HomeMy WebLinkAbout333473 12/14/18 �o�c�qM
�/ CITY OF CARMEL, INDIANA VENDOR: 068025
ONE CIVIC SQUARE CROSSROAD ENGINEERS, PC CHECK AMOUNT: $****12,807.79*
:9 F J��; CARMEL, INDIANA 46032 B3417 S EECH GROVE AN DR CHECK NUMBER: 333473
9rori�°• CHECK DATE: 12/14/18
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
2200 R4340100 33451 181457 8,732.54 2016 ON CALL PLAN REV
2200 R4340100 33753 181458 3,785.00 2016 ON-CALL ENG SERV
203 4350900 101752 181575 58.05 INDOT LPA CONSTRUC IN
900 4359042 101752 181575 232.20 INDOT LPA CONSTRUC IN
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201 (Rev.1995)
Vendor# 068025 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
CROSSROAD ENGINEERS, PC IN SUM OF$ CITY OF CARMEL
3417 S SH ERMAN DR An invoice or bill to be properly itemized must show,kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
BEECH GROVE, IN 46107
Payee
$290.25
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
Engineering
Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
101752 181575 43-509.00 $58.05 1 hereby certify that the attached invoice(s),or 12/5/18 181575 Guilford Road Reconstruction-Inspection $58.05
2200 203 2200 203
101752 181575 43-590.42 $232.20 bill(s)is(are)true and correct and that the 12/5/18 181575 Guilford Road Reconstruction-Inspection $232.20
2200 900 materials or services itemized thereon for 2200 900
which charge is made were ordered and
received except
Friday, December 14,2018
Jeremy Kashman
Director
I hereby certify that the attached invoice(s), or bill(s), is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
, 20
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
317-780-1555
City of Carmel P.O. to l q s2 Invoice number 181575
Jeremy Kashman 0o-415 q 0 L4 2- *IS 2.'Z O Date 12/05/2018
1 Civic Square 4 5 B. OS
Carmel, IN 46032 X03 ^ ~3 s�� 0 o Project GUILFORD RD.-CITY CENTER DR.TO
MAIN ST. (DES#1383180)
For services performed October 27,2018 through November 30,2018.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our contract LPA-Consulting contract dated July 5,2018, and
Notice to Proceed dated October 25,2018.
Des. No. 1383180
R-36906
P.O.#101752(CUM Cap Fund&Grant Fund)
Professional Fees
Construction Inspection
Billed
Hours Rate Amount
Director
Trent E. Newport 1.00 166.47 166.47
Project Inspector
Justen J.Hochstetler 2.00 61.89 123.78
Phase subtotal 3.00 290.25
i
r
Invoice total 290.25
Invoice Summary
Contract Prior Current Total
Description Amount Billed Billed Billed Remaining
CONSTRUCTION INSPECTION 468,400.00 0.00 290.25 290.25 468,109.75
Total 468,400.00 0.00 290.25 290.25 468,109.75
City of Carmel Invoice number 181575 Invoice date 12/05/2018
Page 1
Guilford Rd.-City Center t)r.to Main St.(DES#1'385180)
Construction Inspection
Date Range from:1:0/2712018 to 11150/2018 Work n Prog ss
Employeae/Actvitt' _ total Billed 1NIP'TKra l Billable.._ Defer"red. HIld N n Billabl !Writeoff
teofF
,. .__
Ousten J.Hochstetler 2.00 2.00
1
Billable Time 2.00 2.00
Date Total Billed WIP Total Billable Deferred Hold Non Billable
11/12/2018 2.00 2.00
Trent E.Newport 1.00 1.00
Billable Time 1.00 1.00
Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff
11/24/2018 1.00 1.00
f Total 3.00 3.00 1.00;
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201 (Rev.1995)
Vendor# 068025 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
CROSSROAD ENGINEERS, PC IN SUM OF$ CITY OF CARMEL
3417 S SH ERMAN DR An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
BEECH GROVE, IN 46107
Payee
$3,785.00
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
Engineering
Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
33753 181458 43-401.00 $3,785.00 1 hereby certify that the attached invoice(s),or 12/5/18 181458 On-Call Engineering and Inspection Services $3,785.00
2200 Encumbered 2200 2200 2200
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Friday, December 14,2018
Jeremy Kashman
Director
I hereby certify that the attached invoice(s),or bill(s), is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
20
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
� 1
Cross Road Engineers,PC
3417 Sherman Drive
Beech Grove, IN 46107
317-780-1555
City of Carmel Invoice number 181458
Jeremy Kashman Date 12/05/2018
1 Civic Square P. O. 3353
Carmel, IN 46032 7200 — f 00 Project CITY OF CARMEL-ON CALL
ENGINEERING AND INSPECTION
SERVICES
For services performed October 27,2018 through November 30,2018.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with Agreement for Professional Services dated March 16,2016
and Additional Services Agreement approved May 18,2016.
ASA#5 PO 33753
Professional Fees
Midtown Development Typical Section Plan
Billed
Units Rate Amount
Project Manager
William F.Hall II 2.00 115.00 230.00
5th Street Drainage Report
Billed
Units Rate Amount
Director
Trent E. Newport 1.00 155.00 155.00
Project Manager
William F.Hall II 2.50 115.00 287.50
Project Engineer
Michael S. Kalberg 18.00 100.00 1,800.00
Phase subtotal 2,242.50
96th&Keystone Remnant Parcel
Billed
Units Rate Amount
Director
Trent E. Newport 0.50 155.00 77.50
CADD Technician
Chris Lee 9.00 85.00 765.00
Phase subtotal 842.50
City of Carmel Invoice number 181458 Invoice date 12/05/2018
Page 1 of 3
City of Carmel Invoice number 181458
�z Project CITY OF CARMEL-ON CALL ENGINEERING AND INSPECTION SERVICES Date 12/05/2018
Professional Fees
96th and Keystone IPL easement reviews
Billed
Units Rate Amount
Director
Trent E. Newport 1.00 155.00 155.00
CADD Technician
John D.Whiteside 1.00 85.00 85.00
Phase subtotal 240.00
2016 Standard Drawings Revisions
Billed
Units Rate Amount
Project Manager
William F. Hall II 2.00 115.00 230.00
Professional Fees subtotal 37.00 3,785.00
Invoice total 3,785.00
Invoice Summary
Contract Prior Current Total
Description Amount Billed Billed Billed Remaining
MIDTOWN DEVELOPMENT TYPICAL SECTION 0.00 0.00 230.00 230.00 -230.00
PLAN
5TH STREET DRAINAGE REPORT 0.00 0.00 2,242.50 2,242.50 -2,242.50
MONON DITCH WETLAND DELINEATION 0.00 0.00 0.00 0.00 0.00
96TH&KEYSTONE REMNANT PARCEL 0.00 0.00 842.50 842.50 -842.50
96TH AND KEYSTONE IPL EASEMENT REVIEWS 0.00 340.00 240.00 580.00 -580.00
LITTLE LIBRARY EASEMENT 0.00 282.50 0.00 282.50 -282.50
MAYFLOWER PARK ESTIMATES 0.00 360.00 0.00 360.00 -360.00
ARTS DISTRICT SIGN REVISED EASEMENTS 0.00 410.00 0.00 410.00 -410.00
103RD ST. &ILLINOIS ST. 0.00 1,980.00 0.00 1,980.00 -1,980.00
ICE RINK COORDINATE SURVEY 0.00 990.00 0.00 990.00 -990.00
EMERSON/CARMELVIEW ASBUILTS 0.00 3,302.50 0.00 3,302.50 -3,302.50
ALLEY EAST OF RANGELINE&SOUTH OF 4TH 0.00 742.50 0.00 742.50 -742.50
DUKE PARCEL RW DESCRIPTIONS 0.00 1,425.00 0.00 1,425.00 -1,425.00
4TH STREET ENVIRONMENTAL DOCUMENT 0.00 1,365.00 0.00 1,365.00 -1,365.00
2016 STANDARD DRAWINGS REVISIONS 0.00 13,767.50 230.00 13,997.50 -13,997.50
3RD AVE&4TH AVE SW&VETERANS WAY 0.00 3,172.50 0.00 3,172.50 -3,172.50
DESCRIPTIONS
106TH STREET CULVERT REPLACEMENT 0.00 0.00 0.00 0.00 0.00
12424 WINDSOR DRIVE-PIPE SIZE 0.00 0.00 0.00 0.00 0.00
VERIFCATION
2016 BOND PROJECTS 0.00 10,569.00 0.00 10,569.00 -10,569.00
BRYGGER HENNEBERRY DITCH SURVEY 0.00 0.00 0.00 0.00 0.00
GUILFORD PATH- 116TH TO CITY CENTER 0.00 0.00 0.00 0.00 0.00
DRIVE
ILLINOIS STREET INSPECTION 0.00 76,020.76 0.00 76,020.76 -76,020.76
KEYSTONE AND MAIN ST LANDSCAPING 0.00 12,045.20 0.00 12,045.20 -12,045.20
INSPECTION
City of Carmel Invoice number 181458 Invoice date 12/05/2018
Page 2 of 3
City of Carmel Invoice number 181458
Pro,
ject CITY OF CARMEL-ON CALL ENGINEERING AND INSPECTION SERVICES Date 12/05/2018
Invoice Summary
Contract Prior Current Total
Description Amount Billed Billed Billed Remaining
MISCELLANEOUS INSPECTION 0.00 48,726.44 0.00 48,726.44 -48,726.44
TYNER PARCEL TITLE WORK 0.00 0.00 0.00 0.00 0.00
UNALLOTTED FUNDS 187,093.47 0.00 0.00 0.00 187,093.47
Total 187,093.47 175,498.90 3,785.00 179,283.90 7,809.57
City of Carmel Invoice number 181458 Invoice date 12/05/2018
Page 3 of 3
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201 (Rev.1995)
Vendor# 068025 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
CROSSROAD ENGINEERS, PC IN SUM OF$ CITY OF CARMEL
3417 S SH ERMAN DR An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
BEECH GROVE, IN 46107
Payee
$8,732.54
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
Engineering
Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
33451 181457 43-401.00 $8,732.54 1 hereby certify that the attached invoice(s), or 12/5/18 181457 On-Call Plan Review $8,732.54
2200 Encumbered 2200 2200 2200
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Friday, December 14,2018
Jeremy Kashman
Director
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
20
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
i
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
317-780-1555
City of Carmel P G 3 ILI S l Invoice number 181457
Jeremy Kashman Date 12/05/2018
1 Civic Square zzoo— %43 y.ot Od
Carmel, IN 46032 Project CITY OF CARMEL-ON-CALL PLAN
REVIEW 2018
For services performed October 27,2018 through November 30,2018.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with Agreement for Professional Services dated March 16,2016.
ASA#23 PO#33451
General Plan Review
Professional Fees
Billed
Hours Rate Amount
Senior Project Manager 0.50 130.00 65.00
Project Manager 10.00 115.00 1,150.00
Professional Fees subtotal 10.50 1,215.00
Phase subtotal 1,215.00
Camferdam Property-18110010 PP
Professional Fees
Billed
Hours Rate Amount
Project Engineer 1.00 100.00 100.00
Dual Brand Hotel -18100015 DP/ADLS
Professional Fees
Billed
Hours Rate Amount
Project Manager 9.00 115.00 1,035.00
Project Engineer 9.50 100.00 950.00
Professional Fees subtotal 18.50 1,985.00
Reimbursables
Billed
Units Rate Amount
Miles 77.00 0.52 40.04
Phase subtotal 2,025.04
City of Carmel Invoice number 181457 Invoice date 12/05/2018
Page 1 of 3
City of Carmel Invoice number 181457
Project CITY OF CARMEL-ON-CALL PLAN REVIEW 2018 Date 12/05/2018
Freddy's Frozen Custard-18100015 DP/ADLS
Professional Fees
Billed
Hours Rate Amount
Project Manager 1.00 115.00 115.00
Project Engineer 6.50 100.00 650.00
Professional Fees subtotal 7.50 765.00
Phase subtotal 765.00
Mullberry Lane Minor Subdivision-16060009 SP
Professional Fees
Billed
Hours Rate Amount
Project Manager 1.50 115.00 172.50
Project Engineer 6.00 100.00 600.00
Professional Fees subtotal 7.50 772.50
Phase subtotal 772.50
Nottingham Outlots-
Professional Fees
Billed
Hours Rate Amount
Project Engineer 3.50 100.00 350.00
Onyx Office Suites-18090015 DP/ADLS
Professional Fees
Billed
Hours Rate Amount
Project Manager 4.00 115.00 460.00
Project Engineer 4.00 100.00 400.00
Professional Fees subtotal 8.00 860.00
Phase subtotal 860.00
Pennwood Professional Park-18070013 ADLS Amend
Professional Fees
Billed
Hours Rate Amount
Project Manager 0.50 115.00 57.50
Project Engineer 4.00 100.00 400.00
Professional Fees subtotal 4.50 457.50
Phase subtotal 457.50
Sherman Drive Townhomes-18090013 DP/ADLS
Professional Fees
Billed
Hours Rate Amount
Project Manager 1.50 115.00 172.50
Project Engineer 12.00 100.00 1,200.00
Professional Fees subtotal 13.50 1,372.50
Phase subtotal 1,372.50
Tom Wood Jaguar Land Rover Volvo Remodel-18020009 ADLS Amend
Professional Fees
Billed
Hours Rate Amount
Project Engineer 5.00 100.00 500.00
City of Carmel Invoice number 181457 Invoice date 12/05/2018
Page 2 of 3
City of Carmel Invoice number 181457
Project CITY OF CARMEL-ON-CALL PLAN REVIEW 2018 Date 12/05/2018
West Bridge PUD-18010004 Z
Professional Fees
Billed
Hours Rate Amount
Project Manager 0.50 115.00 57.50
Westclay Uptown Development-18080016 TAC
Professional Fees
Billed
Hours Rate Amount
Project Manager 0.50 115.00 57.50
Project Engineer 2.00 100.00 200.00
Professional Fees subtotal 2.50 257.50
Phase subtotal 257.50
Invoice total 8,732.54
City of Carmel Invoice number 181457 Invoice date 12/05/2018
Page 3 of 3
2016 COIT&G.O.Bond Midtown Ant SM'sllgo"SM
Monon Trail Reconstruction-City Cen er to Main1 -ENG- 2
Construction Inspection.
-a Range from: ASUEZU
Total
Curtis M Holcom
Billable Time 191.00 191.00,
Date Total Billed WIPTotal Billable Deferred Hold Non Billable Writeoff
10/29/2018 10.50 10.50
10/30/2018 10.50 10.50
10/31/2018 7.00 7.00
11/1/2018 12.00 12.00
11/2/2018 6.00 6.00
11/3/2018 7.50 7.50
11/5/2018 10.00 10.00
11/6/2018 11.00 11.00
11/7/2018 8.00 8.00
11/8/2018 10.00 10.00
11/9/2018 9.50 9.50
11/12/2018 10.00 10.00
11/13/2018 10.00 10.00
11/14/2018 9.50 9.50
11/15/2018 8.00 8.00
11/16/2018 7.50 7.50
11/19/2018 10.00 10.00
11/20/2018 9.00 9.00
11/21/2018 9.00 9.00
11/26/2018 9.50 9.50
11/27/2018 6.50 6.50
David Webster 161.00 151.00
Billable Time 151.00 161.00
Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff
1117/2018 12.00 12.00
11/8/2018 10.50 10.50
11/9/2018 9.50 9.50
11/10/2018 5.00 5.00
11/12/2018 10.50 10.50
11/13/2018 10.00 10.00
2016 COIT&G.O.Bond-Midtown East Des'gn
Monon rail Reconst uct'on-City Center to Main1 -ENG-22
Constrwctfo Inspeetio
Date Range from:10/2712018 to 11/30/2018 4Vor In Progress
Employee/Actiuity Total Billed WIP Total Billable Deferred Hold Non Billable Wri eoff
11/14/2018 9.00 9.00
11/1512018 7.00 7.00
11/16/2018 8.00 8.00
11/19/2018 9.50 9.50
11/20/2018 9.00 9.00
11/21/2018 7.00 7.00
11/26/2018 9.00 9.00
11/27/2018 8.50 8.50
11/28/2018 9.50 9.50
11/29/2018 8.00 8.00
11/30/2018 9.00 9.00
Justen J.Hochstetler 210.50 210.50
Billable Time 210.50 210.50
Date Total Billed WIPTotal Billable Deferred Hold Non Billable Writeoff
10/27/2018 7.00 7.00
10/29/2018 10.50 10.50
10/30/2018 9.00 9.00
10/31/2018 8.50 8.50
11/1/2018 9.50 9.50
111/2/2018 9.00 9.00
11/5/2018 10.00 10.00
11/6/2018 9.00 9.00
11/7/2018 10.00 10.00
11/8/2018 9.00 9.00
11/9/2018 7.50 7.50
11/12/2018 8.50 8.50
11/13/2018 10.00 10.00
11/14/2018 9.00 9:00
11/15/2018 8.00 8.00
11/16/2018 7.00 7.00
11/19/2018 9.50 9.50
11/20/2018 9.50 9.50
11/21/2018 6.00 6.00
2016 COLT&G.O.Bond-Mi East Destgn
Monan Trail Reconstruction-City Center to ain16-€ G-22
Construe#ion 1 spection
Date Range from:10/27/2018 to 11/30/2018 Work In Progress
Employee/Activity Tota Billed WIP Total Billable Deferred Hod Non Billable Writeoff
11/26/2018 9.50 9.50
11/27/2018 9.00 9.00
11/28/2018 10.00 10.00
11/29/2018 9.00 9.00
11/30/2018 6.50 6.50
Lance A's'Statiley 142:00 142 00
Billable Time 142.00 142.'0
Date Total Billed WIPTotal Billable Deferred Hold Non Billable Writeoff
10/29/2018 8.00 8.00
10/29/2018 1.00 1.00
10/30/2018 7.00 7.00
10/30/2018 2.00 2.00
10/31/2018 7.00 7.00
11/1/2018 8.00 8.00
11/1/2018 1.00 1.00
11/2/2018 8.00 8.00
11/2/2018 1.00 1.00
11/5/2018 9.00 9.00
11/6/2018 10.00 10.00
11/7/2018 8.00 8.00
11/9/2018 3.00 3.00
11/12/2018 10.00 10.00
11/14/2018 2.00 2.00
11/15/2018 2.00 2.00
11/19/2018 8.00 8.00
11/20/2018 2.00 2.00
11/21/2018 1.00 1.00
11/2612018 7.00 7.00
11/26/2018 2.00 2.00
11/27/2018 7.00 7.00
11/27/2018 2.00 2.00
11/28/2018 8.00 8.00
11/28/2018 1.00 1.00
2016 COIT&G.O.Bond-Midtown E st Besign
onon rai Recons ruction-0-ty Ce er to Main1ME G 22
Construction Inspection
Bate Range from:10127!2018 to 11/80/2018 Work n Progress
EmployeelActiuity Total Billed WIP Total Billable Referred Hold Non Billable Writeoff
11/29/2018 6.00 6.00
11/29/2018 2.00 2.00
11/30/2018 8.00 8.00
11130/2018 1.00 1.00
Scottie Saylor 199,OO;r 999 00 ,..
Billable Time '199.00 199.00
Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff
10/29/2018 10.50 10.50
10/30/2018 10.50 10.50
10/31/2018 8.00 8.00
11/1/2018 8.50 8.50
11/5/2018 9.00 9.00
11/6/2018 11.00 11.00
11/7/2018 10.00 10.00
11/8/2018 10.00 10.00
11/9/2018 9.50 9.50
11/10/2018 1.50 1.50
11/12/2018 9.00 9.00
11/13/2018 9.00 9.00
11/14/2018 10.00 10.00
11/15/2018 6.50 6.50
11/16/2018 2.50 2.50
11/16/2018 4.50 4.50
11/19/2018 8.50 8.50
11/20/2018 9.00 9.00
11/21/2018 7.50 7.50
11/26/2018 9.00 9.00
11/27/2018 8.50 8.50
11/28/2018 9.00 9.00
11/29/2018 9.50 9.50
11/30/2018 4.00 4.00
11/30/2018 4.00 4.00
2016 C-1 8 G.O.B-ondMM i-dLUwZn3East II)-
gl
,.,esi n.,
Trail lRe-Fonstrucu Mity,00-ter -ENG-22
Construction Inspeeticn
Date11/30/2018 Work to Progress
Employee.
. lAc
.y,
,c tivit 1� 0 MFf-;5l7d1jLW6-n Billable Writeoff
j
�Trent
.60
Billable Time 36.00 36.00
Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff
10/29/2018 1.00 1.00
10/3012018 2.00 2.00
10/31/2018 1.00 1.00
1111/11/2018 2.00 2.00
11/2/2018 2.00 2.00
11/5/2018 1.00 1.00
11/6/2018 3.00 3.00
.1117/2018 1.00 1.00
11/8/2018 1.00 1.00
11/9/2018 1.00 1.00
11/1212018 1.00 1.00
11/13/2018 2.00 2.00
11/14/2018 2.00 2.00
11/15/2018 1.00 1.00
11/16/2018 2.00 2.00
11/17/2018 2.00 2.00
11/1912018 1.00 1.00
11/20/2018 2.00 2.00
11/26/2018 1.00 1.00
11/27/2018 2.00 2.00
11/28/2018 1.00 1.00
11/29/2018 2.00 2.00
11/30/2018 2.00 2.00
[William F.Hall 11 -48M 48,00
Billable Time 48'.00 48-.00-
Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff
10/2912018 3.00 3.00
10/30/2018 4.00 4.00
10/31/2018 2.50 2.50
11/11/20118 2.50 2.50
rai
i n
D--
to
0 1
Em 9V3
to
j tl
A Is a
L!V,
11/2/2018 1.00 1.00
11/5/2018 2.50 2.50
11/6/2018 3.50 3.50
11/7/2018 2.00 2.00
11/8/2018 2.00 2.00
11/12/2018 1.00 1.00
11/13/2018 3.50 3.50
11/14/2018 2.00 2.00
11/15/2018 1.50 1.50
11/16/2018 2.00 2.00
11/19/2018 3.00 3.00
11/20/2018 3.50 3.50
11/26/2018 2.00 2.00
11/27/2018 3.00 3.00
11/29/2018 1.00 1.00
11/30/2018 2.50 2.50
Total 977.50 977.50