Loading...
HomeMy WebLinkAboutDER001.C3.1y��l�] ]��»:��L1:7�iL�1► APPLY LIME TO RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING SEEDED. APPLY 23 POUNDS OF 12-12-12 ANALYSIS FERTILIZER OR EQUIVALENT) PER 1000 SQ. FT. (APPROXIMATELY 1000 POUNDS PER ACRE) OR FERTILIZE ACCORDING TO TEST. APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH. WORK THE FERTILIZER AND LIME INTO THE SOIL TO A DEPTH OF 2-3 INCHES WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE. SEEDING SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE PERMANENT SEED MIXTURE CHART). WHILE CONSIDERING BEST SEEDING DATES. IF PERMANENT SEEDING IS NOT PERMITTED USE TEMPORARY SEEDING UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE SEED TOLERANCE CHART. RANKING: 1 GOOD 2 MEDIUM - NOT TOLERANT WHEAT OR RYE OATS ANNUAL RYEGRASS NON -IRRIGATED* IRRIGATED SALT TOLERANCE (TO BOTH SOIL SALTS & SPRAY) T TOLERANCE FERTILIZER NOTE DORMANT MT MEDIUM TOLERANCE SEEDING ** S SLIGHT TOLERANCE DO NOT USE PHOSPHOROUS CONTAINING FERTILIZERS SEED TOLERANCE UNLESS SOIL TESTS SHOW A PHOSPHOROUS DEFICIENCY. SPECIES SEEDING RATE N SITE SUITABILITY 3:1 LBS/ACRE LBS/1000 SQ. FT. DROUGHTY WELL DRAINED WET 5150 LEVEL AND SLOPING, OPEN AREAS w MODERATE DISCHARGE SWALES DS150 60 DAYS 1. TALL FESCUE 35 .8 5.5-8.3 2 1 2 0 TALL FESCUE 25 .6 N 3 BU. 1 1 " DEEP RED CLOVER 5 .12 U Z AND ANNUAL RYEGRASS 3. p w .4 5.8-7.5 2 1 EVENTS Z_ N 15 .4 PRIOR TO CLEARING AND GRADING _ TEMPORARY DIVERSIONS STEEP BANKS AND CUTS STORM EVENTS w U �� 0 - w CDU 4. U) U) w CSU Z w} ZQ 2 1 2 SOIL wof w I� 0_12 } IJ-cn ui wZ ow .. �_ O SOIL .8 CONDITION o w Q� (n N o m w Q� � o �w 0 z� 0 w o� �c� x ww TOLERANCE WET NORM DRY GEN. SOIL SPRAY 6. c=n 01- .9 � z 3 = � � z w CREEPING RED FESCUE 2 1 2 1 1 1 MED. 1 20-25 12-18 7-21 TURF TYPE S FESTUCA RUBRA REMOVAL OF TREE PROTECTION 8. TALL FESCUE 170 4.0 5.5-8.3 2 1 2 PERMANENT SEEDING REMOVAL OF STRAW BALES N/A KENTUCKY BLUEGRASS 2 1 2 1 1 1 MED. 1 20-35 12-18 10-20 MT POA PROTINSIS ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED 1 N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED TALL FESCUE FESTUCA L. ARUNDINACEA 2 1 1 1 1 1 LOW 1 24-35 24-36 5-14 T PERENNIAL RYEGRASS 2 1 2 - 1 2 MED. 2 15-20 12-18 5-10 MT LOLLUM PERENNE HIGH CROWNVETCH - 1 1 2 - - LOW 1 5-10 24 14-21 T CORONILLA VARLA RED CLOVER TRIFOLIUM PROTENSE - 1 _ 2 _ - MED. 1 1 7-10 18 5-10 S S RANKING: 1 GOOD 2 MEDIUM - NOT TOLERANT WHEAT OR RYE OATS ANNUAL RYEGRASS NON -IRRIGATED* IRRIGATED SALT TOLERANCE (TO BOTH SOIL SALTS & SPRAY) T TOLERANCE FERTILIZER NOTE DORMANT MT MEDIUM TOLERANCE SEEDING ** S SLIGHT TOLERANCE DO NOT USE PHOSPHOROUS CONTAINING FERTILIZERS SEED TOLERANCE UNLESS SOIL TESTS SHOW A PHOSPHOROUS DEFICIENCY. * 1 - PREFERRED 2 - WILL TOLERATE ** INOCULATE WITH SPECIFIC INOCULANT. SEED TOLERANCE CHART SEEDING DETAIL FLEXSTORM CATCH -IT FILTERS FOR TEMPORARY INLET PROTECTION PRODUCT SELECTION AND SPECIFICATION DRAWING 11 GA OMNANI2ED STEEL LIFT HANDLES SUSPENSION SYSTEM TEMPORARY SEEDING DATES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC PERMANENT SEEDING DATES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL EROSION AT TIMES OTHER THAN IN THE SHADED AREAS. USE MULCH. * LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS IF MULCH IS APPLIED. ** INCREASE SEEDING APPLICATION BY 50%. SPECIES SEEDING RATE SUITABLE pH SITE SUITABILITY 3:1 LBS/ACRE LBS/1000 SQ. FT. DROUGHTY WELL DRAINED WET 5150 LEVEL AND SLOPING, OPEN AREAS AS NEEDED MODERATE DISCHARGE SWALES DS150 60 DAYS 1. TALL FESCUE 35 .8 5.5-8.3 2 1 2 2. TALL FESCUE 25 .6 5.5-8.3 3 BU. 1 1 " DEEP RED CLOVER 5 .12 EVENTS AND ANNUAL RYEGRASS 3. KENTUCKY BLUEGRASS 15 .4 5.8-7.5 2 1 EVENTS CREEPING RED FESCUE 15 .4 PRIOR TO CLEARING AND GRADING TEMPORARY DIVERSIONS STEEP BANKS AND CUTS STORM EVENTS AND AS NEEDED 4. TALL FESCUE 15 .4 5.8-7.5 2 1 2 KENTUCKY BLUEGRASS 25 .6 PERMANENT SEEDING WATER AS NEEDED 5. TALL FESCUE 35 .8 5.5-8.3 2 1 EROSION CONTROL MATTING EMERALD CROWNVETCH** 10 .25 AND AS NEEDED AFTER LAWNS AND HIGH MAINTENANCE AREAS UPON COMPLETION ROCK CHECK DAM WEEKLY, AFTER STORM 6. KENTUCKY BLUEGRASS 40 .9 5.8-7.5 2 1 INLET PROTECTION CREEPING RED FESCUE 40 .9 AND AS NEEDED 7. PERENNIAL RYEGRASS 170 4.0 5.0-7.5 1 TURF TYPE REMOVAL OF TREE PROTECTION 8. TALL FESCUE 170 4.0 5.5-8.3 2 1 2 * 1 - PREFERRED 2 - WILL TOLERATE ** INOCULATE WITH SPECIFIC INOCULANT. SEED TOLERANCE CHART SEEDING DETAIL FLEXSTORM CATCH -IT FILTERS FOR TEMPORARY INLET PROTECTION PRODUCT SELECTION AND SPECIFICATION DRAWING 11 GA OMNANI2ED STEEL LIFT HANDLES SUSPENSION SYSTEM TEMPORARY SEEDING DATES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC PERMANENT SEEDING DATES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL EROSION AT TIMES OTHER THAN IN THE SHADED AREAS. USE MULCH. * LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS IF MULCH IS APPLIED. ** INCREASE SEEDING APPLICATION BY 50%. * NOT NECESSARY WHERE MULCH IS APPLIED. TEMPORARY SEEDINGS EROSION CONTROL SCHEDULE ° WASHOUT EROSION CONTROL MEASURE 3:1 MAINTENANCE TYPE OF SEED 1000 SQ. FT. ACRE REMARKS 5150 STONE ENTRANCE AS NEEDED MODERATE DISCHARGE SWALES DS150 60 DAYS WHEAT OR RYE 3.5 LBS. 2 BU. COVER SEED 1" TO 1 1/2" DEEP SILT FENCE WEEKLY, AFTER STORM EVENTS AND SPRING OATS 2.3 LBS. 3 BU. COVER SEED 1 " DEEP EXISTING INLET PROTECTION WEEKLY, AFTER STORM EVENTS AND ANNUAL RYEGRASS 1 LB. 40 LB. COVER SEED 1/4" DEEP * NOT NECESSARY WHERE MULCH IS APPLIED. EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS: 1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE-LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS: 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOP DRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. CROSSBARS /I INLET RR 24" W W LATHS SILT FENCE MATERIAL ��� SILT FENCE EXTENDS 8" BELOW FINISHED GRADE NOTE: 1. SEE SILT FENCE DETAIL FOR MATERIAL SPECIFICATIONS. 2. SILT FENCE SHALL BE PREASSEMBLED BY SUPPLIER. 02 SILT FENCE INLET B c4.1 PROTECTION N NOT TO SCALE a ROCK CHECK DAM MAINTENANCE REQUIREMENTS: 1. INSPECT ROCK CHECK DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN, TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES. 2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION ACTIVITIES AND REPAIR IMMEDIATELY. 3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL ROCK CHECK DAMS AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT. SILT FENCE MAINTENANCE REQUIREMENTS: 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. TYPICAL ROUND INLET FILTER A I i..------.I� REPLACEABLE SEDIMENT BAGS WITH GEOTEXTILE FILTER FABRIC TYPICAL RECTANGUTAR INLET FILTER I3 "'R 27�FE .g 2' AREA STAINLESS STEEL CLAMPING BAND c COMBINATION INLET FILTER FOR CURB HOODS INSTALLATION: 1. REMOVE GRATE 2. DROP FLEXSTORM INLET FILTER ONTO LOAD BEARING LIP OF CASTING OR CONCRETE STRUCTURE 3. REPLACE GRATE BLIC ROAD PU 12" MINIMUM THICKNESS #2 COARSE AGGREGATE GEOTEXTILE FABRIC TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE WETNESS IS ANTICIPATED) RCURB GUARD P WRH MAGNETIC DOWNS U STAINLESS STEEL ROUND INLET FILTERS for NYLOPLAST CASTINGS CATCH -ITS SPECIFIED W/ FX.r FX -S BAGS NOTES: 1. ALL FRAMING IS CONSTRUCTED OF CORROSION RESISTANT STEEL (ZINC PLATED OR GALVANIZED) FOR 7 YEAR MINIMUM SERVICE LIFE. 2. UPON ORDERING CONFIRMATION OF THE DOT CALLOUT, PRECAST OR CASTING MAKE AND MODEL, OR DETAILED DIMENSIONAL FORMS MUST BE PROVIDED TO CONFIGURE AND ASSEMBLE YOUR CUSTOMIZED FLEXSTORM INLET FILTER. PART NUMBER ALONE IS NOT SUFFICIENT. 3. FOR WRITTEN SPECIFICATIONS AND MAINTENANCE GUIDELINES VISIT WWW.INLETFI LTERS.COM TEMPORARY CONSTRUCTION ENTRANCE 10' MIN. 10 MIL-/ PLAN PLASTIC LINING TYPE "ABOVE GRADE" WITH STRAW BALES STAPLES10 MIL (2 PER BALE) -"-,,PLASTIC LINING NATIVE MATERIAL (OPTIONAL) SECTION B -B NOT TO SCALE '-STAKE (TYP.) B STRAW BALE (TYP.) BINDING WIRE 750, 2" STEEL WIRE �� STAPLE DETAIL °CONCRET LONGEVITY EROSION CONTROL SCHEDULE ° WASHOUT EROSION CONTROL MEASURE 3:1 MAINTENANCE DS75 60 DAYS 3:1 INSTALLATION SEQUENCE 5150 STONE ENTRANCE AS NEEDED MODERATE DISCHARGE SWALES DS150 60 DAYS 2:1 MODERATE DISCHARGE SWALES PRIOR TO CLEARING AND GRADING 1:1 SILT FENCE WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING EXISTING INLET PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING .. � TREE PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING TEMPORARY DIVERSIONS WEEKLY, AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH GRADING TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING - AS SOON AS PRACTICAL UPON COMPLETION EROSION CONTROL MATTING WEEKLY, AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING - AS SOON AS PRACTICAL UPON COMPLETION ROCK CHECK DAM WEEKLY, AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING - AS SOON AS PRACTICAL UPON COMPLETION INLET PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED AFTER EACH INLET IS PLACED REMOVAL OF TREE PROTECTION N/A AFTER PERMANENT SEEDING REMOVAL OF STRAW BALES N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF INLET PROTECTION N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SILT FENCE N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS: 1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE-LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS: 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOP DRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. CROSSBARS /I INLET RR 24" W W LATHS SILT FENCE MATERIAL ��� SILT FENCE EXTENDS 8" BELOW FINISHED GRADE NOTE: 1. SEE SILT FENCE DETAIL FOR MATERIAL SPECIFICATIONS. 2. SILT FENCE SHALL BE PREASSEMBLED BY SUPPLIER. 02 SILT FENCE INLET B c4.1 PROTECTION N NOT TO SCALE a ROCK CHECK DAM MAINTENANCE REQUIREMENTS: 1. INSPECT ROCK CHECK DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN, TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES. 2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION ACTIVITIES AND REPAIR IMMEDIATELY. 3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL ROCK CHECK DAMS AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT. SILT FENCE MAINTENANCE REQUIREMENTS: 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. TYPICAL ROUND INLET FILTER A I i..------.I� REPLACEABLE SEDIMENT BAGS WITH GEOTEXTILE FILTER FABRIC TYPICAL RECTANGUTAR INLET FILTER I3 "'R 27�FE .g 2' AREA STAINLESS STEEL CLAMPING BAND c COMBINATION INLET FILTER FOR CURB HOODS INSTALLATION: 1. REMOVE GRATE 2. DROP FLEXSTORM INLET FILTER ONTO LOAD BEARING LIP OF CASTING OR CONCRETE STRUCTURE 3. REPLACE GRATE BLIC ROAD PU 12" MINIMUM THICKNESS #2 COARSE AGGREGATE GEOTEXTILE FABRIC TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE WETNESS IS ANTICIPATED) RCURB GUARD P WRH MAGNETIC DOWNS U STAINLESS STEEL ROUND INLET FILTERS for NYLOPLAST CASTINGS CATCH -ITS SPECIFIED W/ FX.r FX -S BAGS NOTES: 1. ALL FRAMING IS CONSTRUCTED OF CORROSION RESISTANT STEEL (ZINC PLATED OR GALVANIZED) FOR 7 YEAR MINIMUM SERVICE LIFE. 2. UPON ORDERING CONFIRMATION OF THE DOT CALLOUT, PRECAST OR CASTING MAKE AND MODEL, OR DETAILED DIMENSIONAL FORMS MUST BE PROVIDED TO CONFIGURE AND ASSEMBLE YOUR CUSTOMIZED FLEXSTORM INLET FILTER. PART NUMBER ALONE IS NOT SUFFICIENT. 3. FOR WRITTEN SPECIFICATIONS AND MAINTENANCE GUIDELINES VISIT WWW.INLETFI LTERS.COM TEMPORARY CONSTRUCTION ENTRANCE 10' MIN. 10 MIL-/ PLAN PLASTIC LINING TYPE "ABOVE GRADE" WITH STRAW BALES STAPLES10 MIL (2 PER BALE) -"-,,PLASTIC LINING NATIVE MATERIAL (OPTIONAL) SECTION B -B NOT TO SCALE '-STAKE (TYP.) B STRAW BALE (TYP.) BINDING WIRE 750, 2" STEEL WIRE �� STAPLE DETAIL °CONCRET LONGEVITY ° ° WASHOUT 0 25� PLYWOOD 48" X 24" PAINTED WHITE BLACK LETTERS " 6 HEIGHT 0.5" LAG SCREWS (WOOD POST 3 X 3 X 8 CONCRETE WASHOUT SIGN DETAIL (OR EQUIVALENT) STRAW BALE WOOD OR METAL STAKES (2 PER BALE) 04 CONCRETE WASHOUT BMP C4.1 NOT TO SCALE �v 2:1 SIDE SLOPE OR FLATTER 9" LOWER THAN TOP OF BANKS OF SWALE 2:1 SIDE SLOPE T OR FLATTER 6" FACE OF #8 STONE OVER RIP -RAP STONE. FILTER FABRIC 01 ROCK CHECK DAM Kf 1J NOT TO SCALE WOVEN GEOTEXTILE SPACE POSTS PER FABRIC MANUFACTURER RECOMMENDATIONS FILTER FABRIC V\\V\\V�\\j�\\i\%/%i%�\\\��\\��\\��\\moi\\�j,\\V` FILTER FABRIC 1. PLACE THE END POST OF THE SECOND FENCE WOOD POST INSIDE THE END POST OF THE FIRST FENCE. 2. ROTATE BOTH POSTS AT LEAST 180' IN A FLOW_ CLOCKWISE DIRECTION TO CREATE A TIGHT SEAL WITH THE FABRIC MATERIAL. 3. DRIVE BOTH POSTS A MINIMUM OF 18" INTO THE �r - GROUND AND BURY THE FLAP. JOINT DETAIL EXTEND TO 8" B FABRIC POSTS��\\\/\ /\\ N 36NC ES SHALL PLUSHAVE BURIALMINIMUM DEPTH LENGTH POST MATERIAL SURFACE /\\//\ /��` SHALL BE WOOD, STEEL, R SYNTO T ESIIC, AND SHALL BE OF GE DURING INSTALLATION AND TO SUPPORT APPLIED LOADS. FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC CONSISTING OF STRONG, ROT RESISTANT, MATERIALS RESISTANT TO DETERIORATION FROM ULTRAVIOLET AND HEAT EXPOSURE. 06 SILT FENCE CONSTRUCTION C4.1 NOT TO SCALE NORTH AMERICAN GREEN TYPE LONGEVITY MAX. SLOPE APPLICATION S75 10 MONTHS 3:1 LOW FLOW SWALES DS75 60 DAYS 3:1 LOW FLOW SWALES 5150 10 MONTHS 2:1 MODERATE DISCHARGE SWALES DS150 60 DAYS 2:1 MODERATE DISCHARGE SWALES SC150 2 YEARS 1:1 MEDIUM DISCHARGE SWALES C125 1 3 YEARS >1:1 HIGH DISCHARGE SWALES 1 THE EDGES OF THE BLANKET SHOULD BE BUTTED AGAINST EACH OTHER, THE EDGES OF THE SCC225 SHOULD BE OVERLAPPED 2". 2 ON SLOPE APPLICATIONS, THE TOP OF THE BLANKET SHOULD BE "SLOTTED IN" ABOVE THE BREAK OF THE SLOPE OR AT A MINIMUM, STAPLED IN PLACE WITH STAPLES 6" APART ON THE END OF THE BLANKET. U Z CL Lr) O w • (� N t - W � I ■ 00 O � vCD ZN O � co N �) � X O 00 O N co� L_0 _ D O N _ Ww� EcI nLoL_ O F�1 Lo U N Oc) ~ �+, u) Q) 2U O coU %0111111111 �GP" G L El`SS�i�i •°°•°•. i N o�-G\STERE• �� = O° • s ° • No o. s PE10403858 0 • STATE OF00 p o •° / P oo °,�Lp I AN • �. . i °•,°.°••°NGS �-� 111111110 DATE: 07/20/2018 V1 1--1 W DWN BY: KPB CHKD. BY: EAG SCALE: Nco /A DATE: 07/20/18 O < a OWU 0� O r 4--{ O c CV O V1 PROJECT NUMBER DER. 001 DRAWING NUMBER C3.1 SHEET 7 OF 15 3Q�� ON LONG SLOPES, THE NOTES: THE BLANKET SHOULD NOT BE - ENDS OF THE 1. ACTUAL LAYOUT DETERMINED STRETCHED BUT ALLOWED TO BLANKETS SHOULD BE LAY LOOSELY ON THE SOIL OVERLAPPED 4 - 6" IN IN FIELD. SURFACE TO ACHIEVE MAXIMUM OF A "SHINGLE EFFECT". 2. THE CONCRETE WASHOUT SIGN BLANKET TO SOIL CONTACT. .-- SHALL BE INSTALLED WITHIN - 6 _�� PREPARATION OF THE SEED 30 FT. OF THE TEMPORARY i BED, INCLUDING APPLICATION CONCRETE WASHOUT FACILITY. of LIME, FERTILIZER AND 7 SEED SHOULD BE CONDUCTED R -L BLANKETS AS NORMAL PRIOR TO =` OUT IN DIRECTION INSTALLATION OF BLANKET. .. � \ TER OF WALOW. 1 5 INHIGH VELOCITY CHANNEL /- APPLICATIONS, CHECK SLOTS SHOULDs BE ESTABLISHED EVERY 35 - 40'. THE SLOTS SHOULD BE 6" WIDE BY 6" DEEP WITH THE BLANKET STAPLED 05 EROSION BLANKET INSATLLATION IN THE BOTTOM OF THE SLOT, THEN C4°1 BACKFILLED AND SEEDED. NOT TO SCALE U Z CL Lr) O w • (� N t - W � I ■ 00 O � vCD ZN O � co N �) � X O 00 O N co� L_0 _ D O N _ Ww� EcI nLoL_ O F�1 Lo U N Oc) ~ �+, u) Q) 2U O coU %0111111111 �GP" G L El`SS�i�i •°°•°•. i N o�-G\STERE• �� = O° • s ° • No o. s PE10403858 0 • STATE OF00 p o •° / P oo °,�Lp I AN • �. . i °•,°.°••°NGS �-� 111111110 DATE: 07/20/2018 V1 1--1 W DWN BY: KPB CHKD. BY: EAG SCALE: Nco /A DATE: 07/20/18 O < a OWU 0� O r 4--{ O c CV O V1 PROJECT NUMBER DER. 001 DRAWING NUMBER C3.1 SHEET 7 OF 15