTION HAS BEEN COMPLETED (TEMPORARY OR FINAL) WHERE AREAS WILL BE IDLE OF CONSTRUCTION ACTIVITIES FOR A PERIOD OF 15 DAYS OR MORE. EROSION FLOOD NOTE THIS LOT LIES ENTIRELY IN FLOOD HAZARD ZONE "X" AS SCALED FROM THE FLOOD INSURANCE RATE MAP (FIRM) FOR HAMILTON COUNTY, INDIANA, COMMUNITY NAME CITY OF CARMEL, COMMUNITY NUMBER 180081, MAP NUMBER 18057CO209 G, PANEL NUMBER 0209 G, DATED NOVEMBER 19, 2014. REFERENCE NAP FIRM MAP #: 18057CO209 G EFFECTIVE DATE: NOVEMBER 19, 2014 S ��s PS i 00 �6: •`+°0 844.50 � _ 4.50 �rr2 j o 's •. errs® 67 / 8�S® 844.67 �P�s ft Am am M 40 UGE OPS PS \ III I � -84 ' -_ _ �-- dl -845 x -846- \ II PS PS REVISION RECORD REV DATE DESCRIPTION 1 07/27/18 REVISIONS PER T.A.C. COMMENTS DES BY APP BY EAG I EAG - - CONTROL CONTACT: - - LIMITS OF DISTURBANCE 41 ., :.. PROPOSED CONCRETE DERMATOLOGY, INC. PROPOSED STORM SEWER Q / 3755 EAST 82nd STREET, STE. 75 799.23 TOP OF CURB GRADE INDIANAPOLIS, IN 46240 PAVEMENT GRADE 798.25 PAVEMENT OR EARTH GRADE ATTN: AMY SUMMERS MATCH EXISTING GRADE - - - PROPOSED GRADE BREAK (317) 410-0056 CONTRACTOR RESPONSIBLE TO KEEP ROAD -847- EXISTING CONTOUR FREE OF DUST/DEBRIS/MUD AT ALL TIMES Check Dam/Sediment Filter - Spacing at 100' within LAKEFRONT COURT PROPOSED SILT FENCE -Typical in all areas 842.80 where sediment could leave the site. SEE DETAIL 06/C4.1 --{SS (8"0 Standard Duty "SILT SOCK" or approved equal) 842.30 PROPOSED SILT SOCK -Typical in all paved (\Y areas where sediment could leave the site. PS TS s'TI.ifM S AFTER FINAL GRADING IS COMPLETED. NS STM _STM STM Od PE NOT TO CEED 2.0 .---FBOP wnz wTR wTR VVIR wTR 42.0 (342 842.05 BOP M.E. 'UUP ENTRANCE 'OUP OP • ;O 842.18- 841.86 M.E. � O 842.17 / UGE 1 • 841.67 M.E. ' �G� / NJ f � .'.: -�� 84'x• �� '' S ��s PS i 00 �6: •`+°0 844.50 � _ 4.50 �rr2 j o 's •. errs® 67 / 8�S® 844.67 �P�s ft Am am M 40 UGE OPS PS \ III I � -84 ' -_ _ �-- dl -845 x -846- \ II PS PS REVISION RECORD REV DATE DESCRIPTION 1 07/27/18 REVISIONS PER T.A.C. COMMENTS DES BY APP BY EAG I EAG - - RIGHT-OF-WAY - - LIMITS OF DISTURBANCE 41 ., :.. PROPOSED CONCRETE PROPOSED STORM SEWER Q PROPOSED STORM STRUCTURE ------------ ROOF DRAIN/SUB-SURFACE DRAIN 799.23 TOP OF CURB GRADE 798'73 PAVEMENT GRADE 798.25 PAVEMENT OR EARTH GRADE M. E. MATCH EXISTING GRADE - - - PROPOSED GRADE BREAK --847-- PROPOSED CONTOUR -847- EXISTING CONTOUR Check Dam/Sediment Filter - Spacing at 100' within swoles (Rock Check Dam). See detail 01/C4.1 PROPOSED SILT FENCE -Typical in all areas where sediment could leave the site. SEE DETAIL 06/C4.1 --{SS (8"0 Standard Duty "SILT SOCK" or approved equal) PROPOSED SILT SOCK -Typical in all paved areas where sediment could leave the site. PS TS PERMANENT SEEDING WITH STRAW MULCH - TYPICAL AFTER FINAL GRADING IS COMPLETED. NS NURSERY SOD k11 / IINORTH PROPOSED EROSION CONTROL BLANKET 846- _ 845- N I 20 0 10 20 EB SEE DETAIL 05/C4.1 TS TEMPORARY SEEDING WITH STRAW MULCH - TYPICAL OSo�� WHERE CONSTRUCTION ACTIVITIES WILL REMAIN IDLE s ��h 44.73 846.00 I FOR A PERIOD OF 15 DAYS OR MORE. 1 - i 0 05 S e�' 8 23 845.50 1 (IN FEET) a N 0` I 1 s 0 1 1 I1 I ; Z I -P N O ' I I` N � I I ' O I I Z ; I I o� N I o g Inlet Protection - Flexstorm inlet protection typical for all O \1 1 I 1 inch = 20 ft. aved area inlets AFTER avement is installed• Silt Fence ca e �sr� o� �6 �i 845.68 PS .. ,s ��� \ I 00 PS ..." ~ ..' 844.53 844.03 I 845.79 846.00 I I 844.13 S u7 , • : i I 845.29 845.50 1 844.52 O 1 1 10 �j6 6 -v PS / 844.02 843.77 8 513 844.631 S 1 O I Y PS / I 845.35 0 :3: PS 845.2 \ \ O: / 843.88 PS PS 844.85 845.80 - I 1845.30 844.89 l �y�so� `y / 845.2 •'� PS / ' N 844.39 \ 84 / �� O // I -r, 844.90 845.13 1 PSIN 844.40 844.63 / I 100 PS � �� _� ,' � • S 1 :• i 1 845.2 I P S 844.80 844.02 00 .� PS PROPOSED BUILDING ` ,00 11,851 S.F. (GROSS) O / - �- GRADE CIO 845.2' i rr � i PS :°. -- --�------- BREAK /117 845.68 i ° ° 44.62 &PS , 2.43 ACRES 844.95 .15 "18� �o5L .45 I - - - F.F.E. = 845.70 , -843- _ 44.40 / PS o / 1 ` � ♦ �� - - \/ O b� i cS' I ♦ 011 P S .. 844.63 845.26 I b F� O 844 843.83 84\ 1 / 844.76 1CIO TII POs rveim -� �� ��� A 45.2 ProtectionFenrin g ♦ P \ / 845.2 • 844.24 1 ��/ 843.74 843.33 I I 1 \ X I fj - I 3.12 842.83 843.53 / 1 �\ 842.62 843.03 PS PS 843 49,1-,\ 843- 1 O r n O O� m� � D mn m 00 o� C T! p O mZ �CD �W 17- M � c� O D T �m D M r D N CID ` 843.33 84 /� ♦ e / \�� 842.45 I 842.83 841.95 .�.:.K.. 45.2 / / CONSTRUCTION LIMITS = 2.0 Ac±d'sl \ 841.80 i � o S 3.3 ` •: 43:78 / 842.60 842.45 843 \ 842.10 841.95 842.83 843: $4 / PS 1 I PS �� 8 P �� PS i - - - -840-00 me - .4a MONO MW son 05 �soon ®NES won mom B39- 44 go = son / �` MO'00NO Now m / Tree Pre.�ervation - - - -S - rnu.��.. R 7M STM TM STM •A TT, air, Mid -E61k�1 .� "' 11�� coM sTM CO sTM -STM �r��� - COMM = 0M� coM_ - 843 - - Know whatt D810W. C1II before you dig. - - - - _ - - _ - - _ 840���� '__1 / / - / Y_ V P P 9 & "Flexstorm" inlet protection BEFORE pavement is installed. Point where stormwater will leave the site. o \ o \ o PROPOSED TEMPORARY CONSTRUCTION ENTRANCE 0 0 o SEE DETAIL 03/C4.1 NOTE: INSTALL TEMPORARY SEEDING AFTER A SPECIFIC STAGE OF CONSTRUCTION HAS BEEN COMPLETED (TEMPORARY OR FINAL) WHERE AREAS WILL BE IDLE OF CONSTRUCTION ACTIVITIES FOR A PERIOD OF 15 DAYS OR MORE. GRADING NOTES 1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 3. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 4. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (LOCATION, SIZE AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY EROSION CONTROL NOTES 1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 2. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION. 3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON-SITE INSPECTION. 4. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE. 5. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED. 6. SEDIMENT BEING TRACED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL. 7. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE A WEEK. 8. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 9. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT ALLOWED ON-SITE. 10. SCHEDULE OF EARTHWORK ACTIVITIES: a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE THAN 21 DAYS OR AS DIRECTED BY THE ENGINEER. b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIME OF THE YEAR. PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL GRADING OR AS SOON AS POSSIBLE. Z L0 a O O •�,N C� M --r '-' W � o Q O � � ♦ ± a0 V 0 U .N 1 •'N Q.�o � O �� W�� I QwQ UJ EL0 E 00 =� Lo co co � O v .`��G P • G L ESS ,��� Sti� 44/� = No s PE10403858 e = STATE OF DATE: 07/20/2018 DWN BY: KPB CHKD. BY: EAG SCALE: 1 to = 20' DATE: 07/20/18 CV O i--�•I a� O vol � _0 O O U ICd �-' U U)( W v Q t - O O VL PROJECT NUMBER DER. 001 DRAWING NUMBER C3.0 SHEET 6 OF 15