CHANGE ORDER #2
For 16 -ENG -55, by direction of the City of Carmel, the contractor is to continue paving operations on
Sunday, August 12, 2018, in order to open by August 14. A Sunday premium is agreed to.
Contract Price prior to this Change Order $3,656,909.57
Contract Price -will- be -increased- by this Change Order
$27,842.49
New Contract Price including this Change Order $3,684,752.06
Amount
Adjusted Contract
Price
Cumulative % Change
from Original Contract
Original Contract $3,572,000.00
N/A
C01 $84,909.57
$3,656,909.57
2.37%
CO2 $27,842.49
$3,684,752.06
3.13%
CITY OF CARMEL
TO: White Construction, Inc. CONTRACT CHANGE ORDER NO.: 2
3900 East White Avenue. DATE: November 16, 2018
Clinton, IN 47842 PROJECT NAME: Main St and Gray Road Roundabout
Carey Rd and Main St. Pathway Extension
Grav Rd Multi Use Path
CITY P.O. NO.: 100708
CITY P.O. DATE: September 7, 2017
I. You are directed to make the following changes in this Contract: �, a
For Project # 16 -ENG -55, Main Street and Grav Road Roundabout
At the direction of the City of Carmel, placement of HMA materials on Sunday, August 12, 2018 is
authorized. Paving on this date is necessary to achieve opening of the roundabout to traffic before
August 14, 2018.
SCHEDULED ADJUSTMENT
ITEM AMOUNT H OR (-) DAYS
143E, Sunday, 8/12/2018, Premium
for Paving $27,842.49 0
II. The following referenced documents further describe the changes outlined in Paragraph I, and are to be
considered a part of this Change Order:
R.F.P.: W.D.C.: N/A
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Sum prior to this Change Order $3,656,909.57
Contract Sum will be increased/desFeased by this Change Order $27,842.49
New Contract Sum including this Change Order $3,684,752.06
Contract Time Prior to this Change Order 5/15/2018 Substantial Completion Date Days
5/30/2018 Final Completion Date Days
Net increased/decreased resulting from this Change Order 0 Days
Current Contract Time including this Change Order 5/15/2018 Substantial Completion Date Days
5/30/2018 Final Completion Date Days
This Change Order is for full and final settlement of all direct, indirect, impact costs and time extension incurred at
any time resulting from the performance of the changed work.
The Above Changes Are
Recommended:
DLZ Indiana, LLC,
Engineer
157 E. Maryland St.
Indianapolis, IN 46204
Date /4ivr,A/7i&_
The Above Changes Are
Accepted:
White Construction
Company, Inc
3900 East White Avenue
Clinton, IN 47842
By G7�
Phone 3/7- Tor - / 0,,
Date /112 0/ 11
Approved:
C4
oeo o -�
James Brainard, Mayor
JereIngineer
I shman, PE,
Ci
ATTEST:
Treasurer
((7!(l
Date: /V
PROJECT NO: 16 -ENG -55,16 -ENG -97,16 -ENG -109
CONTRACTOR: White Constriction Co.
INSPECTION CONSULTANT: DLZ Indiana
BID AMOUNT: $1.672,000.00
BID DATE:
09/01/17
CONTRACT
CHANGE ORDER
NUMBER
FORESEEN
OR
UNFORESEEN
TOTAL
FORESEEN
AMOUNT
TOTAL RUNNING
UNFORESEEN TOTAL OF
AMOUNT CHANGE ORDERS
DESCRIPTION OF DATE
CHANGE ORDER BOARD
APPROVED
NEW
CONTRACT
AMOUNT
% OF CHANGE
ORDER
FORESEEN
% OF CHANGE
ORDER
UNFORESEEN
001
FORESEEN
$84,909.57
$84,909.57
Owner directed changes for
16 -ENG -55 for Modular
Block Wall
$3,656,909.57
2.37%
2
FORESEEN
$27,842.49
$112,752.06
Sunday Paving Premium
$3,684,752.06
3.16%
$112,752.06
Original Bid Amount
$3,572,000.00
Total Change Order(s) Amount
$112,752.06
Total Foreseen Change Orders
$112,752.06
Total Unforeseen Charge Orders
$0
Total % Change Orders vs. Bid Amt.
3.16
$3,684,752.06 3.16%
T A G,$ 41
Summary
Sunday Paving Adjustment, 16 -ENG -55, Main St and Grey Road, ChanIze
Order #4
From Page 5 Crew Payroll, Plant Fee and Trucking Subcontractor Fee $18,971.50
From Page 5 Mechanic on duty and lowboy fees $4,404.58
From Page 5 White Foreman cost $960.00
From Page 5 White 15% mark-up of sub -contractor fees $3,506.41
TOTAL $27,842.49
7/7wHITE
TIME & MATERIAL WORK AGREEMENT
7AG1 5
T&M #11
CUSTOMER: City of Carmel DATE: 8/15/18
DESCRIPTION OF WORK PERFORMED: Midwest Asphalt 8/11/12 & 8/12/2018 Premium
JOB #: 16 -ENG -55 (WCI Job No: 16015-110)
EOUIPMENT RATES DO NOT APPLY TO SNOW REMOVAI
EQUIPMENT (OPERATOR NOT INCLUDED)
DESCRIPTION RATE H HR TOTAL ( )
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$000
$0.00
$000
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$000
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$000
White Construction Company, Inc.
By:
Printed:
Title:
EFFECTIVE DATES:
Strai ht Time Time +2 Premium Only
LABOR RATE HRS RATE HRS
TOTAL
LABORER $58.00
$0.00
_
PIPE LAYER $59.00
$0.00
OPERATOR $74.00
$0.00
DRIVER $60.00
$0.00
FOREMAN $9100
$0.00
SUPT T $96.00 8.0 $2400 1 80 1
$960.00
FOREMAN & SUPERINTENDENT RATES INCLUDE TRUCK/PHONEIMISC
MATERIALS & SUPPLIES QTY. UNIT PRICE ($) TOTAL
$000
$0.00
_
$0.00
$0.00
$0.00
MARKUP OF 15% OF MATERIAL
$0.00
TRUCKING CO. HRS. # TRUCKS PRICE ($) TOTAL
$0.00
$0.00
_
$0.00
$0.00
MARKUP OF 15% OF TRUCKING
$0.00
SUBCONTRACTORS WORK PERFORMED QTY
PRICE $
Midwest Paving
Sunday Crew Premium LS
$18,971.50
Sunday Super, Mach, Lowboy IS
$4.404.58
MARKUP OF 15% OF SUBS
$3,506.41
EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY, AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR
ANY EQUIPMENT REQUIRING MOBILIZATION
ALL MATERIALS WILL BE BILLED AT COST PLUS 15%
ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10%
HOURS ABOVE 8 PER DAY AND ALL DAY SATURDAY ARE BILLED AT 1 5 TIMES THE STANDARD RA -E SUNDAYS ARE A-
'DOUBLE TIME
MINIMUM CHARGES MAYBE REQUIRED
Authorizing Party
By:
Printed:
Title:
TOTAL: $27,842.49
AN&.
MIDWEST
--PAVING-
Midwest Paving Project No. I Name:
Midwest Paving Change Order No:
Date Work Completed:
Description of Work:
16105 River Road, Noblesville. Indiana 46082
Phone: (317)776.8925
Fax: (317) 776-8921
170075 - Carmel Main Street & Gray Road Roundabout CREW PREM TIME SUNDAY
08/12/18
Sunday Work - Premium time for regular paving crew
Qty, Ea. Hours Used Hourly Rate
Extension
Description
Oty Ea Hourly Rate Hours I
LABOR (Rates are valid from 4/112018.313112019)
4 Ton Skid Steer (Cat 262)
$53.78
$
Mill Head (Cal PC205)
Trade Qty Ea
Straight
Time
Hours Time &One Hall
Hours
Double Time (Premium
Only) Hours Fringe
Extension
Laborer (7) 1
S 23.72
$ 35.58
$258.51
S 23.72 80 $
$ 1,897.60
Operator 6) 1
S 34.80
$ 5220
$165.45
$ 34.80 64.5 $
$ 35.80 24.5 S
$ 2,244.60
$ 877.10
Foreman (2) 1 $ 35.80 $ 53.70
S
EQUIPMENT - (Operator not Included)
Qty, Ea. Hours Used Hourly Rate
Extension
Description
Oty Ea Hourly Rate Hours I
Extension
4 Ton Skid Steer (Cat 262)
$53.78
$
Mill Head (Cal PC205)
531.03
$
5 Ton Roller (itamm HD14VV)
$66.18
S
10 Ton Roller Hamm HD+90VV)
$107.55
$
10 -Fool Paver (Vogele 22197)
$258.51
$
8 -Foot Paver
$206.81
$
Path Paver
$165.45
$
Widener (SP -8 Midland)
$126.18
S
Transfer Mach. (Weiler E1250A)
$530.04
S
14' Mill
$458.41
$
10' Grader (Fiatallis FG65C)
$67.94
$
12' Grader (Cat 140)
$122.33
$
Kettle (260 gal)
$58.90
$
Pickup Truck
$29.31
$
Utility Trailer
$14.49
$
Lo,.,Iooy
$196.53
$
Service Truck
536.17
$
Distributor
$69.12
$
Broom
$64.12
S
Pipe Van/Conex Box
$31.94
$
4x4 Backhoe (Cat 420E)
$68.25
$
Excavator Hoe Pack
$37.23
$
36" S I. Drum Smooth Roller (Cal CP44)
$82.08
S
20 M•Ton Excavator (Cat 320)
$132.72
$
25 M -Ton Excavator (Cat 325)
$165.45
$
19 M•Ton Excavator (Cat 329)
$184.07
S
30 M -Ton Excavator (Cat 330)
$194.40
$
36 M -Ton Excavator Cat 336)
$208.88
$
45 M•Ton Excavator (Cat 345)
$276.33
S
49 M -Ton Excavator (Cat 349)
$308.14
S
85 M•Ton Excavator (Cal 385)
$543.90
$
Loader(Cat930K)
$103.41
S
21,000 Ib. Dozer (Cat D5K)
$93.07
5
40,000 Ib. Dozer (Cat D6N)
$155.78
S
11 CY Scraper (Cat SC613)
$186.13
S
17 CY Scraper (Cal SC615)
$248.17
$
185 HP Tractor & Disk
$153.04
S
250 HP Tractor & 17 CY Scraper
_
$187.17
S
25 -Ton Off Road Truck
$238.86
$
30 -Ton Off Road Truck
$266.79
$
35 -Ton Off Road Truck
$307.65
$
40 -Ton OH Road Truck
$330.89
S
Subcontractors
Qty, Ea. Hours Used Hourly Rate
Extension
Description
Ory Ea Hourly Rate Hours
Extension
Trucking (Premium Only) 10 TRUCKS
i S 77.00 92.25
S 7,103.25
T Mill (Daily Rale)
$ 7,200.00
$
4' Mill (Daily Rate)
$ 4,800.00
S
Plate Compactor
$
5 -
S
Auto Level
S -
4.17
$
$
MATERIALS
Materials Used (Units) Ory Ea Rate Extension
Plant Fee 1 $ 3,750.00 S 3,750.00
S
S -
S -
S -
S -
$
$
Small Tools
Qty, Ea. Hours Used Hourly Rate
Extension
Chainsaw
$
3.42
S
Chopsaw
S
3.42
S
Leaf Blower
$
1.17
$
Plate Compactor
$
19.86
S
Auto Level
$
4.17
$
Pipe Laser
S
6.48
S
5 KW Gen.
S
5.08
S
Trench Box
S
14.74
S
Manhole Box
$
13.77
$
2" Gas Pump
$
4.43
$
3" Pump -No Gen. 24 hr.
$
5.37
$
3" Pump (Daily)
S
105.00
S
4" Pump -No Gen. 24 hr.
$
10.26
$
4" Pump (Daily)
S
125.00
$
6" Pump -No Gen. 24 hr.
S
11.93
$
6" Pump (Daily)
S
350.00
S
20 KW Gen. 24 hr.
$
12.51
S
40 KW Gen. 24 hr.
$
21.89
$
56 KW Gen. 24 hr.
S
27.23
$
100 KW Gen. 24 hr.
$
38.57
S
150 KW Gen. 24 hr.
S
54.52
$
200 KW Gen. 24 hr.
$
66.18
$
12" Chipper
S
74.83
$
Walk Saw (Daily)
5
400.00
$
P. Washer (Daily)
S
325.00
S
Billing Summary
Labor
5,019.30
20%
1,003.86
FICA, WC, UTA
20%
1,003.86
Equi ment & Small Tools
12%
Material
3,750.00
12%
450.00
Subcontractor
7,103.25
Up to 3K:
10%
300.00
After 3K:
7%
287.23
Bond
0.0%
TOTAL $
18,917.50
/6 PA
I
I
s
1A ;r ZAR
- ��. •;rb/ I.. Zrrk r�.% ', � �� �r1(�ts�.gdy .t. "J�9'� -�,,, 'f �� -I
Far.�a3a�{ I�;+a��h uo 3c; �o a;S agaIduao: A?Zj i t?+a;� I
I
uo:tdu35a� s=01 I
/'�f✓
1 O� J t �� Palajdu03 SW711
Ile �+n�srp�
4 F
3' t t' n
1 • - I
"tz:fg
y ,j
1
1175
W94! SAH
pnq uaalj S1.4
a3n t
uail
5.1H fan
._ .._ -- �_j..—..
---- --- -
- .._ ._ - • -- --- - -�+� /, $'1
-
"��7''^
� -- vaag�Zj. _ ..__ �1i917 21�j —.._�
- - -- .-----—�J__ -
7 raj _- f.,9 -- — -- f-�/�j'- Z %I •- �
-�zi•I_ - �%
E
I j
ia.toce i
_.�NY
-- � �11
7l�r�o }iTiy/
'�a�F,�
! _
_... ��
-�►�-
--
£ �► jj
-may. /7-�onf�
est
v t
b?
=,o���
_-'
s� 21 D
6�7-17
q
sio{ejad
_
_
•srHb3l a�hb3 stpp�
I
si ;
PL'3 I �4S ' zae�i I
!
an ( �e3oi
I
i uotun aadojdw3
I
WLOZ - --e / ol(/-
L V"T
;aaus au!i
11710JII1)
6�� /,� h7✓� 2ainecj' !S3hAPjYV
Time sheet
X117
e
Employee Union
Employee
y
Local
I lob#
f Iter
Item
Start
End
Hrs
Equip
Hours
Meter
...
e
. . .....
....... ............
......... . ..
... ........ .......
.... $.'aw . ...
...
.................._....__.b........_
... . ..... .
. ...... ............ ...
....... Zf1.s ........
...
....... ... .
...... . . ........
........................
.,E
.0
A
.................... PA ............ ...........
........ ..........
.. k.? . .....
.....
P�ar
.
.......................
...... .. .......
....... . ..
........
. . .......
..... . .................. .
. . . ........................ . ..... . .... .. .
...... . . . ....... . ...... ..... .
....... ....... .. . ....................
.... . . .....
... ..................... ....
... . . ..... I ...... . ...................... . .. .
............. ....... ..
. ...
........... I ......
... ...................
. .. ...........
.... . . ...............
.....
.............
....... ............ . I
........... ..........
..... .... ............
............ . . .........
..................
. ..
........... .........
....... . . ...........
.........
. .............
................... . .
. ......... I ....
........ . ................. .
. .......... . ...................... ...,
....... .. ................. .
...................................
................. . .......... I .....
......... . .. . .. ...............
.......
..
.......... ..........
. ......
.......................
...... ... .. . .. .... .
.. ......... . ...... .
...... . .....
.
. . ......... . . ......
....................
. . .............. ...
..... - ............ .. .
........ . ..... .
Z...............
............. I .......
. . ...................
. ....... . ........ ..
.. . .................
... ........... .......
.................. .....
..... .. ... .............
....... . ............
........ . ............ ..
................ . ......
. . ................
......... ....... .....
........... I ...........
............
.................... .
....... ...........
......................
......... ............
......
.......
.....................
Truck
Firs
Item
Truck
Hrs
Item
T uc
Hrs
Item
......
y
. ..
—7 ......
............. ........ ...................
. ............. .......
........
...... . ..................
.............................. .
.......... I .............
.......
.......... ....
...... ....
. ......... . ....... .. ...............
....... ......... ......
...................................
.l
... .............
..........
.. . .. . . ....... . ...... . ............. ... .... .
............. .... .....
.. . ...........................
. . ......... . ............ ...................
................. —, **,,
. ....................
............
.. ................ .
..... . ..................
. ..... . . .. -
--- .......
............
.... . .......................
..... . .... . ................
/I
.......... . .... . .......
... ........ . .....
....
. .. ...........
..... . ...... .........
..................................
.. ........ ....... I ..
......... . .... .......... . ....... ...........
................ ... . ................
. . ...... . ... ......... ...... ........ ........
... ...........
. . . . .. . ........... ...... ......... . .
...........
......... . . ... I ....
............ ....... . .
.......... ... . .......
..... I ........ . . ... .
..... ....... I .....................
............... ............. .
....................... ...........
. ........
......................... *
........... I ...............
. ........ ... .
........... ............ ........................
.. . ... . .................
........................ .. I ............ . . ...
... . .......
. . ............ . ...... . ........
.. . .....................
.............. . ......
........................
. . . ................
........ . ......... ..
........... ............
............ . ...........
......................
Items completed
JOB Description
Item#
Qty ComPlike Sta. or Location Material Received
r—
-it., .... .........
. . . . .................................................... . ..............
............................ ...... .............................. ......... ..................... . ......... I ........ ... .
.7-7.7
. . ..... ......
...... . ... . ... . ......... .. .........
- e-��
.... ......... .................. .... ...... ?.. . . ...... ...... ....... . ......... I . .......... ...............
........... ...............
..... . . ....... ........ . ........................................................................ .
. . . ... ............. ...
. .....................
..... . ....... ....... ........ . . . .............. t ............ ... . ..........................................
I-
Notes
I (County f4 Am, I Top,L Foreman: frt�,l
I IDate����
w
MIDWEST
Midwest Paving Project No. / Name:
Midwest Paving Change Order No:
Date Work Completed:
Description of Work:
16105 River Road, Noblesville, Indiana 46062
Phone: (317) 776.8925
Fax: (317) 776-8921
170075. Carmel Main Street & Gray Road Roundabout
08/12/18
P1444 �
Sunday Work - Superintendent, Mechanic, Lo,.,AM
Oty. Ea. Hours Used Hourly Rate
Extension
LABOR (Rates are valid from 411/2018.3/3112019)
Description
Oty Ea
Trade Oty Ea
Straight
Time
Hours Time & One Half Hours Double Time Hours Fringe Extension
Laborer
$ 23.72
$ 35.58 $ 47.44 $ 15.16 S
Operator 1
S 3480
S 52.20 S 6960 13.5 S 18.46 S 1,188.81
�4"er+nte46e# 4-
$ 48.00
$ 7200 9 96." 44 S 48.4 6, 1-259.88
EOUIPMENT - (Operator not Included)
Oty. Ea. Hours Used Hourly Rate
Extension
Description
Description
Oty Ea
Hourly Rate Hours
Extension
I Ton Skid Steer (Cat 282)
MITI (Daily Rate)
$53.78
$
Mill Head (Cat PC205)
$ 4,800.00
$31.03
S
i Ton Roller (Hamm HD14VV)
S -
$6618
$
0 Ton Roller (Hamm HD+90VV)
4.17
$107.55
_
$
i0 -Foot Paver ele 22197)
6.48
$258.51
$
/.Foot Paver
5.08
$206.81
$
3ath Paver
14.74
5165.45
$
.Videner (SP -8 Midland)
13.77
$126.16
$
Transfer Mach. (Weiler E1250A)
4.43
$530.04
$
:' Mill
5.37
$458.41
S
T Grader (Fiatallis FG65C)
105.00
$67.94S
4" Pump -No Gen. 24 hr.
12' Grader (Cat 140)
10.26
$122.33r43
S
Kettle (260 gal.)
125.00
$56.90S
6" Pump -No Gen. 24 hr.
I'ickup Truck
1
$29.31$
322.41
ltili Trailer
350.00
$14.49S
20 KW Gen. 24 hr.
. owboy with Operator
!:erviceTruck
1
$196.53
$36.17
S 2;564.6
$ -
^~
klechanic Truck
1
$99.12 13.5
$ 1,338.12
room
27.23
$64.12
$
., pe Van/Conex Box
38.57
$31.94
$
'x4 Backhoe (Cat 420E)
54.52
$68.25
$
i xcavalor Hoe Pack
66.18
$37.23
S
6" Sgl. Drum Smooth Roller (Cat CP44)
74.83
582.08
$
3 M -Ton Excavator (Cat 320)
400.00
S13272
S
5 M -Ton Excavator (Cat 325)
325.00
$165.45
$
9 M•Ton Excavator (Cat 329)
$184.07
$
0 M -Ton Excavator (Cat 330)
$194.40
$
3 M -Ton Excavator (Cat 336)
$208.88
S
:5 M -Ton Excavator (Cat 345)
$276.33
$
:9 M -Ton Excavator (Cat 349)
$308.14
S
,5 M•Ton Excavator (Cat 385)
$543.90
$
oader (Cat 930K)
$103.41
S
1,000 Ib. Dozer (Cat D5K)
$93.07
S
3,000 lb. Dozer (Cat D6N)
$155.78
S
1 CY Scraper (Cal SC613)
$186.13
$
17 CY Scraper (Cat SC615)
$248.17
$
195 HP Tractor & Disk
$153.04
$
50 HP Tractor & 17 CY Scraper
$187.17
$
5 -Ton Off Road Truck
$238.86
$
,-)-Ton Off Road Truck
5266.79
S
5 Ton Off Road Truck
$307.65
S
,4 )-Ton Off Road Truck
$330.89
S
Subcontractors
Oty. Ea. Hours Used Hourly Rate
Extension
Description
Qty Ea Hourly Rate Hours
Extension
T rucking
S 102.00
$
MITI (Daily Rate)
S 7,200.00
$
Mill (Daily Rate)
$ 4,800.00
$
Compactor
$
S -
5
IPIate
Auto Level
S -
4.17
$
$
786.1:
MATERIALS
Materials Used (Units) Qty Ea Rate Extension
S
S
S -
S -
S
Small Tools
Oty. Ea. Hours Used Hourly Rate
Extension
Chainsaw
$
3.42
S
Chopsaw
$
3.42
$
Leaf Blower
$
1.17
S
Compactor
$
19.86
5
IPIate
Auto Level
S
4.17
$
Pipe Laser
$
6.48
S
5 KW Gen.
$
5.08
S
Trench Box
$
14.74
S
Manhole Box
S
13.77
S
2' Gas Pump
S
4.43
S
3" Pum No Gen. 24 hr.
$
5.37
$
3" Pump (Dail)
$
105.00
$
4" Pump -No Gen. 24 hr.
S
10.26
S
4" Pump (Dail)
S
125.00
S
6" Pump -No Gen. 24 hr.
S
11.93
S
6" Pum (Daily)
$
350.00
$
20 KW Gen. 24 hr.
$
12.51
S
40 KW Gen. 24 hr.
S
21.89
S
56 KW Gen. 24 hr.
$
27.23
$
100 KW Gen. 24 hr.
$
38.57
S
150 KW Gen. 24 hr.
$
54.52
S
200 KW Gen. 24 hr.
S
66.18
S
12" Chipper
S
74.83
S
Walk Saw(Daily)
$
400.00
$
P. Washer (Daily)
J S
325.00
S
Billing Summary
Labor
2,447.87
20%
489.57
FICA, WC, UTA
20%
489.57
Equipment & Small Tools
4,215.42
12%
505.85
25%.
Subcontractor
Up to 3K:
25%
After 3K:
25%.
Bond
0.0%
TOTAL S
$4,404.58
P� 5
Daily Work Sheet
Name
Union
Class
Rel ?
Hours
oft7ae
Equip. opor
Hours
Meter Rdg
Trucks
Rett
Hours
. tod.
03
oP
11
_
r
(r V.S
L)"
DAL
01\1
0 A -SDFP,,
-
l) ',
610 Pt,.S q-
-
CDL Driver's Name
Start Time
Stop Time
Notes
Name Job Date: .�
Aman Weather
:s
;405
Daily Work Shoot
N8rY,1,e[
Union
Class
Rs
ours
bf fca
Equlp. Oper
Houra
Meter Adg
Trucks
fief#
Houra
ry
Q
r'3DL Driver's Name
Start Tune
Stop Time
Notes
�i�'i G1�Ti�t
G`GU
s•�
`�
Items 0 m leted . Materials Received
-Re-f.' Description QtV Com lets Station or Location MU - Qty. -Item - Source - Refd
L
'Jame Zuc"'Ra Joh # _
aman Weather
71
j4.3
Date;