Loading...
HomeMy WebLinkAbout000 cover sheetC 3 CARSON DESKN ASSOCIATES Architecture / Design Contact Carson Design Associates 9229 Delegates Row Andrea Cole Suite 250 Phone: 317.843.3768 Indianapolis, IN 46240 acole@carsondesign.com RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 01 /03/19 Chrome Fitness Chrome Fitness Suite 140 & 142 890 E 111 St. , Carmel, IN 46032 1820007 I. Refer to attached M, E, & P drawings for more information. If drawings are not included and scope requires M, P, or E work Contractor shall provide design build - design and permitting services for the scope required for a successful project. 2. The design and installation of all MEP systems shall comply with the current Codes in force by the AHJ at the project location. Any required energy compliance or environmental reports required by the AHJ shall be prepared by the Contractor if not provided by the Owner or Architect's consultants. 3. Contractor to field verify all existing building conditions and systems affected by the project work and be familiar with the drawings and project requirements prior to bid or contracting with Owner. No structural cuffing, coring, or drilling shall be performed that impacts any part of the existing facility, without prior approval. Contractorshall retain the services of a structural engineer, if required by the Architect, Owner, or AHJ to obtain a required approval. 4. Architectural drawing have been provided to show the locations of all devices and systems. Contractor shall be responsible for reconfigurations, modifications, and/or new work needed to provide a complete functioning job without permanently disrupting existing building systems. Contractor shall coordinate with Owner, Building Facilities, and or other Tenants 48 hours minimum in advance of any interruption of any building service. 5. Architectural drawings shall fake precedence over all other trades drawings when conflicts arise. Contractor to bring conflicts or inconsistencies between the architectural drawings and the drawing of other trades to the attention of the architect prior to bid, order, or installation. 6. Fire sprinkler modifications and new work shall be designed by a licensed fire sprinkler system designer in the state the project resides in, and must be installed by a state licensed installer. Contractor shall obtain any required approvals from the AHJ prior to start of construction. 7. Zoning of MEP systems shall be exclusive to the project area without cross over to other building areas, except as is indicated on the documents or as approved in advance. 8. Contractor to provide all required test and balance reports. O&M manuals, and commissioning activities required by the AHJ or project requirements in the appropriate phases of the project. 9. Existing hard duct to remain as is. No new ductwork required. Re -work flexible duct to new diffuser locations. Note: E.C. and/or design build contractor is to verify that project meets Indiana ASH RAE 90.1 energy codes. Design intent is to be within wafts per square foot. Provide energy monagment controls, such as sensor controls (ultrasonic and motion defection) and/or relay time clocks, as required by the code. Indiana required energy compliance report (ComCheckl 's the responsibility of the owner or owners representative. Drawings, specifications and energy control devices are shown with the intent of meeting current state energy codes. Submitting party is to al en designer and owner of any additional devices or load changes necessary to adhere to the code prior to submission of ComCheck. Drawing Index Sheet Number Sheet Name A000 Cover Sheet A001 Genera l In formation and Stands rd Do a its A002 20091CC/ANSI A117J A003 20091CC/ANSI A117.1 Restrooms & Parking A011 Code Information A021 Project Standards A201 Demolition Han A201.1 Demolition RCP Plan A211 Construction Floor Plan A221 Reflected Ceiling Plan A231 Electrical Location & Equipment Plan A241 Finish Plan and Notes A600 Door Notes, Elevations, and Details A601 Door Schedule This project consists of the demolition and finish out of an existing and expansion of a demised tenant suite. Suite occupancy classification and use group remained unchanged by the scope of this work in the existing suite. Suite occupany classification and use group changed by the scope of this work for the expansion of this suite. Minor mechanical and ductwork relocations to accommodate new partition layout. Electrical circuits to accommodate new tenant equipment loads and locations. Key Plan / Area of Work <N N PLAN TRUE Area Map caoeme Me.maa" Project Location ArHh.. OPeA Car &T & Lem ortff imoe si so ©mm"o:Paz. Q °a:i�n m�rclmm�e - =mewnao-eDance nwm-c.m.rix + E116t6 i1 - E116th& E11G Eller& N C 3 CARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Pax 317.843.5975 SOUTHWEST 12301 Research Blvd Bldg IV -Suite 130 Austin, Tx 78759 Tel 512.977.0520 Fax 512.977.0384 www.carsondesign.com CV C•0 O V1 'O V1 � tin �N C .� E N U r ; EC C N O s UNNO U w O DO STAMP: PRELIMINARY Not For regulatory approval, permitting, or construction Scott Perez Indiana Registered Architect AR19500095 ISSUE: L� For Client Review DRAWING Cover Sheet JOB NO. 11820007 DATE SHEET NUMBER: A000 COoRaRITTIS CAc0`J mom AswaATzz.